Funding type
This project is privately funded, on private land for private use.
Take 5 Oil Change TK5-11069
3806 N Loy Lake Road, Sherman, TX, 75090
Take 5 Oil Change TK5-11069 is a new construction project at 3806 N Loy Lake Road, Sherman, in Grayson County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Dec 2027. The project has an estimated value of $980K across about 1,350 sq ft.
- Estimated project value
- $980K
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 1,350 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $726/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 1y 4mo
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
37 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
58 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
478 days after the preceding date shown.
Source: TDLR filing
View source record
📰About Take 5 Oil Change TK5-11069
A new 1,350-square-foot oil change facility is under development at 3806 N Loy Lake Road in Sherman, Texas. The project, filed with the Texas Department of Licensing and Regulation under the name Take 5 Oil Change TK5-11069 - SHERMAN TEXAS, involves the ground-up construction of a one-story building with two service bays and associated site improvements. The estimated cost for this new construction is $980,000.
The property is owned by LOT 8R Kobalt TRC LLC, with WT Group AEC serving as the design firm of record. Michael Lynn Kelley is the registered accessibility specialist for the project. The work is privately funded on private land for private use, situated in Grayson County.
TDLR completed the plan review in June 2026, and the status is listed as Review Complete. Construction is scheduled to start in August 2026 and is scheduled to finish in December 2027. This timeline represents a build window of 478 days, which is longer than the county median of 242 days for similar new construction filings in Grayson County.
Project Context and Comparisons
The estimated cost of $980,000 is close to the median estimated cost of $900,000 for new construction projects in Grayson County. However, the cost per square foot for this oil change facility is $726, which is above the county median of $135 per square foot. The total square footage of 1,350 sq ft is significantly smaller than the county median of 8,000 sq ft for new construction filings.
WT Group AEC has been involved in six other TDLR-registered projects totaling $1,824,280, including locations for Oxxo and Tesla Collision Center. The Sherman project adds to the firm's portfolio of commercial construction work. For context, the U.S. Census Bureau estimates the population of the 75090 ZIP code at about 26,273, with a median household income of $58,586. The area features mostly owner-occupied housing, with a median home value of $163,500.
The Grayson County unemployment rate was 4.6 percent in July 2026, higher than a year earlier. This new construction project represents a specific investment in local commercial infrastructure, distinct from the broader housing and labor market trends in the region.
Review Complete
Design review complete, construction may proceed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 75090 (Sherman)
One email per change. Unsubscribe in one click. Privacy.
Take 5 Oil Change TK5-11069 is a New Construction project located at 3806 N Loy Lake Road, Sherman, TX 75090 in Sherman, Texas. The project has an estimated value of $980K covering 1,350 sq ft. LOT 8R KOBALT TRC LLC is the property owner and WT Group AEC is the design firm of record. The project was registered with TDLR on May 21, 2026.
Frequently Asked Questions
When will the Take 5 Oil Change in Sherman be completed?
Construction is scheduled to start in August 2026 and is scheduled to finish in December 2027, according to the TDLR filing.
Who is the owner of the new oil change facility?
The owner of record is LOT 8R Kobalt TRC LLC, with WT Group AEC acting as the design firm.
Is the Take 5 Oil Change open for business?
The TDLR record indicates construction is scheduled to finish in December 2027. There is no information in the filing confirming the business is open.
What is Take 5 Oil Change TK5-11069?
Take 5 Oil Change TK5-11069 is a new construction project at 3806 N Loy Lake Road in Sherman, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: 1350 SF. New Ground up, one story oil change with 2 service bays as well as site improvements.
Is Take 5 Oil Change TK5-11069 open in Sherman?
Take 5 Oil Change TK5-11069 is still under construction in Sherman, TX, with an estimated completion of Dec 2027 according to its TDLR registration.
Where is Take 5 Oil Change TK5-11069 located?
Take 5 Oil Change TK5-11069 is located at 3806 N Loy Lake Road, Sherman, TX, 75090, in Grayson County.
Who is the owner or developer of Take 5 Oil Change TK5-11069?
LOT 8R KOBALT TRC LLC is the property owner/developer of record for Take 5 Oil Change TK5-11069, per its TDLR project registration.
Who is the architect or design firm for Take 5 Oil Change TK5-11069?
WT Group AEC is the design firm of record for Take 5 Oil Change TK5-11069, according to its TDLR filing.
How much does Take 5 Oil Change TK5-11069 cost and how big is it?
Take 5 Oil Change TK5-11069 has an estimated construction value of $980K and approximately 1,350 square feet (about $726/sqft), based on its TDLR filing.
Scope of Work
1350 SF. New Ground up, one story oil change with 2 service bays as well as site improvements.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
3806 N Loy Lake Road, Sherman, TX, 75090
Related Projects
Watch all construction in 75090 (Sherman)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Sherman?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.