Project intelligenceTDLR TABS2026019726Renovation/Alteration
Funding type

This project is privately funded, on private land for private use.

Accenture 7700 Parmer B3 Phase 2 in Austin, TX

7700 W Parmer Ln, Suite 350, Austin, TX, 78729

Opening ~Jun 2027Review Complete

Accenture 7700 Parmer B3 Phase 2 is a renovation/alteration project at 7700 W Parmer Ln, Suite 350, Austin, in Williamson County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Jun 2027. The project has an estimated value of $520K across about 6,694 sq ft.

Estimated project value
$520K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
6,694 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$78/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1 year
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

May 7, 2026390 days across supplied datesJun 1, 2027

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    25 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    21 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    344 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About Accenture 7700 Parmer B3 Phase 2

Accenture 7700 Parmer B3 Phase 2 is a $520,000 interior renovation at 7700 W Parmer Ln, Suite 350, in Austin, Texas. The project covers 6,694 square feet of tenant space within the 7700 Parmer Building B facility. Work focuses on interior alterations and associated mechanical, electrical, and plumbing updates. TDLR completed plan review in June 2026, and construction is scheduled to finish in June 2027, with work starting June 2026.

The project is owned by BRI 1869 Parmer, LLC, a developer with a significant presence in the Austin area. The firm has six other TDLR-registered projects totaling $3,700,380, including adjacent buildings at the same campus. Studio 8 Architects serves as the design firm of record, a practice that has managed other major Austin commercial projects such as the Innovation Tower and Stonebridge Plaza Two. Mark S Robinson is the registered accessibility specialist for this filing.

Project Scale and Cost

At $520,000, the estimated cost places this renovation in the top quarter of Williamson County filings for similar work types. The county median for renovation and alteration projects is $250,000. However, the project’s cost efficiency is notable; at $78 per square foot, it sits below the county median of $95 per square foot. The scheduled build window of 365 days is longer than the county median of 92 days, reflecting the scope of interior systems work involved.

The site is located in ZIP code 78729, an area with a population of about 30,440 and a median household income of $81,589 according to U.S. Census estimates. The neighborhood is primarily renter-occupied, with a median owner-occupied home value of $434,500.

City of Austin permit records show at least 25 permits on file at this street address, with the 25 most recent issued between April 2024 and September 2026. These include building, mechanical, electrical, and plumbing permits. The most recent permit description references an interior remodel phase two of existing office space. This project is privately funded on private land for private use.

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 78729 (Austin)

One email per change. Unsubscribe in one click. Privacy.

Accenture 7700 Parmer B3 Phase 2 is a Renovation/Alteration project located at 7700 W Parmer Ln, Suite 350, Austin, TX 78729 in Austin, Texas. The project has an estimated value of $520K covering 6,694 sq ft. BRI 1869 Parmer, LLC is the property owner and Studio 8 Architects is the design firm of record. The project was registered with TDLR on May 7, 2026.

Frequently Asked Questions

When is construction scheduled to finish?

Construction is scheduled to finish in June 2027. Work started in June 2026, following the completion of TDLR plan review in the same month.

Who is the owner of this project?

The owner of record is BRI 1869 Parmer, LLC. The design firm is Studio 8 Architects, and the registered accessibility specialist is Mark S Robinson.

What is the estimated cost of the renovation?

The estimated cost is $520,000. This figure covers interior renovations to the tenant suite, including associated mechanical, electrical, and plumbing costs.

Is the business open?

The TDLR record tracks construction status, not business operations. The filing indicates construction is scheduled to finish in June 2027, but does not provide information on when the business opens.

What is Accenture 7700 Parmer B3 Phase 2?

Accenture 7700 Parmer B3 Phase 2 is a renovation/alteration project at 7700 W Parmer Ln, Suite 350 in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior renovations to tenant suite with associated mechanical electrical and plumbing costs.

Is Accenture 7700 Parmer B3 Phase 2 open in Austin?

Accenture 7700 Parmer B3 Phase 2 is still under construction in Austin, TX, with an estimated completion of Jun 2027 according to its TDLR registration.

Where is Accenture 7700 Parmer B3 Phase 2 located?

Accenture 7700 Parmer B3 Phase 2 is located at 7700 W Parmer Ln, Suite 350, Austin, TX, 78729, in Williamson County.

Who is the owner or developer of Accenture 7700 Parmer B3 Phase 2?

BRI 1869 Parmer, LLC is the property owner/developer of record for Accenture 7700 Parmer B3 Phase 2, per its TDLR project registration.

Who is the architect or design firm for Accenture 7700 Parmer B3 Phase 2?

Studio 8 Architects is the design firm of record for Accenture 7700 Parmer B3 Phase 2, according to its TDLR filing.

How much does Accenture 7700 Parmer B3 Phase 2 cost and how big is it?

Accenture 7700 Parmer B3 Phase 2 has an estimated construction value of $520K and approximately 6,694 square feet (about $78/sqft), based on its TDLR filing.

Scope of Work

Interior renovations to tenant suite with associated mechanical electrical and plumbing costs.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

7700 W Parmer Ln, Suite 350, Austin, TX, 78729

Location by street address

Related City Permits

Building permits found at or near this location

7700 W PARMER LN BLDG B UNIT 300

INTERIOR REMODEL PHASE 2 OF EXISTING OFFICE SPACE

ActiveMechanical PermitRemodelSep 2026
View Details
2026-090011 MP
Flash Mechanical
7700 W PARMER LN BLDG A UNIT 200

ePlan: Commercial Expedited Review - Interior Remodel to Existing Dining Room Areas (250000 SF).

ActiveBuilding PermitRemodelSep 2026
View Details
2026-100754 BP
Maloba Builders and Services
7700 W PARMER LN BLDG B

7 DAY - Interior remodel to existing office area - OVA

ActiveElectrical PermitRemodelAug 2026
View Details
2026-087072 EP
Ampology Electrical Services LLC
7700 W PARMER LN BLDG B

7 DAY - Interior remodel to existing office area - OVA

ActivePlumbing PermitRemodelAug 2026
View Details
2026-087072 PP
Heritage Plumbing Inc.
7700 W PARMER LN BLDG B

7 DAY - Interior remodel to existing office area - OVA

ActiveMechanical PermitRemodelAug 2026
View Details
2026-087072 MP
Friends HVAC Services LLC

Watch all construction in 78729 (Austin)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.