Project intelligenceTDLR TABS2026022170New Construction
Funding type

This project is privately funded, on private land for private use.

NW99 B.P. Fire Pump House 2

20240 Clay Industrial RD FP Tomball, tx 77377, Tomball, Clay Industrial RD FP Tomball, TX, 77377

Opening ~Jul 2028Project Registered

NW99 B.P. Fire Pump House 2 is a new construction project at 20240 Clay Industrial RD FP Tomball, tx 77377, Tomball, Clay Industrial RD FP Tomball, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Jul 2028. The project has an estimated value of $354K across about 500 sq ft.

Estimated project value
$354K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
500 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$708/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
2y 1mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Jun 5, 2026780 days across supplied datesJul 24, 2028

3 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    45 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    735 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About NW99 B.P. Fire Pump House 2

A new 500-square-foot utility building is under construction at 20240 Clay Industrial RD FP Tomball in Tomball, Texas. The structure, registered as NW99 B.P. Fire Pump House 2, will house the fire sprinkler system pump and an associated water tank for the Northwest 99 Business Park. This dedicated infrastructure supports the safety systems for the surrounding commercial development.

The project is a new construction effort with an estimated cost of $353,951. This valuation places the cost per square foot at $708, a figure that sits above the Harris County median of $88 for similar new construction filings. While the total project cost is below the county median of $750,000, the specialized nature of the facility drives the higher per-unit cost. The scope is strictly limited to the utility functions required for the business park’s fire suppression capabilities.

Development and Design

Clay Development & Construction serves as the design firm of record for this project. The firm has six other TDLR-registered projects in the region, with a combined value exceeding $36 million. These include distribution centers in Tomball and Brookshire, as well as facilities in Mustang Ridge and Stafford. The owner of record is the Northwest 99 Business Park Property Owner Association, which manages the development of this private commercial zone.

Construction is scheduled to begin in July 2026 following the initial registration with the Texas Department of Licensing and Regulation in June 2026. The filing indicates a planned completion date, with the project targeted for July 2028. This two-year build window is longer than the county median of 219 days for new construction, reflecting the specific engineering requirements for fire pump infrastructure and water tank installation.

The site is located in Harris County, within the ZIP code 77377 area. Census estimates for this region indicate a population of approximately 39,154 residents and a median household income of $123,015. The project is privately funded and situated on private land for exclusive use by the business park tenants. Laura Fulkerson is the registered accessibility specialist associated with this filing, ensuring compliance with state standards during the design and review process.

As the project moves through plan review, the focus remains on the robust installation of the pump and tank systems. The infrastructure is critical for the operational safety of the Northwest 99 Business Park. The construction timeline accounts for the specialized nature of the work, ensuring that the fire suppression systems are fully integrated before the scheduled completion.

Project Registered

Project has been registered with TDLR and is in pre-construction phase

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 77377 (Clay Industrial RD FP Tomball)

One email per change. Unsubscribe in one click. Privacy.

NW99 B.P. Fire Pump House 2 is a New Construction project located at 20240 Clay Industrial RD FP Tomball, tx 77377, Tomball, TX 77377 in Clay Industrial RD FP Tomball, Texas. The project has an estimated value of $354K covering 500 sq ft. Northwest 99 Business Park Property Owner Association is the property owner and Clay Development & Construction is the design firm of record. The project was registered with TDLR on June 5, 2026.

Frequently Asked Questions

What is the purpose of the new building?

The 500-square-foot structure will house a fire sprinkler system pump and an associated water tank. This utility building is designed to serve the safety needs of the Northwest 99 Business Park.

Who is the owner of the project?

The owner of record is the Northwest 99 Business Park Property Owner Association. The project is privately funded and located on private land for the exclusive use of the business park.

What is the estimated cost of construction?

The filing lists an estimated cost of $353,951. This amount works out to $708 per square foot, which is above the Harris County median for new construction projects of this type.

When is the project expected to be finished?

Construction is set to start in July 2026. The TDLR filing states that completion is targeted for July 2028, allowing for a two-year build window for the specialized utility work.

Is the business park currently open?

The TDLR record covers the construction of the fire pump house. It does not provide information regarding the operational status or opening dates of the individual businesses within the Northwest 99 Business Park.

What is NW99 B.P. Fire Pump House 2?

NW99 B.P. Fire Pump House 2 is a new construction project at 20240 Clay Industrial RD FP Tomball, tx 77377, Tomball in Clay Industrial RD FP Tomball, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: New Utility building for fire sprinkler system pump and associated water tank to serve NW99 Business park .

Is NW99 B.P. Fire Pump House 2 open in Clay Industrial RD FP Tomball?

NW99 B.P. Fire Pump House 2 is still under construction in Clay Industrial RD FP Tomball, TX, with an estimated completion of Jul 2028 according to its TDLR registration.

Where is NW99 B.P. Fire Pump House 2 located?

NW99 B.P. Fire Pump House 2 is located at 20240 Clay Industrial RD FP Tomball, tx 77377, Tomball, Clay Industrial RD FP Tomball, TX, 77377, in Harris County.

Who is the owner or developer of NW99 B.P. Fire Pump House 2?

Northwest 99 Business Park Property Owner Association is the property owner/developer of record for NW99 B.P. Fire Pump House 2, per its TDLR project registration.

Who is the architect or design firm for NW99 B.P. Fire Pump House 2?

Clay Development & Construction is the design firm of record for NW99 B.P. Fire Pump House 2, according to its TDLR filing.

How much does NW99 B.P. Fire Pump House 2 cost and how big is it?

NW99 B.P. Fire Pump House 2 has an estimated construction value of $354K and approximately 500 square feet (about $708/sqft), based on its TDLR filing.

Scope of Work

New Utility building for fire sprinkler system pump and associated water tank to serve NW99 Business park .

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

20240 Clay Industrial RD FP Tomball, tx 77377, Tomball, Clay Industrial RD FP Tomball, TX, 77377

Location by street address

Watch all construction in 77377 (Clay Industrial RD FP Tomball)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Clay Industrial RD FP Tomball?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.