Project intelligenceTDLR TABS2026025892Renovation/Alteration
Funding type

This project is privately funded, on private land for private use.

TOCA Soccer Center in Allen, TX

950 E. Main Street, Allen, TX, 75002

Target date passed (Oct 2026)Project Registered

TOCA Soccer Center is a renovation/alteration project at 950 E. Main Street, Allen, in Collin County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Oct 2026 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $110K across about 62,500 sq ft.

Estimated project value
$110K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
62,500 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$2/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
2 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

Explore the linked construction record and source history

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Jul 22, 2026100 days across supplied datesOct 30, 2026

3 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    26 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    74 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About TOCA Soccer Center

The TOCA Soccer Center Allen project involves a $110,000 renovation at 950 E. Main Street in Allen, Collin County. This 62,500-square-foot facility is undergoing significant alterations to its interior layout and service counters. Blue Sky Sports Center of Allen is the owner and developer of record for this privately funded work. The project was registered with the Texas Department of Licensing and Regulation (TDLR) in July 2026, placing it under the state’s accessibility compliance framework.

Scope of Alterations

The filing details specific changes to the indoor infrastructure. The work includes the reconfiguration of the existing indoor soccer fields to optimize the playing surface. Additionally, the project involves the construction of a new check-in desk to improve customer flow. A key component of the accessibility work is the construction of a new accessible transaction counter at the existing Snack Bar. Southwest Green Development, LLC, doing business as Southwest Green Design, serves as the design firm. Clinton P Ryan is the registered accessibility specialist overseeing the compliance aspects.

Cost and Timeline

The estimated cost for these improvements is $110,000. When divided by the total square footage, the cost per square foot is $2. This figure is notably below the median cost per square foot of $78 for similar renovation and alteration projects in Collin County. The median estimated cost for such projects in the county is $221,000, meaning this project’s budget falls into the bottom quarter of comparable filings. The scheduled build window is 74 days, which is close to the county median of 92 days. Construction is targeted to begin in August 2026.

Completion of the renovation work is targeted for October 2026. The project is situated on private land for private use. The project status remains registered with TDLR, with plan review pending. The facility serves as a location for indoor soccer activities in the Allen area.

Project Registered

Project has been registered with TDLR and is in pre-construction phase

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 75002 (Allen)

One email per change. Unsubscribe in one click. Privacy.

TOCA Soccer Center is a Renovation/Alteration project located at 950 E. Main Street, Allen, TX 75002 in Allen, Texas. The project has an estimated value of $110K covering 62,500 sq ft. Blue Sky Sports Center of Allen is the property owner and Southwest Green Development, LLC d/b/a Southwest Green Design is the design firm of record. The project was registered with TDLR on July 22, 2026.

Frequently Asked Questions

Is the TOCA Soccer Center Allen open?

The TDLR record covers construction only and does not record whether the business has started serving customers. The project is registered and plan review is pending.

Who is the owner of the TOCA Soccer Center Allen project?

Blue Sky Sports Center of Allen is the owner and developer of record for this renovation project located at 950 E. Main Street in Allen.

What is the total square footage of the facility?

The facility encompasses 62,500 square feet. The renovation work affects the interior layout and service areas within this total space.

When does construction start?

Construction is scheduled to begin in August 2026. The project was registered with TDLR in July 2026.

Is the project in a flood zone?

The site is located outside the FEMA Special Flood Hazard Area, specifically in zone X, according to the National Flood Hazard Layer data.

What is TOCA Soccer Center?

TOCA Soccer Center is a renovation/alteration project at 950 E. Main Street in Allen, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Reconfiguration of indoor soccer fields, construction of new check-in desk, construction of new accessible transaction counter at existing Snack Bar

Is TOCA Soccer Center open in Allen?

TOCA Soccer Center was scheduled to finish construction in Oct 2026 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.

Where is TOCA Soccer Center located?

TOCA Soccer Center is located at 950 E. Main Street, Allen, TX, 75002, in Collin County.

Who is the owner or developer of TOCA Soccer Center?

Blue Sky Sports Center of Allen is the property owner/developer of record for TOCA Soccer Center, per its TDLR project registration.

Who is the architect or design firm for TOCA Soccer Center?

Southwest Green Development, LLC d/b/a Southwest Green Design is the design firm of record for TOCA Soccer Center, according to its TDLR filing.

How much does TOCA Soccer Center cost and how big is it?

TOCA Soccer Center has an estimated construction value of $110K and approximately 62,500 square feet (about $2/sqft), based on its TDLR filing.

Scope of Work

Reconfiguration of indoor soccer fields, construction of new check-in desk, construction of new accessible transaction counter at existing Snack Bar

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

950 E. Main Street, Allen, TX, 75002

Loading location map…
33.10019, -96.64677

Watch all construction in 75002 (Allen)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.