Project intelligenceTDLR TABS2026025772Renovation/Alteration
Funding type

This project is privately funded, on private land for private use.

BCEI Finish Out

5615 S FM 973 Rd Ste 960, Del Valle, TX, 78616

Opening ~Dec 2027Review Complete

BCEI Finish Out is a renovation/alteration project at 5615 S FM 973 Rd Ste 960, Del Valle, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Dec 2027. The project has an estimated value of $113K across about 1,116 sq ft.

Estimated project value
$113K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
1,116 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$101/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1y 4mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Jul 21, 2026498 days across supplied datesDec 1, 2027

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    13 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    4 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    481 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About BCEI Finish Out

The Hangars industrial park in Del Valle is undergoing a specific interior renovation at Suite 960, located at 5615 S FM 973 Rd. This project, filed under the name BCEI Finish Out, involves a 1,116 sq ft renovation and alteration of existing space. The work is privately funded on private land and is scheduled to finish in December 2027. Construction began in August 2026, following the completion of TDLR plan review in the same month.

The scope of work focuses on functional updates to the interior environment. The filing specifies a finish-out of the break room and showers, along with an upgrade to interior lighting. Additionally, the project includes modifications to the fork lift ramp. These changes are designed to improve the usability and safety of the workspace for the occupants of the Hangars facility.

Project Details and Design

Holder +Southwick Architects serves as the design firm of record for this renovation. The registered accessibility specialist is Robert W Green. The owner of record is HPF OZ Holdings, LP. The estimated cost for this specific suite renovation is $112,537, which calculates to a cost of $101 per square foot. This figure is close to the Travis County median of $103 per square foot for similar renovation and alteration filings.

Context from U.S. Census American Community Survey 2023 five-year estimates for ZIP code 78616 indicates a population of about 10,008 people. The median household income in this area is $70,148. There are 3,165 housing units, with a median owner-occupied home value of $174,800. The housing stock in this Del Valle area is predominantly owner-occupied.

Third-party sources provide additional context about the property. A profile on kbcadvisors.com describes The Hangars as being located in a thriving industrial submarket within Austin. Holder +Southwick, the design firm, lists the Hangars Industrial park in Del Valle on their website. An Instagram post describes the site as a nine-building flex industrial park completed in 2025, noting it was built on a landfill. The site is for sale or lease according to that social media mention.

The TDLR status for this project is Review Complete. The scheduled build window of 485 days is longer than the Travis County median of 98 days for renovation and alteration projects. The estimated cost is below the county median of $297,000 for similar filings.

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 78616 (Del Valle)

One email per change. Unsubscribe in one click. Privacy.

BCEI Finish Out is a Renovation/Alteration project located at 5615 S FM 973 Rd Ste 960, Del Valle, TX 78616 in Del Valle, Texas. The project has an estimated value of $113K covering 1,116 sq ft. HPF OZ Holdings, LP is the property owner and Holder +Southwick Architects is the design firm of record. The project was registered with TDLR on July 21, 2026.

Frequently Asked Questions

What is being renovated at The Hangars in Del Valle?

The renovation includes a finish-out of the break room and showers, an upgrade to interior lighting, and modifications to the fork lift ramp. This work is part of a 1,116 sq ft interior alteration project.

Who is the owner and design firm for this project?

HPF OZ Holdings, LP is the owner of record. Holder +Southwick Architects is the design firm of record. Robert W Green is the registered accessibility specialist for the filing.

When is the construction scheduled to finish?

Construction is scheduled to finish in December 2027. The project started in August 2026 after TDLR plan review was completed in August 2026.

Is the business open for business?

The TDLR record tracks construction status, not business operations. The filing indicates the project is scheduled to finish in December 2027. Third-party mentions describe the park as completed in 2025 and available for sale or lease.

What is the estimated cost of this renovation?

The estimated cost is $112,537. This amounts to $101 per square foot for the 1,116 sq ft space. This cost is below the Travis County median for similar renovation filings.

What is BCEI Finish Out?

BCEI Finish Out is a renovation/alteration project at 5615 S FM 973 Rd Ste 960 in Del Valle, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Finish-out of break room, showers, and upgrade to interior lighting. Fork lift ramp modifications.

Is BCEI Finish Out open in Del Valle?

BCEI Finish Out is still under construction in Del Valle, TX, with an estimated completion of Dec 2027 according to its TDLR registration.

Where is BCEI Finish Out located?

BCEI Finish Out is located at 5615 S FM 973 Rd Ste 960, Del Valle, TX, 78616, in Travis County.

Who is the owner or developer of BCEI Finish Out?

HPF OZ Holdings, LP is the property owner/developer of record for BCEI Finish Out, per its TDLR project registration.

Who is the architect or design firm for BCEI Finish Out?

Holder +Southwick Architects is the design firm of record for BCEI Finish Out, according to its TDLR filing.

How much does BCEI Finish Out cost and how big is it?

BCEI Finish Out has an estimated construction value of $113K and approximately 1,116 square feet (about $101/sqft), based on its TDLR filing.

Scope of Work

Finish-out of break room, showers, and upgrade to interior lighting. Fork lift ramp modifications.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

5615 S FM 973 Rd Ste 960, Del Valle, TX, 78616

30.17226, -97.65261

Related City Permits

Building permits found at or near this location

5611 1/2 S FM 973 RD
108 ft away

Temporary Power for Temp Construction Trailer [for the workers] ref. SP-2019-0345D

FinalElectrical PermitTemporary LoopSep 2024
View Details
2024-110692 EP
Verde Services, LLC
5611 F M Road 973 South C 00000
108 ft away

Cablevision Loop

FinalMechanical PermitRemodelJul 1988
$500
View Details
1988-015176 MP
5611 F M Road 973 South C 00000
108 ft away

Cablevision Loop

FinalElectrical PermitRemodelJul 1988
$500
View Details
1988-015176 EP

Watch all construction in 78616 (Del Valle)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Del Valle?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.