Car Wash & Prewash Building in Taylor, TX

14150 U.S. Highway 79, Taylor, TX, 76574

Opening ~Jan 2027Review Complete

Car Wash & Prewash Building is a new construction project at 14150 U.S. Highway 79, Taylor, in Williamson County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Jan 2027. The project has an estimated value of $750K across about 1,792 sq ft.

Estimated project value
$750K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
1,792 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$419/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
5 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Jul 24, 2026180 days across supplied datesJan 20, 2027

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    22 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    5 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    153 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About Car Wash & Prewash Building

A new 1,792 sq ft car wash and prewash facility is under construction at 14150 U.S. Highway 79 in Taylor, Texas. The project, filed as the Nyle Maxwell CDRJ, involves the new construction of an unsprinklered, single-story building designed for vehicle cleaning services. The structure utilizes concrete masonry unit walls and features a standing seam metal panel roof. TDLR completed plan review in August 2026 and construction is scheduled to finish in January 2027, with work starting August 2026.

Project Scope and Specifications

Owner Austin MKA Investments, LTD is developing the site on private land in Williamson County. The estimated cost for this private, privately funded project is $750,000, which calculates to $419 per square foot. This cost per square foot is above the county median of $110 for new construction filings in the last 24 months. The overall estimated cost is close to the county median of $850,862 for similar projects. The scheduled build window of 158 days is shorter than the county median of 245 days.

CDI Douglass-Pye serves as the design firm of record for this development. Kathy Ann Riley is the registered accessibility specialist associated with the filing. The project was registered with TDLR in July 2026. This placement ensures the facility is not subject to mandatory flood insurance requirements based on federal hazard maps.

Local Context and Market Data

Taylor is a city in Williamson County with a population of about 19,746 according to U.S. Census ACS 2023 five-year estimates for ZIP 76574. The median household income in this area is $72,805, and the median owner-occupied home value is $252,000. Housing in the area is predominantly owner-occupied, with 8,458 housing units recorded. Austin MKA Investments, LTD has one other TDLR-registered project totaling $18,000,000, also located in Taylor. CDI Douglass-Pye has six other registered projects totaling $19,540,014 across Texas, including locations in Houston.

Williamson County unemployment rate was 4.1 percent in July 2026, higher than a year earlier. The project status is listed as Review Complete, indicating that the necessary construction plans have been approved by the state. Readers should note that construction completion does not automatically signify business opening, as operational readiness depends on separate local permits and inspections beyond the state-level accessibility registration.

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 76574 (Taylor)

One email per change. Unsubscribe in one click. Privacy.

Car Wash & Prewash Building is a New Construction project located at 14150 U.S. Highway 79, Taylor, TX 76574 in Taylor, Texas. The project has an estimated value of $750K covering 1,792 sq ft. Austin MKA Investments, LTD is the property owner and CDI Douglass-Pye is the design firm of record. The project was registered with TDLR on July 24, 2026.

Frequently Asked Questions

Is the car wash at 14150 U.S. Highway 79 open?

The TDLR record shows construction is scheduled to finish in January 2027. There is no information in the provided facts confirming that the business is open or operating. Construction status and business opening are distinct processes.

Who is building the Nyle Maxwell CDRJ project?

Austin MKA Investments, LTD is the owner of record. CDI Douglass-Pye is the design firm. Kathy Ann Riley is the registered accessibility specialist. The project is privately funded and located on private land in Taylor.

What is the estimated cost of the new car wash?

The estimated cost is $750,000. This amounts to $419 per square foot for the 1,792 sq ft building. This cost per square foot is above the county median of $110 for new construction filings.

When is construction expected to be complete?

Construction started in August 2026 and is scheduled to finish in January 2027. The total build window is approximately 158 days, which is shorter than the county median of 245 days for similar projects.

Is the site in a flood zone?

It is designated as zone X on the FEMA National Flood Hazard Layer, meaning it is not subject to mandatory flood insurance based on federal maps.

What is Car Wash & Prewash Building?

Car Wash & Prewash Building is a new construction project at 14150 U.S. Highway 79 in Taylor, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: THIS PROPOSED PROJECT REQUIRES THE NEW CONSTRUCTION OF AN UNSPRINKLERED, SINGLE STORY PRE WASH & CAR WASH BUILDING . THIS FACILITY WILL BE CONSTRUCTED UTILIZING CONCRETE MASONRY UNIT WALL. THE ROOF IS TO BE STANDING SEAM METAL PANEL ROOF.

Is Car Wash & Prewash Building open in Taylor?

Car Wash & Prewash Building is still under construction in Taylor, TX, with an estimated completion of Jan 2027 according to its TDLR registration.

Where is Car Wash & Prewash Building located?

Car Wash & Prewash Building is located at 14150 U.S. Highway 79, Taylor, TX, 76574, in Williamson County.

Who is the owner or developer of Car Wash & Prewash Building?

Austin MKA Investments, LTD is the property owner/developer of record for Car Wash & Prewash Building, per its TDLR project registration.

Who is the architect or design firm for Car Wash & Prewash Building?

CDI Douglass-Pye is the design firm of record for Car Wash & Prewash Building, according to its TDLR filing.

How much does Car Wash & Prewash Building cost and how big is it?

Car Wash & Prewash Building has an estimated construction value of $750K and approximately 1,792 square feet (about $419/sqft), based on its TDLR filing.

Scope of Work

THIS PROPOSED PROJECT REQUIRES THE NEW CONSTRUCTION OF AN UNSPRINKLERED, SINGLE STORY PRE WASH & CAR WASH BUILDING . THIS FACILITY WILL BE CONSTRUCTED UTILIZING CONCRETE MASONRY UNIT WALL. THE ROOF IS TO BE STANDING SEAM METAL PANEL ROOF.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

14150 U.S. Highway 79, Taylor, TX, 76574

Loading location map…
30.57019, -97.40973

Watch all construction in 76574 (Taylor)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.