Project intelligenceTDLR TABS2026022110New Construction
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Sienna Section 72

2227 1/2 Owen Bend Drive, Missouri City, TX, 77459

Opening ~Nov 2026Review Complete

Sienna Section 72 is a new construction project at 2227 1/2 Owen Bend Drive, Missouri City, in Fort Bend County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Nov 2026. The project has an estimated value of $425K across about 98,250 sq ft.

Estimated project value
$425K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
98,250 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$4/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
4 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

Explore the linked construction record and source history

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Jun 4, 2026169 days across supplied datesNov 20, 2026

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    60 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    109 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About Sienna Section 72

Sienna Section 72 is a new construction project in Missouri City that involves the installation of concrete sidewalks, landscape, and irrigation. The site is located at 2227 1/2 Owen Bend Drive in Fort Bend County. The project covers a total area of 98,250 sq ft, with an estimated cost of $425,000.

Project Status and Timeline

TDLR completed plan review in June 2026 and construction is scheduled to finish in November 2026, with work starting August 2026. The TDLR status for this registration is listed as Review Complete. This timeline aligns with the filing dates provided by the registered accessibility specialist, Michael Herman.

The owner of record is Toll GTIS Property Owner LLC, and the design firm of record is TBG. This project involves public funds, public land, or is a Federally funded roadway project, which is noted in the registration details. The estimated cost per square foot is $4, a figure that is below the county median of $100 for similar new construction filings in Fort Bend County.

For context, the median estimated cost for new construction projects in Fort Bend County is $700,000, with a median size of 9,215 sq ft. This project’s scheduled build window of 109 days is shorter than the county median of 199 days. Toll GTIS Property Owner LLC has six other TDLR-registered projects in the area, and TBG has designed six other projects, indicating a consistent presence in the local development market.

The surrounding area, ZIP code 77459, has a population of about 81,251 according to U.S. Census ACS 2023 five-year estimates. The median household income in this ZIP code is $132,758, and the median owner-occupied home value is $367,700. Housing in this area is predominantly owner-occupied, reflecting a stable residential community where this new infrastructure will be added.

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 77459 (Missouri City)

One email per change. Unsubscribe in one click. Privacy.

Sienna Section 72 is a New Construction project located at 2227 1/2 Owen Bend Drive, Missouri City, TX 77459 in Missouri City, Texas. The project has an estimated value of $425K covering 98,250 sq ft. Toll GTIS Property Owner LLC is the property owner and TBG is the design firm of record. The project was registered with TDLR on June 4, 2026.

Frequently Asked Questions

What is the current status of the Sienna Section 72 project?

TDLR completed plan review in June 2026. Construction is scheduled to start in August 2026 and is scheduled to finish in November 2026. The TDLR status is Review Complete.

Who is the owner and design firm for this project?

The owner of record is Toll GTIS Property Owner LLC. The design firm of record is TBG. The registered accessibility specialist is Michael Herman.

What is the estimated cost and size of the project?

The estimated cost is $425,000. The total square footage is 98,250 sq ft. The scope includes concrete sidewalks, landscape, and irrigation installation.

Is the Sienna business open for customers?

The TDLR record only covers construction status. It does not provide information on business opening dates or operational status. Construction is scheduled to finish in November 2026.

Where is the project located?

The project is located at 2227 1/2 Owen Bend Drive, Missouri City, TX 77459, in Fort Bend County.

What is Sienna Section 72?

Sienna Section 72 is a new construction project at 2227 1/2 Owen Bend Drive in Missouri City, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Installation of concrete sidewalks, landscape, and irrigation.

Is Sienna Section 72 open in Missouri City?

Sienna Section 72 is still under construction in Missouri City, TX, with an estimated completion of Nov 2026 according to its TDLR registration.

Where is Sienna Section 72 located?

Sienna Section 72 is located at 2227 1/2 Owen Bend Drive, Missouri City, TX, 77459, in Fort Bend County.

Who is the owner or developer of Sienna Section 72?

Toll GTIS Property Owner LLC is the property owner/developer of record for Sienna Section 72, per its TDLR project registration.

Who is the architect or design firm for Sienna Section 72?

TBG is the design firm of record for Sienna Section 72, according to its TDLR filing.

How much does Sienna Section 72 cost and how big is it?

Sienna Section 72 has an estimated construction value of $425K and approximately 98,250 square feet (about $4/sqft), based on its TDLR filing.

Scope of Work

Installation of concrete sidewalks, landscape, and irrigation.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

2227 1/2 Owen Bend Drive, Missouri City, TX, 77459

Location by street address

Watch all construction in 77459 (Missouri City)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Missouri City?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.