Project intelligenceTDLR TABS2026024071Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Lake Travis Fire Rescue Training Facility

4800 Doss Rd, Austin, TX, 78734

Opening ~Nov 2027Review Complete

Lake Travis Fire Rescue Training Facility is a renovation/alteration project at 4800 Doss Rd, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Nov 2027. The project has an estimated value of $3.1M across about 8,096 sq ft.

Estimated project value
$3.1M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
8,096 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$383/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1 year
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Jun 29, 2026490 days across supplied datesNov 1, 2027

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    50 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    76 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    364 days after the preceding date shown.

    Source: TDLR filing

    View source record

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 78734 (Austin)

One email per change. Unsubscribe in one click. Privacy.

Lake Travis Fire Rescue Training Facility is a Renovation/Alteration project located at 4800 Doss Rd, Austin, TX 78734 in Austin, Texas. The project has an estimated value of $3.1M covering 8,096 sq ft. Travis County ESD No.6 - Lake Travis Fire Rescue is the property owner and EIKON Consulting Group is the design firm of record. The project was registered with TDLR on June 29, 2026.

Frequently Asked Questions

What is Lake Travis Fire Rescue Training Facility?

Lake Travis Fire Rescue Training Facility is a renovation/alteration project at 4800 Doss Rd in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Existing Metal Building, ReSheet and Roof and Remodel Entire Interior

Is Lake Travis Fire Rescue Training Facility open in Austin?

Lake Travis Fire Rescue Training Facility is still under construction in Austin, TX, with an estimated completion of Nov 2027 according to its TDLR registration.

Where is Lake Travis Fire Rescue Training Facility located?

Lake Travis Fire Rescue Training Facility is located at 4800 Doss Rd, Austin, TX, 78734, in Travis County.

Who is the owner or developer of Lake Travis Fire Rescue Training Facility?

Travis County ESD No.6 - Lake Travis Fire Rescue is the property owner/developer of record for Lake Travis Fire Rescue Training Facility, per its TDLR project registration.

Who is the architect or design firm for Lake Travis Fire Rescue Training Facility?

EIKON Consulting Group is the design firm of record for Lake Travis Fire Rescue Training Facility, according to its TDLR filing.

How much does Lake Travis Fire Rescue Training Facility cost and how big is it?

Lake Travis Fire Rescue Training Facility has an estimated construction value of $3.1M and approximately 8,096 square feet (about $383/sqft), based on its TDLR filing.

Scope of Work

Existing Metal Building, ReSheet and Roof and Remodel Entire Interior

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

4800 Doss Rd, Austin, TX, 78734

Location by street address

Watch all construction in 78734 (Austin)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.