Comal County Emergency Services District #5 Fire Station 75 in Bulverde, TX
27534 State Highway 46, Bulverde, TX, 78163
Comal County Emergency Services District #5 Fire Station 75 is a new construction project at 27534 State Highway 46, Bulverde, in Comal County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Oct 2026 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $2.2M across about 4,910 sq ft.
- Estimated project value
- $2.2M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 4,910 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $448/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 4 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
11 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
43 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
122 days after the preceding date shown.
Source: TDLR filing
View source record
📰About Comal County Emergency Services District #5 Fire Station 75
Comal County Emergency Services District #5 is constructing Fire Station 75 at 27534 State Highway 46 in Bulverde. The project involves the ground-up construction of a pre-engineered metal building (PEMB) garage with a total estimated cost of $2,200,000. The facility spans 4,910 square feet, resulting in a computed cost of $448 per square foot.
The design firm of record is Method Architecture, and Attila Huszka serves as the registered accessibility specialist. The project was registered with the Texas Department of Licensing and Regulation (TDLR) in April 2026. TDLR completed the plan review phase in May 2026, and construction is scheduled to finish in October 2026, with work starting in June 2026.
Project Context and Comparisons
This project involves public funds and public land. Compared to 1,315 new construction filings in Comal County, this project's estimated cost is above the county median of $777,000. The median size for such filings is 7,661 square feet, while this project is 4,910 square feet.
The median cost per square foot in the county is $125, whereas this project stands at $448 per square foot. The scheduled build window of 122 days is shorter than the county median of 232 days. The owner, Comal County Emergency Services District #5, has one other TDLR-registered project totaling $200,000. Method Architecture has six other registered projects totaling $11,153,194 across various Texas locations.
According to U.S. Census American Community Survey 2023 five-year estimates for ZIP code 78163, the population is about 17,455. The median household income is $133,681, and the median owner-occupied home value is $431,100. There are 6,609 housing units in the area, with housing predominantly owner-occupied. Comal County unemployment was 4.4 percent in July 2026, higher than a year earlier.
Review Complete
Design review complete, construction may proceed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 78163 (Bulverde)
One email per change. Unsubscribe in one click. Privacy.
Comal County Emergency Services District #5 Fire Station 75 is a New Construction project located at 27534 State Highway 46, Bulverde, TX 78163 in Bulverde, Texas. The project has an estimated value of $2.2M covering 4,910 sq ft. Comal County Emergency Services District #5 is the property owner and Method Architecture is the design firm of record. The project was registered with TDLR on April 22, 2026.
Frequently Asked Questions
Where is Fire Station 75 located?
The station is located at 27534 State Highway 46 in Bulverde, Texas 78163, within Comal County.
What is the estimated cost of construction?
The estimated cost for the ground-up construction of the PEMB garage is $2,200,000.
When is construction scheduled to finish?
Construction is scheduled to finish in October 2026, following a start date of June 2026.
What is Comal County Emergency Services District #5 Fire Station 75?
Comal County Emergency Services District #5 Fire Station 75 is a new construction project at 27534 State Highway 46 in Bulverde, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Ground up Construction of a PEMB Garage
Is Comal County Emergency Services District #5 Fire Station 75 open in Bulverde?
Comal County Emergency Services District #5 Fire Station 75 was scheduled to finish construction in Oct 2026 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.
Where is Comal County Emergency Services District #5 Fire Station 75 located?
Comal County Emergency Services District #5 Fire Station 75 is located at 27534 State Highway 46, Bulverde, TX, 78163, in Comal County.
Who is the owner or developer of Comal County Emergency Services District #5 Fire Station 75?
Comal County Emergency Services District #5 is the property owner/developer of record for Comal County Emergency Services District #5 Fire Station 75, per its TDLR project registration.
Who is the architect or design firm for Comal County Emergency Services District #5 Fire Station 75?
Method Architecture is the design firm of record for Comal County Emergency Services District #5 Fire Station 75, according to its TDLR filing.
How much does Comal County Emergency Services District #5 Fire Station 75 cost and how big is it?
Comal County Emergency Services District #5 Fire Station 75 has an estimated construction value of $2.2M and approximately 4,910 square feet (about $448/sqft), based on its TDLR filing.
Scope of Work
Ground up Construction of a PEMB Garage
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
27534 State Highway 46, Bulverde, TX, 78163
Explore the supplied address
A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.
Related Projects
Same Owner
$2.4M totalWatch all construction in 78163 (Bulverde)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Bulverde?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.