Project intelligenceTDLR TABS2026023196Renovation/Alteration
Funding type

This project is privately funded, on private land for private use.

True Light Barbershop Fate Interior Finish Out

110 Greenhill Ln., Ste 105, Fate, TX, 75087

Target date passed (Sep 2026)Project Registered

True Light Barbershop Fate Interior Finish Out is a renovation/alteration project at 110 Greenhill Ln., Ste 105, Fate, in Rockwall County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Sep 2026 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $100K across about 1,175 sq ft.

Estimated project value
$100K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
1,175 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$85/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
3 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Jun 18, 2026104 days across supplied datesSep 30, 2026

3 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    25 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    79 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About True Light Barbershop Fate Interior Finish Out

True Light Barbershop is undergoing an interior renovation at 110 Greenhill Ln., Ste 105, in Fate, Texas. The project, registered under Fate Place, LLC, involves the finish out of a 1,175 sq ft tenant space. The estimated cost for this renovation/alteration is $100,000, which computes to $85 per square foot.

The scope of work includes the creation of a new shop space, a break room, and a unisex restroom. Specific features include sealed concrete flooring, aluminum-framed doors throughout, and a butcher block countertop. The filing also lists HVAC ductwork and electrical devices as part of the installation.

Project Status and Design

The project was registered with TDLR in June 2026. Plan review is pending, and construction is targeted for September 2026. The filing indicates a scheduled build window of 79 days, starting in July 2026. This timeline is close to the county median of 90 days for similar renovation projects.

BSA Design Group, Inc. is the design firm of record for this project. The registered accessibility specialist is Kimberly J Goss. The project is privately funded on private land for private use.

In Rockwall County, the median estimated cost for renovation/alteration filings is $230,000. This project's cost of $100,000 is below the county median, placing it in the bottom quarter of comparable filings. The median size for these projects is 3,012 sq ft, while this space is 1,175 sq ft. The median cost per square foot is $90, making this project's $85 per square foot close to the average.

BSA Design Group, Inc. has six other TDLR-registered projects totaling $4,216,000. These include a warehouse in Dallas and an office building in Garland, all of which are either registered or have completed review. The area around ZIP code 75087 has a population of about 41,786, with a median household income of $128,590 according to U.S. Census ACS 2023 five-year estimates.

Project Registered

Project has been registered with TDLR and is in pre-construction phase

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 75087 (Fate)

One email per change. Unsubscribe in one click. Privacy.

True Light Barbershop Fate Interior Finish Out is a Renovation/Alteration project located at 110 Greenhill Ln., Ste 105, Fate, TX 75087 in Fate, Texas. The project has an estimated value of $100K covering 1,175 sq ft. Fate Place, LLC is the property owner and BSA Design Group, Inc. is the design firm of record. The project was registered with TDLR on June 18, 2026.

Frequently Asked Questions

Is True Light Barbershop open?

The TDLR record shows the project is registered and targeted for September 2026. It does not confirm the business is open or operating.

Who owns the property at 110 Greenhill Ln.?

Fate Place, LLC is the owner/developer of record for this renovation project in Fate, Texas.

What is the estimated cost of the renovation?

The estimated cost for the interior finish out is $100,000, based on the TDLR filing.

When is construction expected to be complete?

The filing indicates completion is targeted for September 2026, with a scheduled build window of 79 days.

Who is the design firm for this project?

BSA Design Group, Inc. is the design firm of record for this barbershop renovation.

What is True Light Barbershop Fate Interior Finish Out?

True Light Barbershop Fate Interior Finish Out is a renovation/alteration project at 110 Greenhill Ln., Ste 105 in Fate, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior finish out of a barbershop tenant space. New shop space, break room and unisex restroom. Sealed concrete floor, aluminum framed doors throughout, butcher block counter top, hvac ductwork and electrical devices throughout.

Is True Light Barbershop Fate Interior Finish Out open in Fate?

True Light Barbershop Fate Interior Finish Out was scheduled to finish construction in Sep 2026 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.

Where is True Light Barbershop Fate Interior Finish Out located?

True Light Barbershop Fate Interior Finish Out is located at 110 Greenhill Ln., Ste 105, Fate, TX, 75087, in Rockwall County.

Who is the owner or developer of True Light Barbershop Fate Interior Finish Out?

Fate Place, LLC is the property owner/developer of record for True Light Barbershop Fate Interior Finish Out, per its TDLR project registration.

Who is the architect or design firm for True Light Barbershop Fate Interior Finish Out?

BSA Design Group, Inc. is the design firm of record for True Light Barbershop Fate Interior Finish Out, according to its TDLR filing.

How much does True Light Barbershop Fate Interior Finish Out cost and how big is it?

True Light Barbershop Fate Interior Finish Out has an estimated construction value of $100K and approximately 1,175 square feet (about $85/sqft), based on its TDLR filing.

Scope of Work

Interior finish out of a barbershop tenant space. New shop space, break room and unisex restroom. Sealed concrete floor, aluminum framed doors throughout, butcher block counter top, hvac ductwork and electrical devices throughout.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

110 Greenhill Ln., Ste 105, Fate, TX, 75087

Loading location map…
32.94225, -96.38043

Watch all construction in 75087 (Fate)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.