Funding type
This project is privately funded, on private land for private use.
Jones Hall Phase III in Denton, TX
604 Administration Dr, Denton, TX, 76201
Jones Hall Phase III is a renovation/alteration project at 604 Administration Dr, Denton, in Denton County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Jun 2027. The project has an estimated value of $5.5M across about 11,385 sq ft.
- Estimated project value
- $5.5M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 11,385 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $483/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 10 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
33 days after the preceding date shown.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
43 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
260 days after the preceding date shown.
Source: TDLR filing
View source record
📰About Jones Hall Phase III
Construction is scheduled to finish in June 2027 for the $5,500,000 renovation of Jones Hall at 604 Administration Dr in Denton. The project, filed as Jones Hall Phase III, covers 11,385 sq ft of interior and exterior work for Texas Woman's University. Work started in August 2026 following plan review completion in September 2026. The TDLR status is Review Complete, confirming the regulatory groundwork for this significant campus improvement is finalized.
Scope and Design
The scope of work includes interior renovations to Level one East Wing and Level two West wing. Exterior work involves E.J. repair, minor site repair, and a handful of misc exterior cladding repairs. VLK is the design firm of record for this renovation and alteration project. The registered accessibility specialist for the filing is Bonita L Anderson, ensuring the project meets state standards for accessibility during the renovation process.
At $483 per square foot, the estimated cost is above the county median of $80 per square foot for similar renovation and alteration filings in Denton County. The scheduled build window of 303 days is longer than the county median of 92 days for this project type. This indicates a complex scope of work that extends beyond typical minor alterations, reflecting the comprehensive nature of the interior and exterior upgrades planned for the facility.
Owner and Context
Texas Woman's University is the owner of record. The university has six other TDLR-registered projects totaling $11,714,973, including the Multipurpose Classroom Laboratory and the Fitness Trails Pavilion. VLK, the design firm, has six other registered projects totaling $76,046,875, including The Rider in Stephenville and Deerpark Middle School in Austin. Third-party bid announcements, such as those listed on Light RFP Marketplace, describe the project as full design-build construction for this institutional building.
The site is located in ZIP code 76201, where the U.S. Census estimates a population of about 29,832 and a median household income of $37,863. The project is privately funded on private land for private use. Denton County unemployment rate was 4.3 percent in July 2026, higher than a year earlier, reflecting the local labor market conditions during this construction period.
Review Complete
Design review complete, construction may proceed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 76201 (Denton)
One email per change. Unsubscribe in one click. Privacy.
Jones Hall Phase III is a Renovation/Alteration project located at 604 Administration Dr, Denton, TX 76201 in Denton, Texas. The project has an estimated value of $5.5M covering 11,385 sq ft. Texas Woman's University is the property owner and VLK is the design firm of record. The project was registered with TDLR on July 15, 2026.
Frequently Asked Questions
Is Jones Hall open for public use?
The TDLR record indicates construction is scheduled to finish in June 2027. There is no information in the provided facts confirming the building is open for public use or operations.
Who is the design firm for Jones Hall Phase III?
VLK is the design firm of record for the Jones Hall Phase III renovation project at 604 Administration Dr in Denton, Texas.
What is the estimated cost of the Jones Hall renovation?
The estimated cost for the Jones Hall Phase III renovation is $5,500,000. This figure is above the county median for renovation and alteration projects in Denton County.
When did construction start on Jones Hall?
Construction started in August 2026. TDLR completed plan review in September 2026, and the project is scheduled to finish in June 2027.
Is the Jones Hall site in a flood zone?
It is located in flood zone X according to the FEMA National Flood Hazard Layer.
What is Jones Hall Phase III?
Jones Hall Phase III is a renovation/alteration project at 604 Administration Dr in Denton, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior renovations to Level one East Wing and Level two West wing, Exterior E.J. repair, minor site repair work, handful of misc exterior cladding repairs
Is Jones Hall Phase III open in Denton?
Jones Hall Phase III is still under construction in Denton, TX, with an estimated completion of Jun 2027 according to its TDLR registration.
Where is Jones Hall Phase III located?
Jones Hall Phase III is located at 604 Administration Dr, Denton, TX, 76201, in Denton County.
Who is the owner or developer of Jones Hall Phase III?
Texas Woman's University is the property owner/developer of record for Jones Hall Phase III, per its TDLR project registration.
Who is the architect or design firm for Jones Hall Phase III?
VLK is the design firm of record for Jones Hall Phase III, according to its TDLR filing.
How much does Jones Hall Phase III cost and how big is it?
Jones Hall Phase III has an estimated construction value of $5.5M and approximately 11,385 square feet (about $483/sqft), based on its TDLR filing.
Scope of Work
Interior renovations to Level one East Wing and Level two West wing, Exterior E.J. repair, minor site repair work, handful of misc exterior cladding repairs
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
604 Administration Dr, Denton, TX, 76201
Explore the supplied address
A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.
Related Projects
Same Owner
$7.6M totalWatch all construction in 76201 (Denton)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Denton?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.