Funding type
This project is privately funded, on private land for private use.
Project in Houston, TX
12550 Timber Forest Drive, Houston, TX, 77044
Project is a new construction project at 12550 Timber Forest Drive, Houston, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Jun 2027. The project has an estimated value of $9.0M across about 14,783 sq ft.
- Estimated project value
- $9.0M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 14,783 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $609/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 1 year
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Scheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
Source: TDLR filing
View source recordProject registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
15 days after the preceding date shown.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
22 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
327 days after the preceding date shown.
Source: TDLR filing
View source record
📰About Project
Project Houston is the designated name for a new 14,783 sq ft facility at 12550 Timber Forest Drive in Houston, Texas. The project, identified in TDLR records as Small Molecule Utility Building 22, is a private construction effort valued at $9,000,000. This new build is part of a broader portfolio of pharmaceutical infrastructure Eli Lilly and Company is developing in the region.
The scope of work for Project Houston covers the shell building package, which includes the building envelope, primary structural framing, and interior stairs. Jacobs serves as the design firm of record for this project. The estimated cost of $609 per square foot places this development above the Harris County median for new construction filings, reflecting the specialized nature of the utility functions being built.
Timeline and Status
Construction on the site began in July 2026. TDLR completed the plan review process in August 2026, confirming that the project is scheduled to finish in June 2027. The registration status is listed as Review Complete. This timeline represents a 364-day build window, which is longer than the 219-day median scheduled build window for similar new construction projects in Harris County over the last 24 months.
The site is located in Harris County, specifically within the 77044 ZIP code area. Census estimates for this ZIP code indicate a population of approximately 55,746 residents. The area is predominantly owner-occupied, with a median household income of $92,416.
Eli Lilly and Company has four other TDLR-registered projects in Houston, with a combined value of $369,000,000. These include the Oligo Manufacturing Building 11, Small Molecule Headblock Building 20, Oligo Headblock Building 10, and Small Molecule Manufacturing Building 21. All of these related projects have also completed their review processes. This concentration of investment highlights the company’s significant expansion of its manufacturing and utility infrastructure in the Houston area.
Review Complete
Design review complete, construction may proceed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 77044 (Houston)
One email per change. Unsubscribe in one click. Privacy.
Project is a New Construction project located at 12550 Timber Forest Drive,, Houston, TX 77044 in Houston, Texas. The project has an estimated value of $9.0M covering 14,783 sq ft. Eli Lilly and Company is the property owner and Jacobs is the design firm of record. The project was registered with TDLR on July 16, 2026.
Frequently Asked Questions
Is Project Houston open for business?
The TDLR record indicates this is a construction project with a scheduled finish date of June 2027. It is a new building under construction, not an established operating facility.
Who is the owner of the building at 12550 Timber Forest Drive?
The owner of record for this new construction project is Eli Lilly and Company. The facility is privately funded and located on private land for private use.
What is the total square footage of the new utility building?
The facility is 14,783 sq ft. The scope of work includes the building envelope, primary structural framing, and interior stairs.
What is the estimated cost per square foot?
The estimated cost is $609 per square foot. This figure is above the Harris County median of $88 per square foot for new construction filings.
When is construction expected to be completed?
Construction started in July 2026 and is scheduled to finish in June 2027. TDLR completed the plan review in August 2026.
What is Project?
Project is a new construction project at 12550 Timber Forest Drive in Houston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Shell building package includes building envelope, primary structural framing, and interior stairs.
Is Project open in Houston?
Project is still under construction in Houston, TX, with an estimated completion of Jun 2027 according to its TDLR registration.
Where is Project located?
Project is located at 12550 Timber Forest Drive, Houston, TX, 77044, in Harris County.
Who is the owner or developer of Project?
Eli Lilly and Company is the property owner/developer of record for Project, per its TDLR project registration.
Who is the architect or design firm for Project?
Jacobs is the design firm of record for Project, according to its TDLR filing.
How much does Project cost and how big is it?
Project has an estimated construction value of $9.0M and approximately 14,783 square feet (about $609/sqft), based on its TDLR filing.
Scope of Work
Shell building package includes building envelope, primary structural framing, and interior stairs.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
12550 Timber Forest Drive, Houston, TX, 77044
Related Projects
Same Owner
$483.0M totalNearby Projects
Within 0.6 miWatch all construction in 77044 (Houston)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Houston?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.