Orange Leaf
Orange Leaf is a renovation/alteration project at 9324 Clifford Street Suite 102, Fort Worth, in Tarrant County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $240K across about 1,279 sq ft.
๐Project Metrics
TDLR #TABS2026019889Review Complete
Design review complete, construction may proceed
Orange Leaf is a Renovation/Alteration project located at 9324 Clifford Street Suite 102, Fort Worth, TX 76108 in Fort Worth, Texas. The project has an estimated value of $240K covering 1,279 sq ft. Hickman Holt Irrevoc Asset TR is the property owner and Zebra Projects, Inc is the design firm of record. The project was registered with TDLR on May 11, 2026.
โFrequently Asked Questions
What is Orange Leaf?
Orange Leaf is a renovation/alteration project at 9324 Clifford Street Suite 102 in Fort Worth, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior alteration of an existing retail suite of 1279.94SF.
Is Orange Leaf open in Fort Worth?
Orange Leaf is currently under construction in Fort Worth, TX. Its current TDLR status is "Review Complete".
Where is Orange Leaf located?
Orange Leaf is located at 9324 Clifford Street Suite 102, Fort Worth, TX, 76108, in Tarrant County.
Who is the owner or developer of Orange Leaf?
Hickman Holt Irrevoc Asset TR is the property owner/developer of record for Orange Leaf, per its TDLR project registration.
Who is the architect or design firm for Orange Leaf?
Zebra Projects, Inc is the design firm of record for Orange Leaf, according to its TDLR filing.
How much does Orange Leaf cost and how big is it?
Orange Leaf has an estimated construction value of $240K and approximately 1,279 square feet (about $188/sqft), based on its TDLR filing.
๐Scope of Work
Interior alteration of an existing retail suite of 1279.94SF.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
May 11, 2026
Review Complete
Jun 22, 2026
Inspection Complete
Closed
42d
Review duration