Project intelligenceTDLR TABS2026024233Renovation/Alteration
Funding type

This project is privately funded, on private land for private use.

Estek Solar

309 ALDINE BENDER ROAD, BLDG 1, Unit 100, Houston, TX, 77060

Opening ~May 2027Review Complete

Estek Solar is a renovation/alteration project at 309 ALDINE BENDER ROAD, BLDG 1, Unit 100, Houston, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion May 2027. The project has an estimated value of $1.0M across about 23,000 sq ft.

Estimated project value
$1.0M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
23,000 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$43/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
6 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Jul 1, 2026334 days across supplied datesMay 31, 2027

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    36 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    117 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    181 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About Estek Solar

Estek Solar is executing a $1,000,000 interior build-out at 309 Aldine Bender Road in Houston, Texas. The project involves a 23,000 square foot renovation within Building A, Unit 100 of the Imperial Valley Distribute Center. This work is classified as a renovation and alteration, specifically designed to separate different working areas within the existing industrial space. The filing notes that the project is privately funded by the tenant, correcting a previous registration error.

Project Scope and Financials

The estimated cost of $1,000,000 places this project above the Harris County median for similar renovation and alteration filings, which stands at $250,000. Despite the higher total cost, the estimated cost per square foot is $43, which is below the county median of $80 per square foot. The scheduled build window is 181 days, longer than the county median of 92 days for comparable work. TTPRO Inc. is the design firm of record for this project, while Imperial Houston Industrial LP is listed as the owner and developer of record.

Construction is scheduled to start in December 2026 and is scheduled to finish in May 2027. TDLR completed the plan review process in August 2026, and the project status is marked as Review Complete. The registered accessibility specialist for this filing is Tim Mullins. This location is in Harris County, within the ZIP code 77060, which has a population of about 44,920 according to U.S. Census estimates.

Context and Comparables

Imperial Houston Industrial LP has two other TDLR-registered projects in Houston, totaling $790,436, including work on Imperial Valley Industrial Park Buildings 1 and 2. TTPRO Inc. has six other registered projects totaling $1,194,320, with locations in Katy, Missouri City, and Houston. City of Houston permit records show two building permits issued at this street address between June and July 2026, with the most recent covering a 107,660 square foot factory build-out. Import data from third-party sources like ImportYeti and ImportGenius lists Estek Solar Energy at this specific Houston address, confirming their operational presence in the area.

The local labor market in Harris County shows an unemployment rate of 5.4 percent which is higher than a year earlier. The area profile for ZIP 77060 indicates a median household income of $37,843 and a median owner-occupied home value of $144,900. Housing in this area is predominantly renter-occupied. This project represents a significant private investment in industrial infrastructure, distinct from residential or commercial retail developments.

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 77060 (Houston)

One email per change. Unsubscribe in one click. Privacy.

Estek Solar is a Renovation/Alteration project located at 309 ALDINE BENDER ROAD, BLDG 1, Unit 100, Houston, TX 77060 in Houston, Texas. The project has an estimated value of $1.0M covering 23,000 sq ft. IMPERIAL HOUSTON INDUSTRIAL LP is the property owner and TTPRO Inc. is the design firm of record. The project was registered with TDLR on July 1, 2026.

Frequently Asked Questions

What is the current status of the Estek Solar project?

TDLR completed plan review in August 2026. Construction is scheduled to start in December 2026 and is scheduled to finish in May 2027. The project status is listed as Review Complete.

How much does the Estek Solar build-out cost?

The estimated cost is $1,000,000. This is above the Harris County median for renovation projects but has a lower cost per square foot than the county average.

Who is the developer for this project?

Imperial Houston Industrial LP is the owner and developer of record. TTPRO Inc. is the design firm of record for the 23,000 square foot interior build-out.

Is the Estek Solar facility open for business?

The TDLR record covers construction status only. It does not confirm business opening dates. Third-party import records list Estek Solar Energy at this address, but construction completion is scheduled for May 2027.

Where is the Estek Solar project located?

The project is located at 309 Aldine Bender Road, Building A, Unit 100, in Houston, Texas 77060. It is part of the Imperial Valley Distribute Center in Harris County.

What is Estek Solar?

Estek Solar is a renovation/alteration project at 309 ALDINE BENDER ROAD, BLDG 1, Unit 100 in Houston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior build out to separate different working area. Privately Funded By Tenant Registered Incorrectly

Is Estek Solar open in Houston?

Estek Solar is still under construction in Houston, TX, with an estimated completion of May 2027 according to its TDLR registration.

Where is Estek Solar located?

Estek Solar is located at 309 ALDINE BENDER ROAD, BLDG 1, Unit 100, Houston, TX, 77060, in Harris County.

Who is the owner or developer of Estek Solar?

IMPERIAL HOUSTON INDUSTRIAL LP is the property owner/developer of record for Estek Solar, per its TDLR project registration.

Who is the architect or design firm for Estek Solar?

TTPRO Inc. is the design firm of record for Estek Solar, according to its TDLR filing.

How much does Estek Solar cost and how big is it?

Estek Solar has an estimated construction value of $1.0M and approximately 23,000 square feet (about $43/sqft), based on its TDLR filing.

Scope of Work

Interior build out to separate different working area. Privately Funded By Tenant Registered Incorrectly

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

309 ALDINE BENDER ROAD, BLDG 1, Unit 100, Houston, TX, 77060

Location by street address

Related City Permits

Building permits found at or near this location

309 ALDINE BENDER RD 1-100, Houston, TX 77060

107,660 SF. FACTORY BUILDOUT 1-1-2-S2/B/F2-B 2021 IBC 100% NFPA 13

IssuedBuilding PmtJul 2026
HOU-26031549-BUILDINGPMT
309 ALDINE BENDER RD 2-200, Houston, TX 77060

1ST BUILD-OUT 112,710 S/F OFFCE / WHSE 1-1-2-S1/B-B SP/FA '21 IBC

IssuedBuilding PmtJun 2026
HOU-26032806-BUILDINGPMT

Watch all construction in 77060 (Houston)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.