Project intelligenceTDLR TABS2026018298New Construction
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Bexar County ESD #12 New Station No. 3 Temporary Facilities in Saint Hedwig, TX

3354 E. FM 1518 N., Saint Hedwig, TX, 78152

Opening ~Jan 2027Review Complete

Bexar County ESD #12 New Station No. 3 Temporary Facilities is a new construction project at 3354 E. FM 1518 N., Saint Hedwig, in Bexar County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Jan 2027. The project has an estimated value of $4.0M across about 7,200 sq ft.

Estimated project value
$4.0M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
7,200 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$556/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
8 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

Explore the linked construction record and source history

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Apr 22, 2026283 days across supplied datesJan 30, 2027

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    29 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    11 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    243 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About Bexar County ESD #12 New Station No. 3 Temporary Facilities

Bexar County ESD #12 New Station No. 3 Temporary Facilities is a new 7,200 sq ft construction project located at 3354 E. FM 1518 N. in Saint Hedwig. The project, valued at $4,000,000, is scheduled to finish in January 2027, with construction beginning in June 2026. This facility will provide dedicated storage spaces for fire apparatus and include restrooms, addressing the district's need for expanded operational capacity in the area.

Project Scope and Design

The construction scope includes the erection of the main building along with necessary site work and utilities. These utilities support modular buildings that were designed by other firms, creating a comprehensive site layout for the emergency services district. The design firm of record is Debra J. Dockery, Architect, P.C., which has registered six other projects with TDLR totaling $19,700,000. This includes the COSA Fire Station No. 21 in San Antonio and the Guadalupe County Precinct 4 Marion Building.

Stephen A. Meyer is the registered accessibility specialist for this project. The filing indicates that the project involves public funds and public land, or is a Federally funded roadway project. TDLR completed the plan review in May 2026, clearing the path for the construction phase to proceed as outlined in the registration documents.

Local Context and Cost Analysis

The estimated cost of $556 per square foot is above the county median of $115 per square foot for new construction filings in Bexar County. The total project cost is also above the county median of $600,000. The scheduled build window of 243 days is close to the county median of 208 days for similar new construction projects. This places the project within a typical timeframe for a facility of this scale and complexity.

Saint Hedwig is a small community with a population of about 3,958 according to U.S. Census ACS 2023 five-year estimates. The median household income in the ZIP code 78152 is $102,212, and the median owner-occupied home value is $292,800. The housing stock is predominantly owner-occupied, reflecting the stable residential character of the area where this new emergency facility is being developed.

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 78152 (Saint Hedwig)

One email per change. Unsubscribe in one click. Privacy.

Bexar County ESD #12 New Station No. 3 Temporary Facilities is a New Construction project located at 3354 E. FM 1518 N., Saint Hedwig, TX 78152 in Saint Hedwig, Texas. The project has an estimated value of $4.0M covering 7,200 sq ft. Bexar County Emergency Services District #12 is the property owner and Debra J. Dockery, Architect, P.C. is the design firm of record. The project was registered with TDLR on April 22, 2026.

Frequently Asked Questions

When is the Bexar County ESD #12 fire station expected to be finished?

Construction is scheduled to finish in January 2027. The project started in June 2026, following the completion of plan review by TDLR in May 2026. This timeline aligns with the 243-day build window specified in the filing.

What is the total cost of the new fire station project?

The estimated cost for the new 7,200 sq ft building is $4,000,000. This figure includes the construction of the main structure, site work, and utilities for the modular buildings designed by other firms.

Who is the design firm for this fire station?

Debra J. Dockery, Architect, P.C. is the design firm of record. The firm has registered other projects with TDLR, including a $10,000,000 fire station in San Antonio and a $2,300,000 building in Marion.

Is the fire station open for public use?

No, the facility is under construction. The project is scheduled to finish in January 2027, and the TDLR record only covers construction status, not operational opening dates or business hours.

What is Bexar County ESD #12 New Station No. 3 Temporary Facilities?

Bexar County ESD #12 New Station No. 3 Temporary Facilities is a new construction project at 3354 E. FM 1518 N. in Saint Hedwig, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: New 7,200 sf building for fire apparatus with storage spaces and restrooms. Site work and utilities for modular buildings designed by others.

Is Bexar County ESD #12 New Station No. 3 Temporary Facilities open in Saint Hedwig?

Bexar County ESD #12 New Station No. 3 Temporary Facilities is still under construction in Saint Hedwig, TX, with an estimated completion of Jan 2027 according to its TDLR registration.

Where is Bexar County ESD #12 New Station No. 3 Temporary Facilities located?

Bexar County ESD #12 New Station No. 3 Temporary Facilities is located at 3354 E. FM 1518 N., Saint Hedwig, TX, 78152, in Bexar County.

Who is the owner or developer of Bexar County ESD #12 New Station No. 3 Temporary Facilities?

Bexar County Emergency Services District #12 is the property owner/developer of record for Bexar County ESD #12 New Station No. 3 Temporary Facilities, per its TDLR project registration.

Who is the architect or design firm for Bexar County ESD #12 New Station No. 3 Temporary Facilities?

Debra J. Dockery, Architect, P.C. is the design firm of record for Bexar County ESD #12 New Station No. 3 Temporary Facilities, according to its TDLR filing.

How much does Bexar County ESD #12 New Station No. 3 Temporary Facilities cost and how big is it?

Bexar County ESD #12 New Station No. 3 Temporary Facilities has an estimated construction value of $4.0M and approximately 7,200 square feet (about $556/sqft), based on its TDLR filing.

Scope of Work

New 7,200 sf building for fire apparatus with storage spaces and restrooms. Site work and utilities for modular buildings designed by others.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

3354 E. FM 1518 N., Saint Hedwig, TX, 78152

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 78152 (Saint Hedwig)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Saint Hedwig?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.