Project intelligenceTDLR TABS2026021696Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

WEST CREEK LANE RECONSTRUCTION

5009W EST CREEK LN TO 3310 SACHSE RD, Sachse, TX, 75048

Opening ~Feb 2027Review Complete

WEST CREEK LANE RECONSTRUCTION is a renovation/alteration project at 5009W EST CREEK LN TO 3310 SACHSE RD, Sachse, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Feb 2027. The project has an estimated value of $1.4M across about 8,450 sq ft.

Estimated project value
$1.4M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
8,450 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$166/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
8 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

Explore the linked construction record and source history

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Jun 1, 2026245 days across supplied datesFeb 1, 2027

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    10 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    11 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    224 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About WEST CREEK LANE RECONSTRUCTION

The West Creek Lane Reconstruction project in Sachse involves the renovation and alteration of approximately 8,450 square feet of roadway, sidewalk, and buffer areas. Located along West Creek Lane between Est Creek Lane and Sachse Road in Dallas County, this municipal effort is estimated to cost $1,400,000. The City of Sachse serves as the owner of record, with Dccm Infrastructure listed as the design firm. This project involves public funds and is a Federally funded roadway project.

TDLR completed plan review in June 2026 and construction is scheduled to finish in February 2027, with work starting June 2026. The registered accessibility specialist for this filing is Brandon Mark Quimbey. This status ensures the project meets specific accessibility standards for public infrastructure in Texas.

At $1,400,000, the estimated cost is above the county median for renovation and alteration projects in Dallas County, which stands at $249,000. The project’s size of 8,450 square feet is also above the median of 4,226 square feet for similar filings. The cost per square foot is $166, exceeding the county median of $72 per square foot. The scheduled build window of 235 days is longer than the county median of 92 days for comparable work.

The City of Sachse has six other TDLR-registered projects totaling $8,643,000, including Woodbridge Parkway and Bailey Road improvements. Dccm Infrastructure has two other registered projects, totaling $6,535,000, including work on Jupiter Road and Woodbridge Parkway. A City of Sachse bid posting described the project as the reconstruction of approximately 1,500 linear feet of West Creek Drive, converting existing asphalt to new concrete.

Project Context and Area Profile

ZIP code 75048, where this project is located, has a population of about 29,600 and a median household income of $129,024, according to U.S. Census ACS 2023 estimates. The area has 10,445 housing units with a median owner-occupied home value of $366,000. Housing in this area is predominantly owner-occupied. Dallas County’s unemployment rate was 3.3 percent in July 2026, higher than a year earlier, per FRED data.

This project is part of a broader municipal effort to improve local infrastructure in Sachse. The scope includes roadway, sidewalk, and buffer improvements, reflecting a comprehensive approach to street upgrades. The involvement of public funds and federal funding underscores the project’s significance for local transportation and accessibility.

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 75048 (Sachse)

One email per change. Unsubscribe in one click. Privacy.

WEST CREEK LANE RECONSTRUCTION is a Renovation/Alteration project located at 5009W EST CREEK LN TO 3310 SACHSE RD, Sachse, TX 75048 in Sachse, Texas. The project has an estimated value of $1.4M covering 8,450 sq ft. CITY OF SACHSE is the property owner and DCCM INFRASTRUCTURE is the design firm of record. The project was registered with TDLR on June 1, 2026.

Frequently Asked Questions

When is the West Creek Lane Reconstruction scheduled to finish?

Construction is scheduled to finish in February 2027, with work starting in June 2026.

Who is the owner of the West Creek Lane Reconstruction project?

The City of Sachse is the owner of record for this project, as listed in the TDLR filing.

What is the scope of the West Creek Lane Reconstruction project?

The scope includes roadway, sidewalk, and buffer improvements, as detailed in the project filing.

What is WEST CREEK LANE RECONSTRUCTION?

WEST CREEK LANE RECONSTRUCTION is a renovation/alteration project at 5009W EST CREEK LN TO 3310 SACHSE RD in Sachse, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: ROADWAY, SIDEWALK AND BFR

Is WEST CREEK LANE RECONSTRUCTION open in Sachse?

WEST CREEK LANE RECONSTRUCTION is still under construction in Sachse, TX, with an estimated completion of Feb 2027 according to its TDLR registration.

Where is WEST CREEK LANE RECONSTRUCTION located?

WEST CREEK LANE RECONSTRUCTION is located at 5009W EST CREEK LN TO 3310 SACHSE RD, Sachse, TX, 75048, in Dallas County.

Who is the owner or developer of WEST CREEK LANE RECONSTRUCTION?

CITY OF SACHSE is the property owner/developer of record for WEST CREEK LANE RECONSTRUCTION, per its TDLR project registration.

Who is the architect or design firm for WEST CREEK LANE RECONSTRUCTION?

DCCM INFRASTRUCTURE is the design firm of record for WEST CREEK LANE RECONSTRUCTION, according to its TDLR filing.

How much does WEST CREEK LANE RECONSTRUCTION cost and how big is it?

WEST CREEK LANE RECONSTRUCTION has an estimated construction value of $1.4M and approximately 8,450 square feet (about $166/sqft), based on its TDLR filing.

Scope of Work

ROADWAY, SIDEWALK AND BFR

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

5009W EST CREEK LN TO 3310 SACHSE RD, Sachse, TX, 75048

Location by street address

Watch all construction in 75048 (Sachse)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.