Accenture 7700 Parmer B3 Phase 2
Accenture 7700 Parmer B3 Phase 2 is a renovation/alteration project at 7700 W Parmer Ln, Suite 350, Austin, in Williamson County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Jun 2027. The project has an estimated value of $520K across about 6,694 sq ft.
๐Project Metrics
TDLR #TABS2026019726Review Complete
Design review complete, construction may proceed
Accenture 7700 Parmer B3 Phase 2 is a Renovation/Alteration project located at 7700 W Parmer Ln, Suite 350, Austin, TX 78729 in Austin, Texas. The project has an estimated value of $520K covering 6,694 sq ft. BRI 1869 Parmer, LLC is the property owner and Studio 8 Architects is the design firm of record. The project was registered with TDLR on May 7, 2026.
โFrequently Asked Questions
What is Accenture 7700 Parmer B3 Phase 2?
Accenture 7700 Parmer B3 Phase 2 is a renovation/alteration project at 7700 W Parmer Ln, Suite 350 in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior renovations to tenant suite with associated mechanical electrical and plumbing costs.
Is Accenture 7700 Parmer B3 Phase 2 open in Austin?
Accenture 7700 Parmer B3 Phase 2 is still under construction in Austin, TX, with an estimated completion of Jun 2027 according to its TDLR registration.
Where is Accenture 7700 Parmer B3 Phase 2 located?
Accenture 7700 Parmer B3 Phase 2 is located at 7700 W Parmer Ln, Suite 350, Austin, TX, 78729, in Williamson County.
Who is the owner or developer of Accenture 7700 Parmer B3 Phase 2?
BRI 1869 Parmer, LLC is the property owner/developer of record for Accenture 7700 Parmer B3 Phase 2, per its TDLR project registration.
Who is the architect or design firm for Accenture 7700 Parmer B3 Phase 2?
Studio 8 Architects is the design firm of record for Accenture 7700 Parmer B3 Phase 2, according to its TDLR filing.
How much does Accenture 7700 Parmer B3 Phase 2 cost and how big is it?
Accenture 7700 Parmer B3 Phase 2 has an estimated construction value of $520K and approximately 6,694 square feet (about $78/sqft), based on its TDLR filing.
๐Scope of Work
Interior renovations to tenant suite with associated mechanical electrical and plumbing costs.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
May 7, 2026
Review Complete
Jun 22, 2026
Inspection Complete
Closed
46d
Review duration
๐Related Projects
๐คSame Owner
$1.7M total๐Related City Permits
Building permits found at or near this location
INTERIOR REMODEL PHASE 2 OF EXISTING OFFICE SPACE
7 DAY - Interior remodel to existing office area - OVA
INTERIOR REMODEL PHASE 2 OF EXISTING OFFICE SPACE
While doing inspection on all power cables found a Polaris tap that was bad and the main wire touching the nut but not inside Polaris tap and can not loosen tap need to replace with new have to have power off to work on
Had the B phase had a short burned part of wire cut section of wire and reinstall wire