Funding type
This project is privately funded, on private land for private use.
D.R. Horton Houston North Division Office in Spring, TX
1525 Sawdust Road, Spring, TX, 77380
D.R. Horton Houston North Division Office is a new construction project at 1525 Sawdust Road, Spring, in Montgomery County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Nov 2027. The project has an estimated value of $25.0M across about 71,000 sq ft.
- Estimated project value
- $25.0M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 71,000 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $352/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 1y 2mo
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
77 days after the preceding date shown.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
5 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
420 days after the preceding date shown.
Source: TDLR filing
View source record
📰About D.R. Horton Houston North Division Office
D.R. Horton Houston North Division Office is a new 4-story facility rising at 1525 Sawdust Road in Spring, Texas. The project encompasses a 71,000 square foot office building, a dedicated maintenance structure, and a pavilion. This development is privately funded and situated on private land within Montgomery County. The estimated cost for this construction is $25,000,000.
The design firm of record is Strand Systems Engineering, Inc., which has also handled the D.R. Horton Office in Salado. Marcela Abadi Rhoads is the registered accessibility specialist for this project. The filing indicates that TDLR completed plan review in October 2026. Construction is scheduled to finish in November 2027, with work starting October 2026.
Project Scale and Cost Context
The estimated cost of $25,000,000 places this project above the median estimated cost for new construction filings in Montgomery County. The median cost for similar filings in the county is $800,000. The cost per square foot for this project is $352, which is above the county median of $100 per square foot. The scheduled build window of 425 days is longer than the county median of 212 days.
This geographic detail provides context for the construction environment in Spring. The project is part of a broader development strategy by D.R. Horton Texas Ltd, which is the owner of record. The scale of the office building reflects a significant investment in regional operations.
Local demographics in the 77380 ZIP code show a population of about 31,151 people. The median household income is estimated at $84,468. These Census estimates provide background on the community surrounding the new office. The project contributes to the commercial landscape of Montgomery County, where the unemployment rate was 4.9 percent in June 2026.
Review Complete
Design review complete, construction may proceed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 77380 (Spring)
One email per change. Unsubscribe in one click. Privacy.
D.R. Horton Houston North Division Office is a New Construction project located at 1525 Sawdust Road, Spring, TX 77380 in Spring, Texas. The project has an estimated value of $25.0M covering 71,000 sq ft. DR Horton Texas Ltd is the property owner and Strand Systems Engineering, Inc. is the design firm of record. The project was registered with TDLR on July 16, 2026.
Frequently Asked Questions
What is the total size of the new office building?
The office building is 71,000 square feet. The project also includes a maintenance building and a pavilion.
Who is the design firm for this project?
Strand Systems Engineering, Inc. is the design firm of record. They are also the design firm for the D.R. Horton Office in Salado.
What is the estimated cost per square foot?
The estimated cost per square foot is $352. This is above the county median of $100 per square foot.
When is the construction scheduled to end?
Construction is scheduled to finish in November 2027. Work started in October 2026.
What is D.R. Horton Houston North Division Office?
D.R. Horton Houston North Division Office is a new construction project at 1525 Sawdust Road in Spring, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: The project features a 4-story ~71,000 SF office building, maintenance building, and pavilion.
Is D.R. Horton Houston North Division Office open in Spring?
D.R. Horton Houston North Division Office is still under construction in Spring, TX, with an estimated completion of Nov 2027 according to its TDLR registration.
Where is D.R. Horton Houston North Division Office located?
D.R. Horton Houston North Division Office is located at 1525 Sawdust Road, Spring, TX, 77380, in Montgomery County.
Who is the owner or developer of D.R. Horton Houston North Division Office?
DR Horton Texas Ltd is the property owner/developer of record for D.R. Horton Houston North Division Office, per its TDLR project registration.
Who is the architect or design firm for D.R. Horton Houston North Division Office?
Strand Systems Engineering, Inc. is the design firm of record for D.R. Horton Houston North Division Office, according to its TDLR filing.
How much does D.R. Horton Houston North Division Office cost and how big is it?
D.R. Horton Houston North Division Office has an estimated construction value of $25.0M and approximately 71,000 square feet (about $352/sqft), based on its TDLR filing.
Scope of Work
The project features a 4-story ~71,000 SF office building, maintenance building, and pavilion.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
1525 Sawdust Road, Spring, TX, 77380
Explore the supplied address
A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.
Related Projects
Same Design Firm
$33.0M totalWatch all construction in 77380 (Spring)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Spring?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.