Project intelligenceTDLR TABS2026025657Renovation/Alteration
Funding type

This project is privately funded, on private land for private use.

25123 - Make Ready

1160 Mustang Drive Suite 150, Dallas, TX, 75261

Opening ~Nov 2026Review Complete

25123 - Make Ready is a renovation/alteration project at 1160 Mustang Drive Suite 150, Dallas, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Nov 2026. The project has an estimated value of $260K across about 16,053 sq ft.

Estimated project value
$260K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
16,053 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$16/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
3 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

Explore the linked construction record and source history

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Jul 20, 2026133 days across supplied datesNov 30, 2026

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    17 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    26 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    90 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About 25123 - Make Ready

The City of Dallas/DFW Airport Division is renovating a 16,053 sq ft warehouse and office at 1160 Mustang Drive Suite 150 in Dallas. This alteration project is estimated at $260,000, translating to a cost of $16 per square foot.

RGA Architects Inc. serves as the design firm of record for this renovation. The registered accessibility specialist is Clinton L Coultas. The project is privately funded on private land for private use, despite the owner being a municipal division. TDLR completed plan review in August 2026, and construction is scheduled to finish in November 2026, with work starting September 2026.

Project Scale and Cost Context

Among 32,457 TDLR-registered renovation and alteration filings in Dallas County, this project’s estimated cost of $260,000 is close to the county median of $249,000. The median size for such projects is 4,226 sq ft, making this 16,053 sq ft facility significantly larger than the typical filing. The $16 per square foot cost is below the county median of $72 per square foot for comparable work.

The scheduled build window for this project is 90 days, which is close to the county median of 92 days. This timeline aligns with the start date of September 2026 and the completion target of November 2026. The project status is Review Complete, indicating that the design phase has been approved by TDLR.

Owner and Design Firm History

The City of Dallas/DFW Airport Division has six other TDLR-registered projects totaling $2,855,000. These include renovations at Terminal C and Terminal D of DFW Airport, as well as a project in Dallas designated as 25123 - Erik’s. RGA Architects Inc. has six other registered projects totaling $58,832,142, including large-scale developments in Haslet, McKinney, and Ponder. This indicates a pattern of significant construction activity by both the owner and the design firm.

Dallas County’s unemployment rate was 3.3 percent in July 2026, higher than a year earlier. This labor market context provides a backdrop for the construction workforce availability during the September to November 2026 build window. The project remains a specific renovation of an existing structure rather than new construction.

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 75261 (Dallas)

One email per change. Unsubscribe in one click. Privacy.

25123 - Make Ready is a Renovation/Alteration project located at 1160 Mustang Drive Suite 150, Dallas, TX 75261 in Dallas, Texas. The project has an estimated value of $260K covering 16,053 sq ft. City of Dallas/DFW Airport Division is the property owner and RGA Architects Inc. is the design firm of record. The project was registered with TDLR on July 20, 2026.

Frequently Asked Questions

What is the scope of work for this project?

The scope is the renovation of a 16,053 sq ft warehouse and office at 1160 Mustang Drive Suite 150 in Dallas.

When is construction scheduled to finish?

Construction is scheduled to finish in November 2026, with work starting in September 2026.

Is the business open?

The TDLR record indicates construction is scheduled to finish in November 2026. There is no information confirming the business is open or operating.

What is 25123 - Make Ready?

25123 - Make Ready is a renovation/alteration project at 1160 Mustang Drive Suite 150 in Dallas, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Renovation of a 16,053 sf warehouse and office

Is 25123 - Make Ready open in Dallas?

25123 - Make Ready is still under construction in Dallas, TX, with an estimated completion of Nov 2026 according to its TDLR registration.

Where is 25123 - Make Ready located?

25123 - Make Ready is located at 1160 Mustang Drive Suite 150, Dallas, TX, 75261, in Dallas County.

Who is the owner or developer of 25123 - Make Ready?

City of Dallas/DFW Airport Division is the property owner/developer of record for 25123 - Make Ready, per its TDLR project registration.

Who is the architect or design firm for 25123 - Make Ready?

RGA Architects Inc. is the design firm of record for 25123 - Make Ready, according to its TDLR filing.

How much does 25123 - Make Ready cost and how big is it?

25123 - Make Ready has an estimated construction value of $260K and approximately 16,053 square feet (about $16/sqft), based on its TDLR filing.

Scope of Work

Renovation of a 16,053 sf warehouse and office

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

1160 Mustang Drive Suite 150, Dallas, TX, 75261

32.91689, -97.07772

Watch all construction in 75261 (Dallas)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.