Project intelligenceTDLR TABS2026021082New Construction
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Carver High School Rebuild

2100 South Victory Drive, Houston, TX, 77088

Opening ~Jul 2028Review Complete

Carver High School Rebuild is a new construction project at 2100 South Victory Drive, Houston, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Jul 2028. The project has an estimated value of $116.0M across about 251,441 sq ft.

Estimated project value
$116.0M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
251,441 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$461/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1y 10mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

Explore the linked construction record and source history

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

May 22, 2026798 days across supplied datesJul 28, 2028

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    77 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    52 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    669 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About Carver High School Rebuild

Aldine Independent School District is rebuilding G.W. Carver High School at 2100 South Victory Drive in Houston, Texas. The project, filed with the Texas Department of Licensing and Regulation as the Carver High School Rebuild, involves new construction for a facility designed to serve 900 students. The total estimated cost for this development is $116,000,000, covering 251,441 square feet of space.

The new campus will feature a three-story main building that includes larger program areas such as a dining hall, auditorium, and gymnasium. A separate single-story storage building will also be constructed on the site.

Construction Timeline and Status

TDLR completed plan review in August 2026 and construction is scheduled to finish in July 2028, with work starting September 2026. The registration was filed in May 2026, and the status is Review Complete. This timeline represents a scheduled build window of 669 days, which is longer than the Harris County median of 219 days for new construction projects.

The project cost of $116,000,000 places it in the top quarter of estimated costs for new construction filings in Harris County, where the median is $750,000. The calculated cost per square foot is $461, which is above the county median of $88. This significant investment reflects the scale of the new high school rebuild compared to typical regional projects.

City of Houston permit records show six demolition permits issued at this street address between February 2026 and March 2026. These permits, described as DEMO BLDG/SEWER DISC, indicate the preliminary phase of clearing the site for the new construction. The project involves public funds and public land, aligning with the district's commitment to modernizing its educational infrastructure.

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 77088 (Houston)

One email per change. Unsubscribe in one click. Privacy.

Carver High School Rebuild is a New Construction project located at 2100 South Victory Drive, Houston, TX 77088 in Houston, Texas. The project has an estimated value of $116.0M covering 251,441 sq ft. Aldine Independent School District is the property owner and Stantec Architects Inc is the design firm of record. The project was registered with TDLR on May 22, 2026.

Frequently Asked Questions

When is the Carver High School rebuild scheduled to finish?

Construction is scheduled to finish in July 2028. Work is set to start in September 2026, following the completion of plan review in August 2026.

Who is building the new G.W. Carver High School?

Aldine Independent School District is the owner of record. Stantec Architects Inc is the design firm of record for the new construction project.

How large is the new high school building?

The project covers 251,441 square feet. The main building is three stories high and includes a dining hall, auditorium, and gymnasium.

What is the estimated cost of the project?

The estimated cost is $116,000,000. This figure is above the Harris County median for new construction and reflects the scale of the rebuild.

Is the new school open for students?

The project is under construction. TDLR records indicate construction is scheduled to finish in July 2028, so the facility is not yet operational.

What is Carver High School Rebuild?

Carver High School Rebuild is a new construction project at 2100 South Victory Drive in Houston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: New HS Rebuild for 900 students. Main building is 3 story and a small storage building single story. Main building has dining, auditorium, gym and dining as larger program areas.

Is Carver High School Rebuild open in Houston?

Carver High School Rebuild is still under construction in Houston, TX, with an estimated completion of Jul 2028 according to its TDLR registration.

Where is Carver High School Rebuild located?

Carver High School Rebuild is located at 2100 South Victory Drive, Houston, TX, 77088, in Harris County.

Who is the owner or developer of Carver High School Rebuild?

Aldine Independent School District is the property owner/developer of record for Carver High School Rebuild, per its TDLR project registration.

Who is the architect or design firm for Carver High School Rebuild?

Stantec Architects Inc is the design firm of record for Carver High School Rebuild, according to its TDLR filing.

How much does Carver High School Rebuild cost and how big is it?

Carver High School Rebuild has an estimated construction value of $116.0M and approximately 251,441 square feet (about $461/sqft), based on its TDLR filing.

Scope of Work

New HS Rebuild for 900 students. Main building is 3 story and a small storage building single story. Main building has dining, auditorium, gym and dining as larger program areas.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

2100 South Victory Drive, Houston, TX, 77088

Location by street address

Related City Permits

Building permits found at or near this location

2100 S VICTORY DR, Houston, TX 77088

DEMO BLDG/SEWER DISC

IssuedDemolitionMar 2026
HOU-26003092-DEMOLITION
2100 S VICTORY DR BLD E, Houston, TX 77088

DEMO BLDG/SEWER DISC

IssuedDemolitionFeb 2026
HOU-26001996-DEMOLITION
2100 S VICTORY DR BLD D, Houston, TX 77088

DEMO BLDG/SEWER DISC

IssuedDemolitionFeb 2026
HOU-26001997-DEMOLITION
2100 S VICTORY DR BLD C, Houston, TX 77088

DEMO BLDG/SEWER DISC

IssuedDemolitionFeb 2026
HOU-26002184-DEMOLITION
2100 S VICTORY DR BLD B, Houston, TX 77088

DEMO BLDG/SEWER DISC

IssuedDemolitionFeb 2026
HOU-26003025-DEMOLITION

Watch all construction in 77088 (Houston)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.