TX240495 Northwest Crossing
13232 Northwest Fwy, Houston, TX, 07712
TX240495 Northwest Crossing is a new construction project at 13232 Northwest Fwy, Houston, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Jun 2027. The project has an estimated value of $600K across about 2,500 sq ft.
- Estimated project value
- $600K
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 2,500 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $240/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 10 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
43 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
4 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
312 days after the preceding date shown.
Source: TDLR filing
View source record
📰About TX240495 Northwest Crossing
Electrify America is constructing a new electric vehicle charging facility at 13232 Northwest Fwy in Houston. The project, filed with the Texas Department of Licensing and Regulation as TX240495 Northwest Crossing, involves the installation of dispensers and power units within an existing parking lot. The facility spans 2,500 square feet with an estimated cost of $600,000.
China Coast is the owner of record for this development in Harris County. Black & Veatch serves as the design firm, bringing experience to the project through six other TDLR-registered Electrify America facilities totaling $3,100,000. Michael Herman is the registered accessibility specialist for the construction.
The project utilizes public funds and is located on public land. TDLR completed the plan review in August 2026, and construction started in the same month. The work is scheduled to finish in June 2027. This timeline represents a 312-day build window, which is longer than the 219-day median for similar new construction projects in the county.
Financially, the project costs $240 per square foot, exceeding the county median of $88 per square foot for new construction. However, the total estimated cost of $600,000 is below the county median of $750,000. The site is in ZIP code 07712, where the U.S. Census estimates the median household income at $95,691 and the median owner-occupied home value at $578,300.
Black & Veatch has designed five other Electrify America projects in Texas, including locations in Austin, Fort Worth, Arlington, and another Houston site. This Houston project is one of several recent registrations by the firm. The construction status is under review complete, with physical work underway to install the necessary charging infrastructure.
Review Complete
Design review complete, construction may proceed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 07712 (Houston)
One email per change. Unsubscribe in one click. Privacy.
TX240495 Northwest Crossing is a New Construction project located at 13232 Northwest Fwy, Houston, TX 07712 in Houston, Texas. The project has an estimated value of $600K covering 2,500 sq ft. China Coast is the property owner and Black & Veatch is the design firm of record. The project was registered with TDLR on June 24, 2026.
Frequently Asked Questions
Is the Electrify America charging station open?
The TDLR record shows construction started in August 2026 and is scheduled to finish in June 2027. The filing does not confirm an opening date or current operational status.
Where is the new EV facility located?
The facility is at 13232 Northwest Fwy, Houston, TX 07712. It is being built in an existing parking lot in Harris County.
Who is building this project?
China Coast is the owner of record. Black & Veatch is the design firm, and Michael Herman is the registered accessibility specialist.
How much does the project cost?
The estimated cost is $600,000. This amounts to $240 per square foot for the 2,500 square foot facility.
When will construction be complete?
TDLR completed plan review in August 2026. Construction started in August 2026 and is scheduled to finish in June 2027.
What is TX240495 Northwest Crossing?
TX240495 Northwest Crossing is a new construction project at 13232 Northwest Fwy in Houston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Construct/Install new EV Charging facility to include dispenser and power units equipment. in existing parking lot
Is TX240495 Northwest Crossing open in Houston?
TX240495 Northwest Crossing is still under construction in Houston, TX, with an estimated completion of Jun 2027 according to its TDLR registration.
Where is TX240495 Northwest Crossing located?
TX240495 Northwest Crossing is located at 13232 Northwest Fwy, Houston, TX, 07712, in Harris County.
Who is the owner or developer of TX240495 Northwest Crossing?
China Coast is the property owner/developer of record for TX240495 Northwest Crossing, per its TDLR project registration.
Who is the architect or design firm for TX240495 Northwest Crossing?
Black & Veatch is the design firm of record for TX240495 Northwest Crossing, according to its TDLR filing.
How much does TX240495 Northwest Crossing cost and how big is it?
TX240495 Northwest Crossing has an estimated construction value of $600K and approximately 2,500 square feet (about $240/sqft), based on its TDLR filing.
Scope of Work
Construct/Install new EV Charging facility to include dispenser and power units equipment. in existing parking lot
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
13232 Northwest Fwy, Houston, TX, 07712
Related Projects
Watch all construction in 07712 (Houston)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Houston?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.