TIFA CHOCOLATE AND GELATO
TIFA CHOCOLATE AND GELATO is a renovation/alteration project at 508 E. San Gabriel Suite 150, Leander, in Williamson County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Dec 2026. The project has an estimated value of $175K across about 1,200 sq ft.
๐Project Metrics
TDLR #TABS2026022145Project Registered
Project has been registered with TDLR and is in pre-construction phase
TIFA CHOCOLATE AND GELATO is a Renovation/Alteration project located at 508 E. San Gabriel Suite 150, Leander, TX 76841 in Leander, Texas. The project has an estimated value of $175K covering 1,200 sq ft. ATX Northline, Ltd. is the property owner and J STUDIO is the design firm of record. The project was registered with TDLR on June 5, 2026.
โFrequently Asked Questions
What is TIFA CHOCOLATE AND GELATO?
TIFA CHOCOLATE AND GELATO is a renovation/alteration project at 508 E. San Gabriel Suite 150 in Leander, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: 1,200 SF FIRST GENERATION TENANT IMPROVEMENT TO EXISTING SHELL- NEW MEP, FINISHES
Is TIFA CHOCOLATE AND GELATO open in Leander?
TIFA CHOCOLATE AND GELATO is still under construction in Leander, TX, with an estimated completion of Dec 2026 according to its TDLR registration.
Where is TIFA CHOCOLATE AND GELATO located?
TIFA CHOCOLATE AND GELATO is located at 508 E. San Gabriel Suite 150, Leander, TX, 76841, in Williamson County.
Who is the owner or developer of TIFA CHOCOLATE AND GELATO?
ATX Northline, Ltd. is the property owner/developer of record for TIFA CHOCOLATE AND GELATO, per its TDLR project registration.
Who is the architect or design firm for TIFA CHOCOLATE AND GELATO?
J STUDIO is the design firm of record for TIFA CHOCOLATE AND GELATO, according to its TDLR filing.
How much does TIFA CHOCOLATE AND GELATO cost and how big is it?
TIFA CHOCOLATE AND GELATO has an estimated construction value of $175K and approximately 1,200 square feet (about $146/sqft), based on its TDLR filing.
๐Scope of Work
1,200 SF FIRST GENERATION TENANT IMPROVEMENT TO EXISTING SHELL- NEW MEP, FINISHES
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jun 5, 2026
Review Complete
Inspection Complete
Closed
๐Related Projects
๐คSame Owner
$8.2M total๐๏ธSame Design Firm
$375K total๐Related City Permits
Building permits found at or near this location
Express: Tub to shower conversion. Replace bathroom window.
Express: Tub to shower conversion. Replace bathroom window.
Replacement of complete existing central heat and air system with or without duct work
ETJ - Replace a 100amp main breaker disconnect for mobile home pedestal
Replacement of complete existing central heat and air system with or without duct work Replace evaporator coil and condenser.