Project intelligenceTDLR TABS2026022580New Construction
Funding type

This project is privately funded, on private land for private use.

Lakeside Country Club Maintenance Facility in Houston, TX

100 Wilcrest Dr, Building K, Houston, TX, 77092

Opening ~Aug 2027Review Complete

Lakeside Country Club Maintenance Facility is a new construction project at 100 Wilcrest Dr, Building K, Houston, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Aug 2027. The project has an estimated value of $2.4M across about 10,923 sq ft.

Estimated project value
$2.4M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
10,923 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$221/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1 year
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Jun 11, 2026446 days across supplied datesAug 31, 2027

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    20 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    62 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    364 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About Lakeside Country Club Maintenance Facility

Lakeside Country Club is building a new 10,923-square-foot maintenance facility at 100 Wilcrest Dr, Building K, in Houston. The project, valued at $2,417,000, involves the construction of a new office and warehouse structure. This new building is part of a larger development effort by the club, which also registered a separate teaching center project that has already closed.

The site is located within Harris County and falls inside a FEMA Special Flood Hazard Area, specifically zone AE. This designation is important for understanding the site’s environmental context and potential regulatory considerations for construction in this part of Houston. The project is privately funded and situated on private land for private use.

Timeline and Status

Construction is scheduled to begin in September 2026. TDLR completed the plan review process in July 2026, clearing the way for the start of physical work. The entire project is scheduled to finish in August 2027. This timeline represents a build window of 364 days, which is longer than the 219-day median scheduled build window for similar new construction projects in Harris County.

The estimated cost of $2,417,000 places this project in the top quarter of estimated costs for new construction filings in the county. The cost per square foot is $221, which is above the county median of $88 per square foot. The square footage of 10,923 sq ft is also above the county median of 9,000 sq ft for new construction projects.

Owner and Registration

Lakeside Country Club is the owner and developer of record for this project. The registered accessibility specialist for the filing is Landy Perkins. The project was registered with TDLR in June 2026. The status of the TDLR record is Review Complete, indicating that the regulatory review phase has been finished and the project is moving into the construction phase.

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 77092 (Houston)

One email per change. Unsubscribe in one click. Privacy.

Lakeside Country Club Maintenance Facility is a New Construction project located at 100 Wilcrest Dr, Building K, Houston, TX 77092 in Houston, Texas. The project has an estimated value of $2.4M covering 10,923 sq ft. Lakeside Country Club is the property owner. The project was registered with TDLR on June 11, 2026.

Frequently Asked Questions

What is the total cost of the new maintenance facility?

The estimated cost for the new maintenance facility is $2,417,000. This figure includes the construction of the new office and warehouse structure at 100 Wilcrest Dr.

How large is the new building?

The new building has a total square footage of 10,923 sq ft. This size is above the median square footage for new construction projects in Harris County.

When will construction start and end?

Construction is scheduled to start in September 2026. The project is scheduled to finish in August 2027, following the completion of plan review in July 2026.

Is the project in a flood zone?

Yes, the site is inside a FEMA Special Flood Hazard Area, specifically zone AE. This is determined by the site coordinates in the FEMA National Flood Hazard Layer.

Who is the owner of the project?

Lakeside Country Club is the owner and developer of record. The registered accessibility specialist for the project is Landy Perkins.

What is Lakeside Country Club Maintenance Facility?

Lakeside Country Club Maintenance Facility is a new construction project at 100 Wilcrest Dr, Building K in Houston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Construction of new office and warehouse

Is Lakeside Country Club Maintenance Facility open in Houston?

Lakeside Country Club Maintenance Facility is still under construction in Houston, TX, with an estimated completion of Aug 2027 according to its TDLR registration.

Where is Lakeside Country Club Maintenance Facility located?

Lakeside Country Club Maintenance Facility is located at 100 Wilcrest Dr, Building K, Houston, TX, 77092, in Harris County.

Who is the owner or developer of Lakeside Country Club Maintenance Facility?

Lakeside Country Club is the property owner/developer of record for Lakeside Country Club Maintenance Facility, per its TDLR project registration.

How much does Lakeside Country Club Maintenance Facility cost and how big is it?

Lakeside Country Club Maintenance Facility has an estimated construction value of $2.4M and approximately 10,923 square feet (about $221/sqft), based on its TDLR filing.

Scope of Work

Construction of new office and warehouse

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

100 Wilcrest Dr, Building K, Houston, TX, 77092

Loading location map…
29.76139, -95.57623

Watch all construction in 77092 (Houston)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.