MUP Three Suite 5 is a renovation/alteration project at 300 South 2nd Street, Waco, in McLennan County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Jan 2027. The project has an estimated value of $75K across about 1,800 sq ft.
๐Project Metrics
TDLR #TABS2026022078Review Complete
Design review complete, construction may proceed
MUP Three Suite 5 is a Renovation/Alteration project located at 300 South 2nd Street, Waco, TX 76701 in Waco, Texas. The project has an estimated value of $75K covering 1,800 sq ft. Mary U Parks Three LLC is the property owner and KISS Engineering is the design firm of record. The project was registered with TDLR on June 4, 2026.
โFrequently Asked Questions
What is MUP Three Suite 5?
MUP Three Suite 5 is a renovation/alteration project at 300 South 2nd Street in Waco, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior buildout of a lease space
Is MUP Three Suite 5 open in Waco?
MUP Three Suite 5 is still under construction in Waco, TX, with an estimated completion of Jan 2027 according to its TDLR registration.
Where is MUP Three Suite 5 located?
MUP Three Suite 5 is located at 300 South 2nd Street, Waco, TX, 76701, in McLennan County.
Who is the owner or developer of MUP Three Suite 5?
Mary U Parks Three LLC is the property owner/developer of record for MUP Three Suite 5, per its TDLR project registration.
Who is the architect or design firm for MUP Three Suite 5?
KISS Engineering is the design firm of record for MUP Three Suite 5, according to its TDLR filing.
How much does MUP Three Suite 5 cost and how big is it?
MUP Three Suite 5 has an estimated construction value of $75K and approximately 1,800 square feet (about $42/sqft), based on its TDLR filing.
๐Scope of Work
Interior buildout of a lease space
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jun 4, 2026
Review Complete
Jun 4, 2026
Inspection Complete
Closed