Project intelligenceTDLR TABS2026021768New Construction
Funding type

This project is privately funded, on private land for private use.

Electrify America EV Charging Stations in Keller, TX

940 Keller Pkwy, Keller, TX, 76248

Opening ~Mar 2027Review Complete

Electrify America EV Charging Stations is a new construction project at 940 Keller Pkwy, Keller, in Tarrant County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Mar 2027. The project has an estimated value of $200K across about 810 sq ft.

Estimated project value
$200K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
810 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$247/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
6 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Jun 2, 2026272 days across supplied datesMar 1, 2027

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    25 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    66 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    181 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About Electrify America EV Charging Stations

Electrify America, LLC is building new electric vehicle charging stations in the existing parking lot of a retail center at 940 Keller Pkwy, Keller, TX 76248. The project covers 810 square feet of new construction within Tarrant County. This development is privately funded and located on private land for private use.

The estimated cost for the project is $200,000, which calculates to $247 per square foot. This figure is above the county median of $120 per square foot for similar new construction filings. The total estimated cost is below the county median of $800,000, placing it in the bottom quarter of recent Tarrant County projects.

Project Details and Status

The owner of record is Grapevine/Wall Joint Venture, and the design firm is Selective Site Consultants, Inc. Jeffrey A Gutknecht is the registered accessibility specialist. The project was registered with TDLR in June 2026, and plan review was completed in the same month. The TDLR status is listed as Review Complete.

Construction is scheduled to start in September 2026. The filing indicates the project is scheduled to finish in March 2027. The scheduled build window is 181 days, which is close to the county median of 214 days for new construction.

Selective Site Consultants, Inc. has six other TDLR-registered projects totaling $500,000. These include Roam Energy in Houston, Russell & Smith Ford in Houston, Dollar Tree in Fort Worth, Arlington Park Square in Arlington, and John Eagle Acura in Houston. The area profile for ZIP 76248 shows a population of about 40,130 and a median household income of $161,383 according to U.S. Census estimates.

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 76248 (Keller)

One email per change. Unsubscribe in one click. Privacy.

Electrify America EV Charging Stations is a New Construction project located at 940 Keller Pkwy, Keller, TX 76248 in Keller, Texas. The project has an estimated value of $200K covering 810 sq ft. GRAPEVINE/WALL JOINT VENTURE is the property owner and Selective Site Consultants, Inc. is the design firm of record. The project was registered with TDLR on June 2, 2026.

Frequently Asked Questions

Where is the Electrify America EV station project located?

The project is located at 940 Keller Pkwy, Keller, TX 76248, within the existing retail center parking lot.

What is the estimated cost and size of the project?

The estimated cost is $200,000 for 810 square feet of new construction.

When is the construction scheduled to finish?

Construction is scheduled to start in September 2026 and is scheduled to finish in March 2027.

Who is the design firm for this project?

Selective Site Consultants, Inc. is the design firm of record for the Electrify America EV charging stations.

What is Electrify America EV Charging Stations?

Electrify America EV Charging Stations is a new construction project at 940 Keller Pkwy in Keller, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Proposed EV charging stations in existing retail center parking lot.

Is Electrify America EV Charging Stations open in Keller?

Electrify America EV Charging Stations is still under construction in Keller, TX, with an estimated completion of Mar 2027 according to its TDLR registration.

Where is Electrify America EV Charging Stations located?

Electrify America EV Charging Stations is located at 940 Keller Pkwy, Keller, TX, 76248, in Tarrant County.

Who is the owner or developer of Electrify America EV Charging Stations?

GRAPEVINE/WALL JOINT VENTURE is the property owner/developer of record for Electrify America EV Charging Stations, per its TDLR project registration.

Who is the architect or design firm for Electrify America EV Charging Stations?

Selective Site Consultants, Inc. is the design firm of record for Electrify America EV Charging Stations, according to its TDLR filing.

How much does Electrify America EV Charging Stations cost and how big is it?

Electrify America EV Charging Stations has an estimated construction value of $200K and approximately 810 square feet (about $247/sqft), based on its TDLR filing.

Scope of Work

Proposed EV charging stations in existing retail center parking lot.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

940 Keller Pkwy, Keller, TX, 76248

Location by street address