Funding type
This project involves public funds, public land, or is a Federally funded roadway project.
Ted Polk Middle School Renovations in Carrollton, TX
2001 Kelly Blvd., Carrollton, TX, 75006
Ted Polk Middle School Renovations is a renovation/alteration project at 2001 Kelly Blvd., Carrollton, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Jan 2028. The project has an estimated value of $3.0M across about 25,000 sq ft.
- Estimated project value
- $3.0M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 25,000 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $120/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 8 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
63 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
231 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
245 days after the preceding date shown.
Source: TDLR filing
View source record
📰About Ted Polk Middle School Renovations
Ted Polk Middle School in Carrollton is undergoing a significant renovation and alteration project valued at $3,000,000. The work, filed under the name Ted Polk Middle School Renovations, covers 25,000 square feet of the facility located at 2001 Kelly Blvd. This scope includes interior renovation and front entry flatwork, representing a substantial physical update to the school infrastructure in Dallas County.
The project is owned by the Carrollton-Farmers Branch Independent School District and designed by Corgan Associates. Brittany Lynn Miller serves as the registered accessibility specialist for this filing. The estimated cost of $120 per square foot places the project above the county median of $72 for similar renovation and alteration work. It also exceeds the median estimated cost for Dallas County filings, which stands at $248,976, and its size is larger than the median 4,226 square feet.
Timeline and Status
TDLR completed plan review in September 2026 and construction is scheduled to finish in January 2028, with work starting May 2027. The scheduled build window spans 245 days, which is longer than the county median of 92 days for comparable projects.
The district has several other major projects in the region, including Barbara Bush Middle School in Irving and Thompson Elementary School in Carrollton. Corgan Associates has also been involved in other significant filings, such as the Apperson project in Dallas and DFW Airport Terminal F. The funding for this specific project involves public funds or public land, ensuring the work aligns with public sector standards for accessibility and construction.
With a total estimated cost of $3,000,000, this renovation is a notable investment in the Carrollton school infrastructure. The project’s status is Review Complete, indicating that the planning phase is finalized and the site is prepared for the upcoming construction start date. The focus on interior renovation and front entry flatwork suggests a comprehensive approach to modernizing the school’s physical environment.
Review Complete
Design review complete, construction may proceed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 75006 (Carrollton)
One email per change. Unsubscribe in one click. Privacy.
Ted Polk Middle School Renovations is a Renovation/Alteration project located at 2001 Kelly Blvd., Carrollton, TX 75006 in Carrollton, Texas. The project has an estimated value of $3.0M covering 25,000 sq ft. Carrollton-Farmers Branch Independent School District is the property owner and Corgan Associates is the design firm of record. The project was registered with TDLR on July 28, 2026.
Frequently Asked Questions
When is construction starting?
Construction is scheduled to begin in May 2027, following the completion of the plan review process in September 2026.
Who is the design firm?
Corgan Associates is the design firm of record for the Ted Polk Middle School Renovations project in Carrollton.
What is the estimated cost?
The estimated cost for the renovation and alteration work is $3,000,000, which amounts to $120 per square foot.
Who owns the property?
The Carrollton-Farmers Branch Independent School District is the owner and developer of record for this project.
What is Ted Polk Middle School Renovations?
Ted Polk Middle School Renovations is a renovation/alteration project at 2001 Kelly Blvd. in Carrollton, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior renovation, front entry flatwork
Is Ted Polk Middle School Renovations open in Carrollton?
Ted Polk Middle School Renovations is still under construction in Carrollton, TX, with an estimated completion of Jan 2028 according to its TDLR registration.
Where is Ted Polk Middle School Renovations located?
Ted Polk Middle School Renovations is located at 2001 Kelly Blvd., Carrollton, TX, 75006, in Dallas County.
Who is the owner or developer of Ted Polk Middle School Renovations?
Carrollton-Farmers Branch Independent School District is the property owner/developer of record for Ted Polk Middle School Renovations, per its TDLR project registration.
Who is the architect or design firm for Ted Polk Middle School Renovations?
Corgan Associates is the design firm of record for Ted Polk Middle School Renovations, according to its TDLR filing.
How much does Ted Polk Middle School Renovations cost and how big is it?
Ted Polk Middle School Renovations has an estimated construction value of $3.0M and approximately 25,000 square feet (about $120/sqft), based on its TDLR filing.
Scope of Work
Interior renovation, front entry flatwork
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
2001 Kelly Blvd., Carrollton, TX, 75006
Related Projects
Same Owner
$70.0M totalWatch all construction in 75006 (Carrollton)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Carrollton?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.