Project intelligenceTDLR TABS2026021902New Construction
Funding type

This project is privately funded, on private land for private use.

Take 5 Oil Change

1000 Junction Highway, Kerrville, TX, 78028

Opening ~Dec 2026Review Complete

Take 5 Oil Change is a new construction project at 1000 Junction Highway, Kerrville, in Kerr County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Dec 2026. The project has an estimated value of $850K across about 1,956 sq ft.

Estimated project value
$850K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
1,956 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$435/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
5 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Jun 3, 2026208 days across supplied datesDec 28, 2026

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    19 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    42 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    147 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About Take 5 Oil Change

Take 5 Oil Change - Kerrville is a new construction project located at 1000 Junction Highway in Kerrville, Texas. The filing describes the scope as a new building totaling 1,956 square feet. This development is privately funded on private land for private use, with Matthew Dieterle listed as the owner or developer of record.

TDLR completed plan review in June 2026 and construction is scheduled to finish in December 2026, with work starting August 2026. The project was registered with the Texas Department of Licensing and Regulation in June 2026. The current status is Review Complete, indicating that the required accessibility plan review has been finalized before the start of physical construction.

Cost and Scale

The estimated cost for this project is $850,000. At 1,956 square feet, this calculates to $435 per square foot. In comparison to 184 TDLR-registered new construction filings in Kerr County, this project's cost is close to the county median of $970,000. However, the $435 per square foot rate is above the county median of $197 per square foot. The scheduled build window of 147 days is shorter than the county median of 242 days for similar projects.

Kari Thomas is the registered accessibility specialist for this project. The surrounding area in ZIP code 78028 has a population of about 40,829 and a median household income of $65,486 according to U.S. Census ACS 2023 five-year estimates. Housing in this area is mostly owner-occupied, with a median owner-occupied home value of $281,300.

The project is situated in Kerr County, where the unemployment rate was 3.8 percent in July 2026. The specific location on Junction Highway places this new building within the established commercial corridor of Kerrville. The registration details confirm that the structural and accessibility plans have met state requirements, clearing the path for the construction phase to begin in August 2026 as planned.

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 78028 (Kerrville)

One email per change. Unsubscribe in one click. Privacy.

Take 5 Oil Change is a New Construction project located at 1000 Junction Highway, Kerrville, TX 78028 in Kerrville, Texas. The project has an estimated value of $850K covering 1,956 sq ft. Matthew Dieterle is the property owner. The project was registered with TDLR on June 3, 2026.

Frequently Asked Questions

When is construction scheduled to finish?

Construction is scheduled to finish in December 2026. Work is set to start in August 2026, following the completion of plan review in June 2026.

What is the estimated cost of the project?

The estimated cost is $850,000. This breaks down to $435 per square foot for the 1,956 square foot new building.

Who is the owner of record?

Matthew Dieterle is listed as the owner or developer of record for the Take 5 Oil Change project in Kerrville.

Is the business currently open?

The TDLR record only tracks construction status. The project is scheduled to finish in December 2026, so the business is not yet operational.

What is the TDLR status?

The TDLR status is Review Complete. Plan review was finished in June 2026, allowing construction to proceed as scheduled.

What is Take 5 Oil Change?

Take 5 Oil Change is a new construction project at 1000 Junction Highway in Kerrville, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: New Building ( 1,956 SQ FT)

Is Take 5 Oil Change open in Kerrville?

Take 5 Oil Change is still under construction in Kerrville, TX, with an estimated completion of Dec 2026 according to its TDLR registration.

Where is Take 5 Oil Change located?

Take 5 Oil Change is located at 1000 Junction Highway, Kerrville, TX, 78028, in Kerr County.

Who is the owner or developer of Take 5 Oil Change?

Matthew Dieterle is the property owner/developer of record for Take 5 Oil Change, per its TDLR project registration.

How much does Take 5 Oil Change cost and how big is it?

Take 5 Oil Change has an estimated construction value of $850K and approximately 1,956 square feet (about $435/sqft), based on its TDLR filing.

Scope of Work

New Building ( 1,956 SQ FT)

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

1000 Junction Highway, Kerrville, TX, 78028

Location by street address

Watch all construction in 78028 (Kerrville)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Kerrville?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.