I Road Hike and Bike Phase I in Pharr, TX
Limits from Regional Linear Park to Rancho Blanco, Pharr, TX, 78577
I Road Hike and Bike Phase I is a new construction project at Limits from Regional Linear Park to Rancho Blanco, Pharr, in Hidalgo County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Feb 2028. The project has an estimated value of $2.2M across about 59,000 sq ft.
- Estimated project value
- $2.2M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 59,000 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $37/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 1y 1mo
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
66 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
179 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
393 days after the preceding date shown.
Source: TDLR filing
View source record
📰About I Road Hike and Bike Phase I
I Road Hike and Bike Phase I is a new 10-foot-wide shared-use path connecting Regional Linear Park to Rancho Blanco road in Pharr, Texas. The project covers 59,000 square feet and is scheduled to finish in February 2028, with construction starting in February 2027. The City of Pharr is the owner of record, and the estimated cost is $2,162,752.
GDJ Engineering is the design firm of record for I Road Hike and Bike Phase I. Jose Ricardo Guerrero serves as the registered accessibility specialist. The filing indicates the project involves public funds, public land, or Federally funded roadway components. TDLR completed plan review in August 2026, and the status is Review Complete.
Location and Scope
The path runs from the limits of Regional Linear Park to Rancho Blanco in Hidalgo County. The address is listed as Limits from Regional Linear Park to Rancho Blanco, Pharr, TX 78577. The scope specifically includes the construction of this shared-use path to provide a dedicated route for hikers and cyclists.
The estimated cost of $2,162,752 is above the county median for new construction in Hidalgo County, which is $660,256. The project’s cost per square foot is $37, which is below the county median of $100. The scheduled build window of 393 days is longer than the county median of 212 days.
Owner and Design Firm Context
The City of Pharr has six other TDLR-registered projects totaling $32,286,083. GDJ Engineering has three other registered projects totaling $5,125,701, including Stenger St. in San Benito and Jackson Hike and Bike in McAllen. These projects reflect ongoing infrastructure development in the region.
U.S. Census ACS 2023 five-year estimates for ZIP 78577 show a population of about 79,903 and a median household income of $49,768. The median owner-occupied home value is $111,500. Hidalgo County’s unemployment rate was 6.8 percent in July 2026, higher than a year earlier.
Review Complete
Design review complete, construction may proceed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 78577 (Pharr)
One email per change. Unsubscribe in one click. Privacy.
I Road Hike and Bike Phase I is a New Construction project located at Limits from Regional Linear Park to Rancho Blanco, Pharr, TX 78577 in Pharr, Texas. The project has an estimated value of $2.2M covering 59,000 sq ft. City of Pharr is the property owner and GDJ Engineering is the design firm of record. The project was registered with TDLR on June 1, 2026.
Frequently Asked Questions
When is construction scheduled to finish?
Construction is scheduled to finish in February 2028, with work starting in February 2027.
What is the estimated cost of the project?
The estimated cost is $2,162,752 for the 59,000 square foot shared-use path.
Who is the design firm for this project?
GDJ Engineering is the design firm of record for I Road Hike and Bike Phase I.
Is the path open to the public yet?
The project is under construction and not yet open. It is scheduled to finish in February 2028.
Where exactly is the path located?
The path runs from Regional Linear Park to Rancho Blanco road in Pharr, TX 78577.
What is I Road Hike and Bike Phase I?
I Road Hike and Bike Phase I is a new construction project at Limits from Regional Linear Park to Rancho Blanco in Pharr, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Construction of a 10-foot-wide shared-use path from Regional Linear Park to Rancho Blanco road
Is I Road Hike and Bike Phase I open in Pharr?
I Road Hike and Bike Phase I is still under construction in Pharr, TX, with an estimated completion of Feb 2028 according to its TDLR registration.
Where is I Road Hike and Bike Phase I located?
I Road Hike and Bike Phase I is located at Limits from Regional Linear Park to Rancho Blanco, Pharr, TX, 78577, in Hidalgo County.
Who is the owner or developer of I Road Hike and Bike Phase I?
City of Pharr is the property owner/developer of record for I Road Hike and Bike Phase I, per its TDLR project registration.
Who is the architect or design firm for I Road Hike and Bike Phase I?
GDJ Engineering is the design firm of record for I Road Hike and Bike Phase I, according to its TDLR filing.
How much does I Road Hike and Bike Phase I cost and how big is it?
I Road Hike and Bike Phase I has an estimated construction value of $2.2M and approximately 59,000 square feet (about $37/sqft), based on its TDLR filing.
Scope of Work
Construction of a 10-foot-wide shared-use path from Regional Linear Park to Rancho Blanco road
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
Limits from Regional Linear Park to Rancho Blanco, Pharr, TX, 78577
Explore the supplied address
A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.
Related Projects
Same Owner
$29.1M totalWatch all construction in 78577 (Pharr)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Pharr?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.