Funding type
This project involves public funds, public land, or is a Federally funded roadway project.
2022 Miscellaneous Street Reconstruction in Carrollton, TX
360 Cemetery Hill Road 3701 E Rosemeade Pkwy, Carrollton, TX 75007, Carrollton, TX 75006, Carrollton, TX, 75007
2022 Miscellaneous Street Reconstruction is a renovation/alteration project at 360 Cemetery Hill Road 3701 E Rosemeade Pkwy, Carrollton, TX 75007, Carrollton, TX 75006, Carrollton, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Nov 2026. The project has an estimated value of $4.2M across about 213,444 sq ft.
- Estimated project value
- $4.2M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 213,444 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $20/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 1 year
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Scheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
Source: TDLR filing
View source recordProject registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
207 days after the preceding date shown.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
41 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
116 days after the preceding date shown.
Source: TDLR filing
View source record
📰About 2022 Miscellaneous Street Reconstruction
The 2022 Miscellaneous Street Reconstruction is a $4,244,054 roadway and utility project spanning 213,444 square feet in Carrollton. This renovation and alteration effort covers two specific corridors: 360 Cemetery Hill Road and 3701 E Rosemeade Parkway. The project is registered with TDLR and is scheduled to finish in November 2026.
Construction for the 2022 Miscellaneous Street Reconstruction began in December 2025, creating a build window of 364 days. This duration is longer than the 92-day median scheduled build window for renovation and alteration filings in Dallas County. The total estimated cost places this project in the top quarter of similar filings in the county, exceeding the median estimated cost of $249,000.
Scope and Financial Context
The filing describes the work specifically as Roadway and Utility Reconstruction. The project involves public funds, public land, or is a Federally funded roadway project, confirming its municipal origin. The calculated cost per square foot is $20, which is below the county median of $72 per square foot for this project type.
Brandon Mark Quimbey is the registered accessibility specialist associated with this filing. TDLR completed the plan review in August 2026. The status on the record is Review Complete. This project is one of six other TDLR-registered projects for the City of Carrollton, which collectively total $17,650,000 in estimated costs.
Carrollton is located in Dallas County. The ZIP code 75007, which covers part of the project area, has a population of about 55,050 and a median household income of $109,692 according to U.S. Census ACS 2023 five-year estimates. The median owner-occupied home value in this area is $360,100. Dallas County unemployment was 3.3 percent in July 2026, a figure higher than a year earlier.
Review Complete
Design review complete, construction may proceed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 75007 (Carrollton)
One email per change. Unsubscribe in one click. Privacy.
2022 Miscellaneous Street Reconstruction is a Renovation/Alteration project located at 360 Cemetery Hill Road 3701 E Rosemeade Pkwy, Carrollton, TX 75007, Carrollton, TX 75006 in Carrollton, Texas. The project has an estimated value of $4.2M covering 213,444 sq ft. City of Carrollton is the property owner. The project was registered with TDLR on June 26, 2026.
Frequently Asked Questions
What is the primary scope of work for this project?
The filing specifies the scope as Roadway and Utility Reconstruction. This renovation and alteration project covers two addresses in Carrollton: 360 Cemetery Hill Road and 3701 E Rosemeade Parkway.
Who is the owner of record for this reconstruction?
The City of Carrollton is the owner and developer of record. The project involves public funds, public land, or is a Federally funded roadway project.
What is the estimated cost and size of the project?
The estimated cost is $4,244,054. The project covers 213,444 square feet, resulting in a computed cost of $20 per square foot.
When did construction start and when is it scheduled to finish?
Construction started in December 2025. The project is scheduled to finish in November 2026, creating a build window of 364 days.
Who is the registered accessibility specialist for this filing?
Brandon Mark Quimbey is the registered accessibility specialist listed on the TDLR filing for this Carrollton project.
What is 2022 Miscellaneous Street Reconstruction?
2022 Miscellaneous Street Reconstruction is a renovation/alteration project at 360 Cemetery Hill Road 3701 E Rosemeade Pkwy, Carrollton, TX 75007, Carrollton, TX 75006 in Carrollton, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Roadway and Utility Reconstruction
Is 2022 Miscellaneous Street Reconstruction open in Carrollton?
2022 Miscellaneous Street Reconstruction is still under construction in Carrollton, TX, with an estimated completion of Nov 2026 according to its TDLR registration.
Where is 2022 Miscellaneous Street Reconstruction located?
2022 Miscellaneous Street Reconstruction is located at 360 Cemetery Hill Road 3701 E Rosemeade Pkwy, Carrollton, TX 75007, Carrollton, TX 75006, Carrollton, TX, 75007, in Dallas County.
Who is the owner or developer of 2022 Miscellaneous Street Reconstruction?
City of Carrollton is the property owner/developer of record for 2022 Miscellaneous Street Reconstruction, per its TDLR project registration.
How much does 2022 Miscellaneous Street Reconstruction cost and how big is it?
2022 Miscellaneous Street Reconstruction has an estimated construction value of $4.2M and approximately 213,444 square feet (about $20/sqft), based on its TDLR filing.
Scope of Work
Roadway and Utility Reconstruction
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
360 Cemetery Hill Road 3701 E Rosemeade Pkwy, Carrollton, TX 75007, Carrollton, TX 75006, Carrollton, TX, 75007
Explore the supplied address
A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.
Related Projects
Watch all construction in 75007 (Carrollton)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Carrollton?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.