Funding type
This project involves public funds, public land, or is a Federally funded roadway project.
WLISD Stadium Renovations in Wink, TX
620 East 1st Street, Wink, TX, 79789
WLISD Stadium Renovations is a new construction project at 620 East 1st Street, Wink, in Winkler County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Aug 2027. The project has an estimated value of $6.2M across about 3,100 sq ft.
- Estimated project value
- $6.2M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 3,100 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $1.98K/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 1y 1mo
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
17 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
10 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
382 days after the preceding date shown.
Source: TDLR filing
View source record
📰About WLISD Stadium Renovations
A new canopy and shade structure is rising over the existing stands at Wink-Loving ISD, located at 620 East 1st Street in Wink, Texas. This project, filed under the name WLISD Stadium Renovations, adds 3,100 square feet of covered concourse space to the campus. The estimated cost of the new construction is $6,150,000, which computes to $1,984 per square foot.
Project Scope and Design
The work involves building a new canopy over the existing seating area and creating additional covered concourse space. WRA Architects serves as the design firm of record for this project. Peter Walper is the registered accessibility specialist listed in the TDLR filing. The project is funded by public funds and utilizes public land, as noted in the registration documents.
Wink-Loving ISD is the owner and developer of record. The district has six other TDLR-registered projects totaling $17,250,000, all located in Wink and marked as review complete. These include a $4,800,000 project and a $4,500,000 swine barn project. WRA Architects has also designed six other projects totaling $24,560,051, including schools in Greenville and Desoto.
Timeline and Status
TDLR completed plan review in July 2026. Construction is scheduled to finish in August 2027, with work starting in July 2026. The total scheduled build window is 382 days. This duration is close to the county median of 368 days for new construction projects in Winkler County. The TDLR status is listed as Review Complete.
The estimated cost of $6,150,000 is above the county median of $3,100,000 for new construction filings in Winkler County. It falls within the top quarter of costs for this project type in the region. The $1,984 per square foot cost is also above the county median of $359 per square foot. These figures are derived from 56 TDLR-registered new construction filings in the county.
Wink has a population of about 1,380 residents according to U.S. Census estimates for ZIP code 79789. The median household income in the area is $127,898. The local unemployment rate in Winkler County was 3.7 percent in July 2026, which is higher than the rate from a year earlier.
Review Complete
Design review complete, construction may proceed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 79789 (Wink)
One email per change. Unsubscribe in one click. Privacy.
WLISD Stadium Renovations is a New Construction project located at 620 East 1st Street, Wink, TX 79789 in Wink, Texas. The project has an estimated value of $6.2M covering 3,100 sq ft. Wink-Loving ISD is the property owner and WRA Architects is the design firm of record. The project was registered with TDLR on June 18, 2026.
Frequently Asked Questions
What is the estimated cost of the project?
The estimated cost for the WLISD Stadium Renovations is $6,150,000. This amount is above the county median for new construction projects in Winkler County.
Who is the design firm for this project?
WRA Architects is the design firm of record for the Wink-Loving ISD stadium renovations. They have also designed several other school projects in Texas.
When is construction scheduled to finish?
Construction is scheduled to finish in August 2027. Work is set to start in July 2026, following the completion of plan review in July 2026.
What specific features are being added to the stadium?
The project adds a new canopy/shade structure over existing stands and new covered concourse space. The total new square footage is 3,100 sq ft.
Is the project funded by public money?
Yes, the filing indicates the project involves public funds and public land. It is registered with TDLR and completed plan review in July 2026.
What is WLISD Stadium Renovations?
WLISD Stadium Renovations is a new construction project at 620 East 1st Street in Wink, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: A new canopy/shade structure over existing stands, and new covered concourse space.
Is WLISD Stadium Renovations open in Wink?
WLISD Stadium Renovations is still under construction in Wink, TX, with an estimated completion of Aug 2027 according to its TDLR registration.
Where is WLISD Stadium Renovations located?
WLISD Stadium Renovations is located at 620 East 1st Street, Wink, TX, 79789, in Winkler County.
Who is the owner or developer of WLISD Stadium Renovations?
Wink-Loving ISD is the property owner/developer of record for WLISD Stadium Renovations, per its TDLR project registration.
Who is the architect or design firm for WLISD Stadium Renovations?
WRA Architects is the design firm of record for WLISD Stadium Renovations, according to its TDLR filing.
How much does WLISD Stadium Renovations cost and how big is it?
WLISD Stadium Renovations has an estimated construction value of $6.2M and approximately 3,100 square feet (about $1.98K/sqft), based on its TDLR filing.
Scope of Work
A new canopy/shade structure over existing stands, and new covered concourse space.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
620 East 1st Street, Wink, TX, 79789
Related Projects
Same Owner
$146.8M totalNearby Projects
Within 0.6 miWatch all construction in 79789 (Wink)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Wink?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.