Traffic Signal Improvements (CSJ: 0865-01-118) in Alamo, TX

Various Locations, Alamo, TX, 78516

Opening ~Apr 2027Review Complete

Traffic Signal Improvements (CSJ: 0865-01-118) is a new construction project at Various Locations, Alamo, in Hidalgo County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Apr 2027. The project has an estimated value of $222K across about 11,745 sq ft.

Estimated project value
$222K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
11,745 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$19/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
5 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

May 22, 2026314 days across supplied datesApr 1, 2027

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    31 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    142 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    141 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About Traffic Signal Improvements (CSJ: 0865-01-118)

TxDOT District: Pharr is executing a new construction project in Alamo, Texas, focused on critical traffic infrastructure improvements. The filing, identified as CSJ: 0865-01-118, covers various locations within the city of Alamo, Hidalgo County. The total estimated cost for this work is $221,733, spanning a project area of 11,745 square feet.

The scope of work is specific and functional: updating existing traffic signals, installing new sidewalks, adding crosswalks, and constructing ADA-compliant curb ramps along with necessary pavement markings. This project involves public funds and public land, or is a Federally funded roadway project, ensuring it meets state and federal accessibility standards.

Timeline and Status

The project registered with TDLR in May 2026, and plan review was completed in June 2026. Construction is scheduled to start in November 2026 and is scheduled to finish in April 2027. The TDLR status is Review Complete, indicating that the necessary regulatory approvals for the design phase have been granted.

Frank Fonseca is the registered accessibility specialist associated with this filing. The estimated cost per square foot is $19, which is below the Hidalgo County median of $100 per square foot for similar new construction filings. The scheduled build window of 141 days is shorter than the county median of 212 days, reflecting a focused and efficient construction timeline for this specific scope of work.

TxDOT District: Pharr has six other TDLR-registered projects in the region, totaling over $46 million. These include significant infrastructure works in Brownsville, Harlingen, Weslaco, McAllen, and Raymondville. This Alamo project fits within that broader portfolio of roadway and accessibility improvements across Hidalgo County.

Alamo, with a population of approximately 34,960, relies on these local infrastructure updates to support daily mobility. The median household income in the area is $51,547, and housing is predominantly owner-occupied. Improving traffic signals and pedestrian safety through ADA curb ramps directly supports the community’s need for accessible and efficient local transit.

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 78516 (Alamo)

One email per change. Unsubscribe in one click. Privacy.

Traffic Signal Improvements (CSJ: 0865-01-118) is a New Construction project located at Various Locations, Alamo, TX 78516 in Alamo, Texas. The project has an estimated value of $222K covering 11,745 sq ft. TxDOT District: Pharr is the property owner. The project was registered with TDLR on May 22, 2026.

Frequently Asked Questions

When will construction start and end?

Construction is scheduled to start in November 2026 and is scheduled to finish in April 2027, following the completion of plan review in June 2026.

What is the total estimated cost of the project?

The estimated cost for the traffic signal improvements and accessibility upgrades in Alamo is $221,733.

Who is the owner of record?

The owner of record is TxDOT District: Pharr, which is responsible for the project’s execution and compliance with TDLR requirements.

What specific work is included in the scope?

The scope includes updating traffic signals, installing sidewalks, crosswalks, ADA curb ramps, and pavement markings at various locations in Alamo.

Is the project funded by public money?

Yes, the project involves public funds, public land, or is a Federally funded roadway project, as stated in the filing.

What is Traffic Signal Improvements (CSJ: 0865-01-118)?

Traffic Signal Improvements (CSJ: 0865-01-118) is a new construction project at Various Locations in Alamo, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Update traffic signals, install sidewalk, crosswalks, ADA curb ramps and pavement markings.

Is Traffic Signal Improvements (CSJ: 0865-01-118) open in Alamo?

Traffic Signal Improvements (CSJ: 0865-01-118) is still under construction in Alamo, TX, with an estimated completion of Apr 2027 according to its TDLR registration.

Where is Traffic Signal Improvements (CSJ: 0865-01-118) located?

Traffic Signal Improvements (CSJ: 0865-01-118) is located at Various Locations, Alamo, TX, 78516, in Hidalgo County.

Who is the owner or developer of Traffic Signal Improvements (CSJ: 0865-01-118)?

TxDOT District: Pharr is the property owner/developer of record for Traffic Signal Improvements (CSJ: 0865-01-118), per its TDLR project registration.

How much does Traffic Signal Improvements (CSJ: 0865-01-118) cost and how big is it?

Traffic Signal Improvements (CSJ: 0865-01-118) has an estimated construction value of $222K and approximately 11,745 square feet (about $19/sqft), based on its TDLR filing.

Scope of Work

Update traffic signals, install sidewalk, crosswalks, ADA curb ramps and pavement markings.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

Various Locations, Alamo, TX, 78516

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 78516 (Alamo)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.