New Drive Thru Coffee Stand is a new construction project at 8701 Eldorado Parkway, Mckinney, in Collin County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Nov 2026. The project has an estimated value of $1.5M across about 1,728 sq ft.

Estimated project value
$1.5M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
1,728 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$868/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
3 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

May 18, 2026181 days across supplied datesNov 15, 2026

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    35 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    54 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    92 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About New Drive Thru Coffee Stand

New Drive Thru Coffee Stand is a new construction project located at 8701 Eldorado Parkway in McKinney. The filing identifies the facility as 7 Brew Drive Thru Coffee. The structure covers 1,728 sq ft and is scheduled to finish in November 2026, with work starting in August 2026.

The scope includes a drive-thru coffee stand featuring a walk-in cooler, dry storage, and awnings. Abji, LLC is the owner of record, and GBC Design Inc is the design firm. The estimated cost is $1,500,000, resulting in a computed cost of $868 per square foot. Michael Lynn Kelley is the registered accessibility specialist. The project is privately funded on private land.

Project Timeline and Status

TDLR completed plan review in June 2026. The current status is Review Complete. The scheduled build window is 92 days, which is shorter than the 212-day median for new construction projects in Collin County.

GBC Design Inc has three other TDLR-registered 7 Brew Drive Thru Coffee projects in Hurst, Midlothian, and Little Elm, each with an estimated cost of $1,500,000. Abji, LLC also has two other registered projects in McKinney, including a KFC location with an estimated cost of $1,800,000. The cost of this project is above the county median of $800,000 for new construction filings.

The ZIP code 75070 has a population of about 59,859 and a median household income of $106,549, according to U.S. Census ACS 2023 five-year estimates. The area has 24,323 housing units and a median owner-occupied home value of $429,300. A Facebook post by ComingSoonTexas noted the arrival of 7 Brew drive-thru coffee stands in the region, highlighting the brand's expansion in Texas.

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 75070 (Mckinney)

One email per change. Unsubscribe in one click. Privacy.

New Drive Thru Coffee Stand is a New Construction project located at 8701 Eldorado Parkway, Mckinney, TX 75070 in Mckinney, Texas. The project has an estimated value of $1.5M covering 1,728 sq ft. Abji, LLC is the property owner and GBC Design Inc is the design firm of record. The project was registered with TDLR on May 18, 2026.

Frequently Asked Questions

Is the New Drive Thru Coffee Stand open?

The TDLR record indicates construction is scheduled to finish in November 2026. The status is Review Complete, but no information confirms the business is operating or open to the public.

Who is building the New Drive Thru Coffee Stand?

Abji, LLC is the owner of record. GBC Design Inc is the design firm. Michael Lynn Kelley is the registered accessibility specialist. The project is privately funded on private land.

How much does the New Drive Thru Coffee Stand cost?

The estimated cost is $1,500,000. The total square footage is 1,728 sq ft, which computes to $868 per square foot. This is above the Collin County median cost of $800,000 for similar filings.

What features are included in the New Drive Thru Coffee Stand?

The scope includes a drive-thru coffee stand with a walk-in cooler, dry storage, and awnings. The total area is 1,728 sq ft. The project is located in zone X, outside the FEMA floodplain.

When did plan review end for the New Drive Thru Coffee Stand?

TDLR completed plan review in June 2026. Construction is scheduled to start in August 2026 and finish in November 2026. The project was registered with TDLR in May 2026.

What is New Drive Thru Coffee Stand?

New Drive Thru Coffee Stand is a new construction project at 8701 Eldorado Parkway in Mckinney, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Drive thru coffee stand w/ walk in cooler, dry storage and awnings cover 1728 sf

Is New Drive Thru Coffee Stand open in Mckinney?

New Drive Thru Coffee Stand is still under construction in Mckinney, TX, with an estimated completion of Nov 2026 according to its TDLR registration.

Where is New Drive Thru Coffee Stand located?

New Drive Thru Coffee Stand is located at 8701 Eldorado Parkway, Mckinney, TX, 75070, in Collin County.

Who is the owner or developer of New Drive Thru Coffee Stand?

Abji, LLC is the property owner/developer of record for New Drive Thru Coffee Stand, per its TDLR project registration.

Who is the architect or design firm for New Drive Thru Coffee Stand?

GBC Design Inc is the design firm of record for New Drive Thru Coffee Stand, according to its TDLR filing.

How much does New Drive Thru Coffee Stand cost and how big is it?

New Drive Thru Coffee Stand has an estimated construction value of $1.5M and approximately 1,728 square feet (about $868/sqft), based on its TDLR filing.

Scope of Work

Drive thru coffee stand w/ walk in cooler, dry storage and awnings cover 1728 sf

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

8701 Eldorado Parkway, Mckinney, TX, 75070

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 75070 (Mckinney)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Mckinney?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.