Project intelligenceTDLR TABS2026023341Renovation/Alteration
Funding type

This project is privately funded, on private land for private use.

Google DFW1.0 Logistics Facility - Buckingham_Battery Room & Office Modification in Fort Worth, TX

9449 Silver Crk Rd, Fort Worth, TX 76108 600 WESTERN TRADE DR, Fort Worth, TX, 76108

Opening ~Nov 2026Review Complete

Google DFW1.0 Logistics Facility - Buckingham_Battery Room & Office Modification is a renovation/alteration project at 9449 Silver Crk Rd, Fort Worth, TX 76108 600 WESTERN TRADE DR, Fort Worth, in Tarrant County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Nov 2026. The project has an estimated value of $1.5M across about 17,500 sq ft.

Estimated project value
$1.5M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
17,500 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$86/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
4 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Jun 19, 2026164 days across supplied datesNov 30, 2026

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    16 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    25 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    123 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About Google DFW1.0 Logistics Facility - Buckingham_Battery Room & Office Modification

The Google DFW1.0 Logistics Facility - Buckingham_Battery Room & Office Modification is an interior renovation project at Silver Creek Business Park Building 2 in Fort Worth. The project involves 17,500 square feet of work with an estimated cost of $1,500,000. TDLR completed plan review in July 2026, and construction is scheduled to finish in November 2026, with work starting July 2026.

The scope includes selective demolition, new interior partitions, and modifications to mechanical, electrical, plumbing, and fire protection systems to create new offices and a battery room. The owner of record is FW 820 LLC, and the design firm is Arcadis Professional Services Inc. The project is privately funded on private land. Blair Baker is the registered accessibility specialist for this filing.

Project Context and Scale

This renovation is significantly larger than the typical Tarrant County alteration project. Among 15,929 registered renovation and alteration filings in the county, the median estimated cost is $250,000 and the median size is 3,900 square feet. This project's cost is in the top quarter for its type, while its $86 per square foot cost is close to the county median of $79 per square foot. The scheduled build window of 123 days is longer than the county median of 92 days.

FW 820 LLC has one other TDLR-registered project, also at this address, with an estimated cost of $250,000 and a status of review complete. Arcadis Professional Services Inc. is also listed as the design firm for that separate filing. The address is 9449 Silver Crk Rd, Fort Worth, TX 76108, and 600 Western Trade Dr, Fort Worth, TX 76108.

Local Records and Permit Activity

City of Fort Worth permit records show at least 25 permits on file at this street address. The 25 most recent permits were issued between January 2025 and June 2026. Types include Commercial Building, Electrical, Mechanical, Plumbing, and Commercial Accessory Structure permits. The declared valuations on those permits total $23,926,500. A certificate-of-occupancy-related record is dated June 2026. These records may include work by other tenants or suites at the same address.

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 76108 (Fort Worth)

One email per change. Unsubscribe in one click. Privacy.

Google DFW1.0 Logistics Facility - Buckingham_Battery Room & Office Modification is a Renovation/Alteration project located at 9449 Silver Crk Rd, Fort Worth, TX 76108 600 WESTERN TRADE DR, Fort Worth, TX 76108 in Fort Worth, Texas. The project has an estimated value of $1.5M covering 17,500 sq ft. FW 820 LLC is the property owner and Arcadis Professional Services Inc. is the design firm of record. The project was registered with TDLR on June 19, 2026.

Frequently Asked Questions

When is the project scheduled to finish?

Construction is scheduled to finish in November 2026. TDLR completed plan review in July 2026, and work started in July 2026.

What is the scope of work?

The work includes selective demolition, new interior partitions, and MEP and fire protection modifications for new offices and a battery room.

Who is the owner and design firm?

The owner of record is FW 820 LLC, and the design firm is Arcadis Professional Services Inc.

Is the business open?

The TDLR record covers construction status only. It does not provide information about business operations or opening dates.

What is Google DFW1.0 Logistics Facility - Buckingham_Battery Room & Office Modification?

Google DFW1.0 Logistics Facility - Buckingham_Battery Room & Office Modification is a renovation/alteration project at 9449 Silver Crk Rd, Fort Worth, TX 76108 600 WESTERN TRADE DR in Fort Worth, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior improvements to an existing building, scope includes modification and addition of offices and new battery room. Work includes selective demolition; new interior partitions and MEP & Fire protection modification as required.

Is Google DFW1.0 Logistics Facility - Buckingham_Battery Room & Office Modification open in Fort Worth?

Google DFW1.0 Logistics Facility - Buckingham_Battery Room & Office Modification is still under construction in Fort Worth, TX, with an estimated completion of Nov 2026 according to its TDLR registration.

Where is Google DFW1.0 Logistics Facility - Buckingham_Battery Room & Office Modification located?

Google DFW1.0 Logistics Facility - Buckingham_Battery Room & Office Modification is located at 9449 Silver Crk Rd, Fort Worth, TX 76108 600 WESTERN TRADE DR, Fort Worth, TX, 76108, in Tarrant County.

Who is the owner or developer of Google DFW1.0 Logistics Facility - Buckingham_Battery Room & Office Modification?

FW 820 LLC is the property owner/developer of record for Google DFW1.0 Logistics Facility - Buckingham_Battery Room & Office Modification, per its TDLR project registration.

Who is the architect or design firm for Google DFW1.0 Logistics Facility - Buckingham_Battery Room & Office Modification?

Arcadis Professional Services Inc. is the design firm of record for Google DFW1.0 Logistics Facility - Buckingham_Battery Room & Office Modification, according to its TDLR filing.

How much does Google DFW1.0 Logistics Facility - Buckingham_Battery Room & Office Modification cost and how big is it?

Google DFW1.0 Logistics Facility - Buckingham_Battery Room & Office Modification has an estimated construction value of $1.5M and approximately 17,500 square feet (about $86/sqft), based on its TDLR filing.

Scope of Work

Interior improvements to an existing building, scope includes modification and addition of offices and new battery room. Work includes selective demolition; new interior partitions and MEP & Fire protection modification as required.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

9449 Silver Crk Rd, Fort Worth, TX 76108 600 WESTERN TRADE DR, Fort Worth, TX, 76108

Loading location map…
32.77319, -97.48258

Related City Permits

Building permits found at or near this location

9449 SILVER CREEK RD, Fort Worth, TX 76108
IssuedElectricalGeneralOct 2026
FTW-PE26-11380
9449 SILVER CREEK RD, Fort Worth, TX 76108
IssuedPlumbingGeneralOct 2026
FTW-PP26-18467
9449 SILVER CREEK RD, Fort Worth, TX 76108

X TEAM /// This project consists of interior improvements includes addition of a new battery room and modification to office areas. Work includes selective demolition; construction of new interior partitions, finishes; and associated architectural improvements. The project also includes mechanical, electrical, plumbing, fire alarm, and fire protection modifications required to support the new layout, including relocation and adjustment of existing ductwork, diffusers, piping, sprinklers, devices, and related accessories. All work will be field verified and coordinated with all disciplines and performed in compliance with applicable codes and regulations. The project is an interior renovation only and does not increase building area or height and does not change the existing occupancy or occupant load.

IssuedRemodelOfficeJun 2026
$1.5M
FTW-PB26-09263
9449 SILVER CREEK RD, Fort Worth, TX 76108

X TEAM /// The scope of work is a s follows: Install a new entrance vestibule and install additional turnstiles and a metal detector at the entrance and 2 trucker cages inside the middle of warehouse. Add new lockers at existing locker area. Install two driver access cages inside the warehouse. Scope Also Includes associated electrical, conduit, patching, and finish work.

IssuedRemodelStorageJun 2026
$250K
FTW-PB26-09264
9449 SILVER CREEK RD, Fort Worth, TX 76108

Installation of pallet racking inside of an existing customer warehouse - no MEP. Specialty fire suppression scheme (in-rack sprinklers) being handled by sprinkler contractor separately.

IssuedRemodelStorageJun 2026
$310K
FTW-PB26-08790

Watch all construction in 76108 (Fort Worth)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Fort Worth?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.