Funding type
This project is privately funded, on private land for private use.
NEW CARWASH FACILITY FOR FUEL CITY
490 S. John King Blvd., Rockwall, TX, 75087
NEW CARWASH FACILITY FOR FUEL CITY is a new construction project at 490 S. John King Blvd., Rockwall, in Rockwall County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Feb 2027. The project has an estimated value of $1.5M across about 4,403 sq ft.
- Estimated project value
- $1.5M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 4,403 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $341/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 8 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
31 days after the preceding date shown.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
6 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
224 days after the preceding date shown.
Source: TDLR filing
View source record
📰About NEW CARWASH FACILITY FOR FUEL CITY
The NEW Carwash Facility for Fuel City is a 4,403 sq ft new construction project located at 490 S. John King Blvd. in Rockwall, Texas. Owned by Fuel City Rockwall LLC, the facility is valued at $1,500,000 and includes interior and exterior construction along with related sitework.
Carroll Architects serves as the design firm of record, with Oswaldo Cajas listed as the registered accessibility specialist. The project timeline shows work starting in June 2026 and scheduled to finish in February 2027. This 230-day build window is close to the Rockwall County median of 240 days for similar new construction filings.
Financial and Size Context
The estimated cost of $1,500,000 is above the Rockwall County median of $945,000 for new construction. While the facility is smaller than the county median size of 8,501 sq ft, its cost per square foot is $341, which is above the county median of $135. These figures reflect the specialized infrastructure required for a carwash compared to general commercial spaces.
Fuel City Rockwall LLC is privately funding this project on private land for private use. The registration with the Texas Department of Licensing and Regulation (TDLR) was completed in May 2026, and plan review was finished in June 2026. The current TDLR status is Review Complete, confirming that the design phase has passed regulatory inspection.
This project is one of several recent developments in the area. The owner has another TDLR-registered project, a convenience store facility, totaling $6,250,000. Carroll Architects has also been involved in six other projects in the region, including a $14,800,000 office facility in Plano, indicating a strong presence in local commercial construction.
Review Complete
Design review complete, construction may proceed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 75087 (Rockwall)
One email per change. Unsubscribe in one click. Privacy.
NEW CARWASH FACILITY FOR FUEL CITY is a New Construction project located at 490 S. John King Blvd., Rockwall, TX 75087 in Rockwall, Texas. The project has an estimated value of $1.5M covering 4,403 sq ft. FUEL CITY ROCKWALL LLC is the property owner and Carroll Architects is the design firm of record. The project was registered with TDLR on May 16, 2026.
Frequently Asked Questions
When is the carwash scheduled to finish construction?
Construction is scheduled to finish in February 2027. Work began in June 2026, creating a build window of approximately 230 days from start to completion.
Who is the owner of the new carwash facility?
The owner of record is Fuel City Rockwall LLC. This entity is also responsible for a separate convenience store facility registered in Rockwall.
What is the estimated cost of the project?
The estimated cost is $1,500,000. This is above the Rockwall County median for new construction, which is $945,000.
Is the carwash open for business?
The TDLR record indicates the project is under construction and scheduled to finish in February 2027. There is no information in the provided facts confirming that it is open.
Who designed the carwash facility?
Carroll Architects is the design firm of record. They have completed six other TDLR-registered projects in the region, including a large office facility in Plano.
What is NEW CARWASH FACILITY FOR FUEL CITY?
NEW CARWASH FACILITY FOR FUEL CITY is a new construction project at 490 S. John King Blvd. in Rockwall, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Carwash interior and exterior construction and related sitework.
Is NEW CARWASH FACILITY FOR FUEL CITY open in Rockwall?
NEW CARWASH FACILITY FOR FUEL CITY is still under construction in Rockwall, TX, with an estimated completion of Feb 2027 according to its TDLR registration.
Where is NEW CARWASH FACILITY FOR FUEL CITY located?
NEW CARWASH FACILITY FOR FUEL CITY is located at 490 S. John King Blvd., Rockwall, TX, 75087, in Rockwall County.
Who is the owner or developer of NEW CARWASH FACILITY FOR FUEL CITY?
FUEL CITY ROCKWALL LLC is the property owner/developer of record for NEW CARWASH FACILITY FOR FUEL CITY, per its TDLR project registration.
Who is the architect or design firm for NEW CARWASH FACILITY FOR FUEL CITY?
Carroll Architects is the design firm of record for NEW CARWASH FACILITY FOR FUEL CITY, according to its TDLR filing.
How much does NEW CARWASH FACILITY FOR FUEL CITY cost and how big is it?
NEW CARWASH FACILITY FOR FUEL CITY has an estimated construction value of $1.5M and approximately 4,403 square feet (about $341/sqft), based on its TDLR filing.
Scope of Work
Carwash interior and exterior construction and related sitework.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
490 S. John King Blvd., Rockwall, TX, 75087
Related Projects
Watch all construction in 75087 (Rockwall)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Rockwall?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.