Repurpose Frenship Middle School in Wolfforth, TX
500 Main Street, Wolfforth, TX, 79382
Repurpose Frenship Middle School is a renovation/alteration project at 500 Main Street, Wolfforth, in Lubbock County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Dec 2027. The project has an estimated value of $15.2M across about 90,000 sq ft.
- Estimated project value
- $15.2M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 90,000 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $169/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 1y 4mo
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
45 days after the preceding date shown.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
3 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
487 days after the preceding date shown.
Source: TDLR filing
View source record
📰About Repurpose Frenship Middle School
The Repurpose Frenship Middle School project is a $15,200,000 renovation and alteration of the existing facility at 500 Main Street in Wolfforth, Texas. This 90,000 sq ft effort is scheduled to finish in December 2027, with construction work beginning in August 2026. The project is registered with TDLR and falls under the jurisdiction of Lubbock County.
Frenship Independent School District is the owner of record for this significant upgrade. The scope of work targets three specific areas within the school. The old gymnasium is being converted into a dedicated event center space. The existing auditorium is receiving finish upgrades to modernize the facility. Additionally, classroom and office spaces are being renovated to better meet the operational needs of the district.
Parkhill serves as the design firm of record for this project. The estimated cost of $169 per square foot places this renovation above the Lubbock County median for similar renovation and alteration filings, which stands at $100 per square foot. The total estimated cost is also above the county median of $300,000 for this project type, indicating a substantial investment in educational infrastructure.
The scheduled build window for this project is 490 days. This timeline is longer than the county median of 123 days for renovation and alteration projects registered in Lubbock County. TDLR completed the plan review process in August 2026, clearing the way for the construction phase to commence as planned.
Wolfforth is a community in Lubbock County with a population of approximately 10,300 people according to U.S. Census estimates for the 79382 ZIP code. The median household income in this area is $80,625, and the median owner-occupied home value is $245,100. This project represents a major development for the local school district and community.
Project Status and Details
The TDLR status for this project is Review Complete. Stephen D Macphie is the registered accessibility specialist for this filing. The project involves public funds and public land, ensuring it serves the educational needs of the Wolfforth community.
Regional Context
Frenship Independent School District has six other TDLR-registered projects totaling $196,470,000 in the region. Parkhill, the design firm, has six other projects totaling $23,421,224 in various Texas locations. This project fits within a broader pattern of development in the Lubbock area.
Review Complete
Design review complete, construction may proceed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 79382 (Wolfforth)
One email per change. Unsubscribe in one click. Privacy.
Repurpose Frenship Middle School is a Renovation/Alteration project located at 500 Main Street, Wolfforth, TX 79382 in Wolfforth, Texas. The project has an estimated value of $15.2M covering 90,000 sq ft. Frenship Independent School District is the property owner and Parkhill is the design firm of record. The project was registered with TDLR on July 13, 2026.
Frequently Asked Questions
When is the Frenship Middle School renovation scheduled to finish?
The project is scheduled to finish in December 2027, with construction starting in August 2026. TDLR completed plan review in August 2026.
Who is the design firm for the Frenship Middle School project?
Parkhill is the design firm of record for this renovation and alteration project in Wolfforth, Texas.
What is the estimated cost of the Frenship Middle School renovation?
The estimated cost is $15,200,000. This is above the Lubbock County median for similar renovation projects.
Is the Frenship Middle School project open to the public?
The project is under construction and scheduled to finish in December 2027. It is not yet open for public use.
Who is the owner of the Frenship Middle School project?
Frenship Independent School District is the owner and developer of record for this project in Wolfforth, Texas.
What is Repurpose Frenship Middle School?
Repurpose Frenship Middle School is a renovation/alteration project at 500 Main Street in Wolfforth, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Renovations to 3 areas: renovating old gym to event center space, finish upgrades to existing auditorium, classroom and office space renovated to meet needs of district.
Is Repurpose Frenship Middle School open in Wolfforth?
Repurpose Frenship Middle School is still under construction in Wolfforth, TX, with an estimated completion of Dec 2027 according to its TDLR registration.
Where is Repurpose Frenship Middle School located?
Repurpose Frenship Middle School is located at 500 Main Street, Wolfforth, TX, 79382, in Lubbock County.
Who is the owner or developer of Repurpose Frenship Middle School?
Frenship Independent School District is the property owner/developer of record for Repurpose Frenship Middle School, per its TDLR project registration.
Who is the architect or design firm for Repurpose Frenship Middle School?
Parkhill is the design firm of record for Repurpose Frenship Middle School, according to its TDLR filing.
How much does Repurpose Frenship Middle School cost and how big is it?
Repurpose Frenship Middle School has an estimated construction value of $15.2M and approximately 90,000 square feet (about $169/sqft), based on its TDLR filing.
Scope of Work
Renovations to 3 areas: renovating old gym to event center space, finish upgrades to existing auditorium, classroom and office space renovated to meet needs of district.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
500 Main Street, Wolfforth, TX, 79382
Explore the supplied address
A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.
Related Projects
Same Owner
$355.5M totalWatch all construction in 79382 (Wolfforth)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Wolfforth?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.