Bealls 991 is a renovation/alteration project at 1409 Tahoka Road, Brownfield, in Terry County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jun 2026). The project has an estimated value of $1.0M across about 13,000 sq ft.
๐Project Metrics
TDLR #TABS2026019157Inspection Complete
Final inspection completed, awaiting project closure
Bealls 991 is a Renovation/Alteration project located at 1409 Tahoka Road, Brownfield, TX 79316 in Brownfield, Texas. The project has an estimated value of $1.0M covering 13,000 sq ft. Brownfield Plaza, LP is the property owner and H Design Group is the design firm of record. The project was registered with TDLR on May 1, 2026.
โFrequently Asked Questions
What is Bealls 991?
Bealls 991 is a renovation/alteration project at 1409 Tahoka Road in Brownfield, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Remodel of existing mercantile space to prepare for a new Bealls store
Is Bealls 991 open in Brownfield?
Construction on Bealls 991 is complete โ TDLR records show the project passed its required accessibility inspection in Jun 2026. The building is finished and very likely open.
Where is Bealls 991 located?
Bealls 991 is located at 1409 Tahoka Road, Brownfield, TX, 79316, in Terry County.
Who is the owner or developer of Bealls 991?
Brownfield Plaza, LP is the property owner/developer of record for Bealls 991, per its TDLR project registration.
Who is the architect or design firm for Bealls 991?
H Design Group is the design firm of record for Bealls 991, according to its TDLR filing.
How much does Bealls 991 cost and how big is it?
Bealls 991 has an estimated construction value of $1.0M and approximately 13,000 square feet (about $77/sqft), based on its TDLR filing.
๐Scope of Work
Remodel of existing mercantile space to prepare for a new Bealls store
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
May 1, 2026
Review Complete
May 21, 2026
Inspection Complete
Jun 22, 2026
Closed
20d
Review duration
32d
Construction phase