Funding type
This project involves public funds, public land, or is a Federally funded roadway project.
Kress ISD Addition and Renovation
200 E 5th Street, Kress, TX, 79052
Kress ISD Addition and Renovation is a additions to existing building project at 200 E 5th Street, Kress, in Swisher County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Jul 2027. The project has an estimated value of $3.6M across about 5,116 sq ft.
- Estimated project value
- $3.6M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 5,116 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $702/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 1 year
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
34 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
9 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
365 days after the preceding date shown.
Source: TDLR filing
View source record
📰About Kress ISD Addition and Renovation
Kress ISD High School is the site of a major construction project at 200 E 5th Street in Kress, Texas. The work involves two new additions and a renovation of the existing auditorium. The total new construction area is 5,116 sq ft, with an estimated cost of $3,590,570. This project is filed with the Texas Department of Licensing and Regulation as the Kress ISD Addition and Renovation.
The scope includes a 1,766 sq ft addition for a lobby and bathrooms and a 3,350 sq ft storm shelter and multipurpose room. The district is also renovating the 5,251 sq ft auditorium. Landy Perkins is the registered accessibility specialist for this project in Swisher County. The work is classified as additions to an existing building.
Timeline and Funding
Construction is scheduled to begin in July 2026 and is scheduled to finish in July 2027. TDLR completed plan review in June 2026, and the current status is Review Complete. The project involves public funds and public land. The estimated cost per square foot for the new construction is $702.
Kress is a small community in Swisher County with a population of approximately 1,064 according to U.S. Census estimates for the 79052 ZIP code. The median household income is $60,294, and the median owner-occupied home value is $98,200. The local unemployment rate was 4.4 percent in July 2026. The high school serves as a central hub for the community, with the auditorium previously hosting public meetings such as the Kress ISD Bond Election Meeting.
The project aims to enhance the school's capacity for safety and multipurpose use. The new storm shelter provides a designated safe space during severe weather events, while the multipurpose room offers flexible space for various school activities. The lobby and bathroom addition improves daily operations and accessibility for students and staff. The renovation of the auditorium ensures that the existing facility remains modern and functional for future generations of Kress students.
Review Complete
Design review complete, construction may proceed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 79052 (Kress)
One email per change. Unsubscribe in one click. Privacy.
Kress ISD Addition and Renovation is a Additions to Existing Building project located at 200 E 5th Street, Kress, TX 79052 in Kress, Texas. The project has an estimated value of $3.6M covering 5,116 sq ft. Kress Independent School District is the property owner. The project was registered with TDLR on May 19, 2026.
Frequently Asked Questions
When is construction scheduled to finish?
Construction is scheduled to finish in July 2027, following a start date of July 2026. TDLR completed the plan review in June 2026.
What is the total estimated cost of the project?
The estimated cost for the Kress ISD Addition and Renovation is $3,590,570. This covers the two new additions and the auditorium renovation.
Who is the owner of the project?
The owner of record is Kress Independent School District. The project is located at 200 E 5th Street in Kress, Texas.
What specific structures are being added?
The project includes a 1,766 sq ft lobby and bathroom addition and a 3,350 sq ft storm shelter and multipurpose room. The existing 5,251 sq ft auditorium is also being renovated.
Is the school currently open?
The TDLR record tracks construction status, not daily school operations. Construction is scheduled to finish in July 2027. The facility remains the Kress ISD High School at 200 E 5th Street.
What is Kress ISD Addition and Renovation?
Kress ISD Addition and Renovation is a additions to existing building project at 200 E 5th Street in Kress, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Two small additions, 1766 SF lobby and bathrooms and 3350 SF storm shelter and multipurpose room. Renovation of 5251 SF Auditorium.
Is Kress ISD Addition and Renovation open in Kress?
Kress ISD Addition and Renovation is still under construction in Kress, TX, with an estimated completion of Jul 2027 according to its TDLR registration.
Where is Kress ISD Addition and Renovation located?
Kress ISD Addition and Renovation is located at 200 E 5th Street, Kress, TX, 79052, in Swisher County.
Who is the owner or developer of Kress ISD Addition and Renovation?
Kress Independent School District is the property owner/developer of record for Kress ISD Addition and Renovation, per its TDLR project registration.
How much does Kress ISD Addition and Renovation cost and how big is it?
Kress ISD Addition and Renovation has an estimated construction value of $3.6M and approximately 5,116 square feet (about $702/sqft), based on its TDLR filing.
Scope of Work
Two small additions, 1766 SF lobby and bathrooms and 3350 SF storm shelter and multipurpose room. Renovation of 5251 SF Auditorium.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
200 E 5th Street, Kress, TX, 79052
Watch all construction in 79052 (Kress)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Kress?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.