Project intelligenceTDLR TABS2026020342New Construction
Funding type

This project is privately funded, on private land for private use.

Hanyang Engineering - Harris Branch

12520 Harris Branch Parkway, Austin, TX, 78754

Opening ~May 2027Review Complete

Hanyang Engineering - Harris Branch is a new construction project at 12520 Harris Branch Parkway, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion May 2027. The project has an estimated value of $14.0M across about 62,435 sq ft.

Estimated project value
$14.0M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
62,435 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$224/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
11 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

May 14, 2026377 days across supplied datesMay 26, 2027

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    53 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    31 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    293 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About Hanyang Engineering - Harris Branch

Hanyang Engineering - Harris Branch is a new 62,435 square foot manufacturing and office building under construction at 12520 Harris Branch Parkway in Austin, Texas. The project is privately funded on private land for private use, with an estimated cost of $14,000,000. This ground-up development is registered with TDLR and is in the construction phase.

Construction started in July 2026, and the project is scheduled to finish in May 2027. TDLR completed the plan review process in August 2026, confirming the status as Review Complete. The registered accessibility specialist for this filing is David S Drepaul.

Design and Scope

The design firm of record is Kingham Dalton Wilson LTD. The scope of work includes the new 62,435 square foot structure and associated site work. The estimated cost per square foot is $224. This figure is above the Travis County median of $125 per square foot for similar new construction filings. The total estimated cost is also above the county median for this type of work.

The owner of record is Hmgm LLC. This location detail provides context for the site’s environmental profile relative to flood risk standards.

Local Context and Permits

City of Austin permit records show seven permits on file at this street address, issued between July 2026 and August 2026. These include three plumbing permits, two building permits, one mechanical permit, and one electrical permit. The declared valuations on these permits total $24,600,000. The most recent permit entry describes a 62,435 square foot ground-up new light manufacturer project that will be structural.

The surrounding area, ZIP code 78754, has a population of about 31,410 according to U.S. Census ACS 2023 five-year estimates. The median household income in this area is $92,964. Kingham Dalton Wilson LTD. has three other TDLR-registered projects totaling $6,000,000, including locations in Nacogdoches, Houston, and La Porte.

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 78754 (Austin)

One email per change. Unsubscribe in one click. Privacy.

Hanyang Engineering - Harris Branch is a New Construction project located at 12520 Harris Branch Parkway, Austin, TX 78754 in Austin, Texas. The project has an estimated value of $14.0M covering 62,435 sq ft. HMGM LLC is the property owner and KINGHAM DALTON WILSON LTD. is the design firm of record. The project was registered with TDLR on May 14, 2026.

Frequently Asked Questions

What is the estimated cost of the project?

The estimated cost for the Hanyang Engineering - Harris Branch project is $14,000,000. This figure is above the Travis County median for similar new construction filings.

Who is the design firm for this building?

The design firm of record is Kingham Dalton Wilson LTD. They are also listed as the design firm for three other TDLR-registered projects in Texas.

When is the construction expected to be completed?

Construction started in July 2026 and is scheduled to finish in May 2027. TDLR completed the plan review in August 2026.

Is the site in a flood zone?

This area is designated as zone X according to the FEMA National Flood Hazard Layer.

Who owns the property?

The owner of record for the project is Hmgm LLC. The project is privately funded and located on private land for private use.

What is Hanyang Engineering - Harris Branch?

Hanyang Engineering - Harris Branch is a new construction project at 12520 Harris Branch Parkway in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: New 62,435 SF manufacturing / office building and associated site work.

Is Hanyang Engineering - Harris Branch open in Austin?

Hanyang Engineering - Harris Branch is still under construction in Austin, TX, with an estimated completion of May 2027 according to its TDLR registration.

Where is Hanyang Engineering - Harris Branch located?

Hanyang Engineering - Harris Branch is located at 12520 Harris Branch Parkway, Austin, TX, 78754, in Travis County.

Who is the owner or developer of Hanyang Engineering - Harris Branch?

HMGM LLC is the property owner/developer of record for Hanyang Engineering - Harris Branch, per its TDLR project registration.

Who is the architect or design firm for Hanyang Engineering - Harris Branch?

KINGHAM DALTON WILSON LTD. is the design firm of record for Hanyang Engineering - Harris Branch, according to its TDLR filing.

How much does Hanyang Engineering - Harris Branch cost and how big is it?

Hanyang Engineering - Harris Branch has an estimated construction value of $14.0M and approximately 62,435 square feet (about $224/sqft), based on its TDLR filing.

Scope of Work

New 62,435 SF manufacturing / office building and associated site work.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

12520 Harris Branch Parkway, Austin, TX, 78754

Location by street address

Related City Permits

Building permits found at or near this location

12520 SAINT THOMAS DR

Lexington / Irrigation for new landscape

ActivePlumbing PermitIrrigationSep 2026
View Details
2026-113667 PP
12520 HARRIS BRANCH PKWY

62435 SF ground up new light manufacturer. Project will be structural steel tilt wall construction with associated site work and interior finish out.

ActivePlumbing PermitNewAug 2026
View Details
2026-104278 PP
Beyer Plumbing Company
12520 HARRIS BRANCH PKWY

62435 SF ground up new light manufacturer. Project will be structural steel tilt wall construction with associated site work and interior finish out.

ActiveElectrical PermitNewAug 2026
View Details
2026-104278 EP
Enterprise Electrical
12520 HARRIS BRANCH PKWY

62435 SF ground up new light manufacturer. Project will be structural steel tilt wall construction with associated site work and interior finish out.

ActiveMechanical PermitNewAug 2026
View Details
2026-104278 MP
Team Mechanical of Texas, LLC
12520 HARRIS BRANCH PKWY

62435 SF ground up new light manufacturer. Project will be structural steel tilt wall construction with associated site work and interior finish out.

ActiveBuilding PermitNewAug 2026
$12.3M
View Details
2026-104278 BP
Kingham Dalton Wilson

Watch all construction in 78754 (Austin)