Project intelligenceTDLR TABS2026023250Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

ECISD South MS Gym Floor Replacement

601 W. Freddy Gonzalez Dr., Edinburg, TX, 78539

Opening ~Jul 2027Review Complete

ECISD South MS Gym Floor Replacement is a renovation/alteration project at 601 W. Freddy Gonzalez Dr., Edinburg, in Hidalgo County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Jul 2027. The project has an estimated value of $470K across about 13,000 sq ft.

Estimated project value
$470K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
13,000 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$36/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1 year
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Jun 18, 2026378 days across supplied datesJul 1, 2027

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    13 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    4 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    361 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About ECISD South MS Gym Floor Replacement

Edinburg Consolidated Independent School District is replacing the gym floor at South Middle School, a 13,000 square foot renovation project located at 601 W. Freddy Gonzalez Dr. in Edinburg. The filing, registered with TDLR in June 2026, identifies the scope of work as the removal of the existing gym floor and its replacement with a new surface. The estimated cost for this specific renovation is $470,000.

RIKE Architects serves as the design firm of record for this project. Felipe Guerrero is the registered accessibility specialist listed on the filing. The project is classified as a renovation or alteration and involves public funds. TDLR completed the plan review in July 2026, and construction is scheduled to finish in July 2027, with work starting July 2026.

Project Context and Comparisons

This renovation is part of a broader pattern of school facility updates in the region. Edinburg CISD has six other TDLR-registered projects totaling $3,300,000, including multiple multi-purpose building renovations and a gym addition at Truman Elementary School. RIKE Architects also has one other registered project in the area, the Iwo Jima Monument & Museum in Harlingen, valued at $50,000.

Compared to other renovation filings in Hidalgo County, this project stands out for its size and duration. The estimated cost of $470,000 is above the county median of $250,000 for similar work. The scheduled build window of 365 days is longer than the county median of 92 days. However, the cost per square foot is $36, which is below the county median of $71 per square foot.

South Middle School serves grades 6-8 in Edinburg. According to Niche, the school has 1,246 students and a student-teacher ratio of 14 to 1. The school is part of the Edinburg CISD, which also operates Edinburg High School and Edinburg North High School. The ZIP code 78539 has a population of about 38,162 and a median household income of $64,864, according to U.S. Census estimates.

Hidalgo County had an unemployment rate of 6.8 percent in July 2026, higher than a year earlier. The project’s status is listed as Review Complete by TDLR. No specific contractor is named in the provided facts, only the owner, design firm, and accessibility specialist. The work involves removing the old floor and installing a new one, a standard renovation task in school athletics facilities.

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 78539 (Edinburg)

One email per change. Unsubscribe in one click. Privacy.

ECISD South MS Gym Floor Replacement is a Renovation/Alteration project located at 601 W. Freddy Gonzalez Dr., Edinburg, TX 78539 in Edinburg, Texas. The project has an estimated value of $470K covering 13,000 sq ft. Edinburg Consolidated Independent School District is the property owner and RIKE Architects is the design firm of record. The project was registered with TDLR on June 18, 2026.

Frequently Asked Questions

What is the scope of work for the South Middle School gym project?

The filing specifies the removal of the existing gym floor and its replacement with a new floor. This is classified as a renovation or alteration project.

Who is the owner and design firm for this project?

Edinburg Consolidated Independent School District is the owner of record. RIKE Architects is the design firm of record for the project.

What is the estimated cost and size of the renovation?

The estimated cost is $470,000 for a 13,000 square foot area. This results in a cost of $36 per square foot.

When is the construction scheduled to finish?

Construction is scheduled to finish in July 2027, with work starting in July 2026. TDLR completed plan review in July 2026.

Is the school open during the renovation?

The provided facts do not state whether the school remains open or closed during the construction period. The TDLR record only covers the construction status.

What is ECISD South MS Gym Floor Replacement?

ECISD South MS Gym Floor Replacement is a renovation/alteration project at 601 W. Freddy Gonzalez Dr. in Edinburg, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Remove existing gym floor and Replace with a new floor.

Is ECISD South MS Gym Floor Replacement open in Edinburg?

ECISD South MS Gym Floor Replacement is still under construction in Edinburg, TX, with an estimated completion of Jul 2027 according to its TDLR registration.

Where is ECISD South MS Gym Floor Replacement located?

ECISD South MS Gym Floor Replacement is located at 601 W. Freddy Gonzalez Dr., Edinburg, TX, 78539, in Hidalgo County.

Who is the owner or developer of ECISD South MS Gym Floor Replacement?

Edinburg Consolidated Independent School District is the property owner/developer of record for ECISD South MS Gym Floor Replacement, per its TDLR project registration.

Who is the architect or design firm for ECISD South MS Gym Floor Replacement?

RIKE Architects is the design firm of record for ECISD South MS Gym Floor Replacement, according to its TDLR filing.

How much does ECISD South MS Gym Floor Replacement cost and how big is it?

ECISD South MS Gym Floor Replacement has an estimated construction value of $470K and approximately 13,000 square feet (about $36/sqft), based on its TDLR filing.

Scope of Work

Remove existing gym floor and Replace with a new floor.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

601 W. Freddy Gonzalez Dr., Edinburg, TX, 78539

26.28776, -98.17051

Watch all construction in 78539 (Edinburg)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Edinburg?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.