Additions to Gordon ISD Campus
112 Rusk Street, Gordon, TX, 76453
Additions to Gordon ISD Campus is a new construction project at 112 Rusk Street, Gordon, in Palo Pinto County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Aug 2027. The project has an estimated value of $3.8M across about 13,851 sq ft.
- Estimated project value
- $3.8M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 13,851 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $274/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 1 year
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
3 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
38 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
365 days after the preceding date shown.
Source: TDLR filing
View source record
📰About Additions to Gordon ISD Campus
Gordon Independent School District is constructing the New Fieldhouse & Baseball Field Dugouts - Gordon ISD Campus at 112 Rusk Street in Gordon, Texas. This new construction project covers 13,851 square feet with an estimated cost of $3,800,000. The work is targeted for August 2027, following a scheduled start date of August 2026.
The filing for this project is listed as Additions to Gordon ISD Campus. Harper Perkins Architects, Inc. serves as the design firm of record, and Sharlynn L Keys is the registered accessibility specialist. The project was registered with the Texas Department of Licensing and Regulation in June 2026. The scope specifically includes the fieldhouse and dugouts, while the baseball field itself is being handled through a separate owner contract.
Project Scale and Cost Context
The estimated cost of $3,800,000 places this project in the top quarter of new construction filings in Palo Pinto County. The county median estimated cost for similar projects is $750,000. The scheduled build window for this project is 365 days, which is longer than the county median of 210 days. The cost per square foot is calculated at $274, exceeding the county median of $172 per square foot.
Harper Perkins Architects, Inc. has six other TDLR-registered projects totaling $14,600,000. These include developments in Graham, Montague, Wichita Falls, and Saint Jo. Some of these projects are in review or registered status. The design firm’s portfolio demonstrates a consistent presence in regional institutional and educational construction.
Location and Community Data
The site is located in ZIP code 76453, which has a population of about 1,474 people according to U.S. Census estimates. The median household income in this area is $96,141, and the median owner-occupied home value is $322,700. This location in Palo Pinto County features predominantly owner-occupied housing with 927 total housing units.
Project Registered
Project has been registered with TDLR and is in pre-construction phase
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 76453 (Gordon)
One email per change. Unsubscribe in one click. Privacy.
Additions to Gordon ISD Campus is a New Construction project located at 112 Rusk Street, Gordon, TX 76453 in Gordon, Texas. The project has an estimated value of $3.8M covering 13,851 sq ft. Gordon Independent School District is the property owner and Harper Perkins Architects, Inc. is the design firm of record. The project was registered with TDLR on June 24, 2026.
Frequently Asked Questions
When is the Gordon ISD fieldhouse project scheduled to be completed?
The project is targeted for August 2027. Construction is scheduled to begin in August 2026, establishing a one-year build window for the new facility.
Who is the design firm for the new fieldhouse in Gordon?
Harper Perkins Architects, Inc. is the design firm of record. They are responsible for the architectural plans for the 13,851-square-foot facility.
Is the baseball field included in this specific TDLR filing?
No, the filing covers only the new fieldhouse and dugouts. The scope notes that the baseball field is being handled through a separate contract by the owner.
What is the estimated cost per square foot for this project?
The estimated cost is $274 per square foot. This figure is above the Palo Pinto County median of $172 per square foot for similar new construction filings.
What is Additions to Gordon ISD Campus?
Additions to Gordon ISD Campus is a new construction project at 112 Rusk Street in Gordon, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: A new 13,851 square foot New Fieldhouse & Dugouts (for a New Baseball Field - separate Contract through the Owner)
Is Additions to Gordon ISD Campus open in Gordon?
Additions to Gordon ISD Campus is still under construction in Gordon, TX, with an estimated completion of Aug 2027 according to its TDLR registration.
Where is Additions to Gordon ISD Campus located?
Additions to Gordon ISD Campus is located at 112 Rusk Street, Gordon, TX, 76453, in Palo Pinto County.
Who is the owner or developer of Additions to Gordon ISD Campus?
Gordon Independent School District is the property owner/developer of record for Additions to Gordon ISD Campus, per its TDLR project registration.
Who is the architect or design firm for Additions to Gordon ISD Campus?
Harper Perkins Architects, Inc. is the design firm of record for Additions to Gordon ISD Campus, according to its TDLR filing.
How much does Additions to Gordon ISD Campus cost and how big is it?
Additions to Gordon ISD Campus has an estimated construction value of $3.8M and approximately 13,851 square feet (about $274/sqft), based on its TDLR filing.
Scope of Work
A new 13,851 square foot New Fieldhouse & Dugouts (for a New Baseball Field - separate Contract through the Owner)
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
112 Rusk Street, Gordon, TX, 76453
Related Projects
Nearby Projects
Within 1 kmWatch all construction in 76453 (Gordon)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Gordon?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.