Daikin Applied is a renovation/alteration project at 4509 Freidrich Ln Bldg 4 Unit 401, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $1.0M across about 16,678 sq ft.
Project has been registered with TDLR and is in pre-construction phase
Daikin Applied is a Renovation/Alteration project located at 4509 Freidrich Ln Bldg 4 Unit 401, Austin, TX 78744 in Austin, Texas. The project has an estimated value of $1.0M covering 16,678 sq ft. Exeter 4509 Freidrich LP is the property owner and Gooss + Associates AIA is the design firm of record. The project was registered with TDLR on April 29, 2026.
Daikin Applied is a renovation/alteration project at 4509 Freidrich Ln Bldg 4 Unit 401 in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: 16,678 square foot office expansion into in existing warehouse in an existing building. Demo of existing walls and construction of new offices.
Daikin Applied is currently under construction in Austin, TX. Its current TDLR status is "Project Registered".
Daikin Applied is located at 4509 Freidrich Ln Bldg 4 Unit 401, Austin, TX, 78744, in Travis County.
Exeter 4509 Freidrich LP is the property owner/developer of record for Daikin Applied, per its TDLR project registration.
Gooss + Associates AIA is the design firm of record for Daikin Applied, according to its TDLR filing.
Daikin Applied has an estimated construction value of $1.0M and approximately 16,678 square feet (about $60/sqft), based on its TDLR filing.
16,678 square foot office expansion into in existing warehouse in an existing building. Demo of existing walls and construction of new offices.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Apr 29, 2026
Review Complete
Inspection Complete
Closed
Building permits found at or near this location
Tenant Office Build Out for Suite 100 - No Change of Use No Access Control. No Hazmat as this as spec suite.
Tenant Office Build Out for Suite 100 - No Change of Use No Access Control. No Hazmat as this as spec suite.
Express: Fire damage repair - Please reference AFD incident report - Please reference Engineers report for Required repairs.
Express: Fire damage repair - Please reference AFD incident report - Please reference Engineers report for Required repairs.
Installing a disconnect for the water heater.
Active businesses near this construction site
Business data from Google