CC Winn High School Athletic Changing Facility in Eagle Pass, TX
265 North Foster Maldonado Blvd, Eagle Pass, TX, 78852
CC Winn High School Athletic Changing Facility is a new construction project at 265 North Foster Maldonado Blvd, Eagle Pass, in Maverick County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Jul 2027. The project has an estimated value of $1.5M across about 5,000 sq ft.
- Estimated project value
- $1.5M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 5,000 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $296/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 1 year
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
11 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
28 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
365 days after the preceding date shown.
Source: TDLR filing
View source record
📰About CC Winn High School Athletic Changing Facility
Eagle Pass ISD CC Winn High School is the site of a new 5,000-square-foot athletic changing and storage facility. The project, filed as the CC Winn High School Athletic Changing Facility, is located at 265 North Foster Maldonado Blvd in Eagle Pass, Texas. This new construction effort by Eagle Pass Independent School District is valued at an estimated $1,480,000, equating to $296 per square foot.
Davis Powell Architecture serves as the design firm of record for this project. The scope of work is specifically defined as a PEMB athletic changing and storage facility. The project involves public funds and public land, reflecting its status as a district-owned school improvement.
TDLR completed the plan review process in June 2026. Construction is scheduled to finish in July 2027, with work starting in July 2026. This timeline represents a 365-day build window, which is longer than the 256-day median scheduled build window for new construction projects in Maverick County. The estimated cost is above the county median of $975,000 for similar filings, and the cost per square foot is above the county median of $170.
Project Context and Comparisons
Eagle Pass Independent School District has six other TDLR-registered projects totaling $3,150,000. These include field houses at Eagle Pass Junior High and Memorial Junior High, as well as multiple projects at Eagle Pass High School and CC Winn High School. Davis Powell Architecture has designed six other projects totaling $8,495,000 across San Antonio, East Bernard, Uvalde, and Laredo. The design firm’s portfolio includes commercial and office buildings, demonstrating experience beyond educational facilities.
The ZIP code 78852 area has a population of about 56,933 residents, with a median household income of $52,295. Median owner-occupied home values stand at $150,200, and housing is mostly owner-occupied. These Census estimates provide a demographic baseline for the community served by the new athletic facility. The project contributes to the infrastructure supporting local students and athletic programs in Maverick County.
Review Complete
Design review complete, construction may proceed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 78852 (Eagle Pass)
One email per change. Unsubscribe in one click. Privacy.
CC Winn High School Athletic Changing Facility is a New Construction project located at 265 North Foster Maldonado Blvd, Eagle Pass, TX 78852 in Eagle Pass, Texas. The project has an estimated value of $1.5M covering 5,000 sq ft. Eagle Pass Independent School District is the property owner and Davis Powell Architecture is the design firm of record. The project was registered with TDLR on June 11, 2026.
Frequently Asked Questions
What is the current status of the CC Winn High School athletic facility project?
TDLR completed plan review in June 2026. Construction is scheduled to finish in July 2027, with work starting in July 2026. The project is in the pre-construction phase.
How much will the new athletic changing facility cost?
The estimated cost is $1,480,000. This equates to $296 per square foot for the 5,000-square-foot structure. The cost is above the Maverick County median for new construction.
Who is designing the new facility at CC Winn High School?
Davis Powell Architecture is the design firm of record. They are responsible for the architectural design of the PEMB athletic changing and storage facility.
Is the new athletic facility open for use?
The facility is not yet open. Construction is scheduled to finish in July 2027, and work is set to begin in July 2026.
What type of structure is being built?
The project is a new construction PEMB athletic changing and storage facility. It will be 5,000 square feet in size and located at 265 North Foster Maldonado Blvd.
What is CC Winn High School Athletic Changing Facility?
CC Winn High School Athletic Changing Facility is a new construction project at 265 North Foster Maldonado Blvd in Eagle Pass, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: PEMB athletic changing and storage facility
Is CC Winn High School Athletic Changing Facility open in Eagle Pass?
CC Winn High School Athletic Changing Facility is still under construction in Eagle Pass, TX, with an estimated completion of Jul 2027 according to its TDLR registration.
Where is CC Winn High School Athletic Changing Facility located?
CC Winn High School Athletic Changing Facility is located at 265 North Foster Maldonado Blvd, Eagle Pass, TX, 78852, in Maverick County.
Who is the owner or developer of CC Winn High School Athletic Changing Facility?
Eagle Pass Independent School District is the property owner/developer of record for CC Winn High School Athletic Changing Facility, per its TDLR project registration.
Who is the architect or design firm for CC Winn High School Athletic Changing Facility?
Davis Powell Architecture is the design firm of record for CC Winn High School Athletic Changing Facility, according to its TDLR filing.
How much does CC Winn High School Athletic Changing Facility cost and how big is it?
CC Winn High School Athletic Changing Facility has an estimated construction value of $1.5M and approximately 5,000 square feet (about $296/sqft), based on its TDLR filing.
Scope of Work
PEMB athletic changing and storage facility
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
265 North Foster Maldonado Blvd, Eagle Pass, TX, 78852
Related Projects
Same Owner
$2.6M totalWatch all construction in 78852 (Eagle Pass)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Eagle Pass?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.