Project intelligenceTDLR TABS2026026678New Construction
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Maple St. Bridge (CSJ: 2398-01-063) in Abilene, TX

At SL 322, Abilene, TX, 79602

Opening ~Sep 2028Review Complete

Maple St. Bridge (CSJ: 2398-01-063) is a new construction project at At SL 322, Abilene, in Taylor County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Sep 2028. The project has an estimated value of $11.6M across about 3,198 sq ft.

Estimated project value
$11.6M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
3,198 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$3.63K/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1y 6mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

Explore the linked construction record and source history

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Jul 31, 2026792 days across supplied datesSep 30, 2028

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    6 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    238 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    548 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About Maple St. Bridge (CSJ: 2398-01-063)

The Maple St. Bridge (CSJ: 2398-01-063) is a new construction project located at SL 322 in Abilene, Texas. This infrastructure development involves the construction of a bridge, along with curbs, gutters, shared use paths, sidewalks, curb ramps, and pavement markings. The total estimated cost for this work is $11,607,143, covering a site area of 3,198 square feet.

TxDOT District: Abilene is the owner of record for this project, which is funded through public funds and is a Federally funded roadway project. AIG Technical Services is listed as the design firm of record. Frank Fonseca is the registered accessibility specialist associated with the filing. The project was registered with TDLR in July 2026.

Construction Timeline and Status

TDLR completed plan review in August 2026, and the status is Review Complete. Construction is scheduled to start in April 2027, with the project scheduled to finish in September 2028. This results in a scheduled build window of 548 days.

The estimated cost per square foot for this project is $3,630. This figure is above the county median of $175 per square foot for similar new construction filings in Taylor County. The total estimated cost is also above the county median of $862,500, placing it in the top quarter of costs for this type of work in the area. The scheduled build window of 548 days is longer than the county median of 245 days.

TxDOT District: Abilene has six other TDLR-registered projects in the region, totaling $187,166,641. These include projects in Abilene, Tuscola, Big Spring, and Sweetwater, all of which have completed review. AIG Technical Services has one other registered project in Abilene with an estimated cost of $530,464, which is also review complete.

The Abilene area, specifically ZIP code 79602, has a population of about 26,588 according to U.S. Census ACS 2023 five-year estimates. The median household income is $84,845, and the median owner-occupied home value is $233,000. Taylor County’s unemployment rate was 3.9 percent in July 2026, which is higher than a year earlier.

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 79602 (Abilene)

One email per change. Unsubscribe in one click. Privacy.

Maple St. Bridge (CSJ: 2398-01-063) is a New Construction project located at At SL 322, Abilene, TX 79602 in Abilene, Texas. The project has an estimated value of $11.6M covering 3,198 sq ft. TxDOT District: Abilene is the property owner and AIG Technical Services is the design firm of record. The project was registered with TDLR on July 31, 2026.

Frequently Asked Questions

When is the Maple St. Bridge project scheduled to finish?

The project is scheduled to finish in September 2028, with construction starting in April 2027. TDLR completed plan review in August 2026.

Who is the owner of the Maple St. Bridge project?

TxDOT District: Abilene is the owner of record for this project. AIG Technical Services is the design firm of record.

What is the estimated cost of the Maple St. Bridge project?

The estimated cost is $11,607,143. The project covers 3,198 square feet, resulting in a cost of $3,630 per square foot.

What is the scope of work for the Maple St. Bridge project?

The scope includes constructing a bridge, curb and gutter, shared use path, sidewalks, curb ramps, and pavement markings.

What is Maple St. Bridge (CSJ: 2398-01-063)?

Maple St. Bridge (CSJ: 2398-01-063) is a new construction project at At SL 322 in Abilene, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Construct bridge, curb and gutter, shared use path, sidewalks, curb ramps and pavement markings.

Is Maple St. Bridge (CSJ: 2398-01-063) open in Abilene?

Maple St. Bridge (CSJ: 2398-01-063) is still under construction in Abilene, TX, with an estimated completion of Sep 2028 according to its TDLR registration.

Where is Maple St. Bridge (CSJ: 2398-01-063) located?

Maple St. Bridge (CSJ: 2398-01-063) is located at At SL 322, Abilene, TX, 79602, in Taylor County.

Who is the owner or developer of Maple St. Bridge (CSJ: 2398-01-063)?

TxDOT District: Abilene is the property owner/developer of record for Maple St. Bridge (CSJ: 2398-01-063), per its TDLR project registration.

Who is the architect or design firm for Maple St. Bridge (CSJ: 2398-01-063)?

AIG Technical Services is the design firm of record for Maple St. Bridge (CSJ: 2398-01-063), according to its TDLR filing.

How much does Maple St. Bridge (CSJ: 2398-01-063) cost and how big is it?

Maple St. Bridge (CSJ: 2398-01-063) has an estimated construction value of $11.6M and approximately 3,198 square feet (about $3.63K/sqft), based on its TDLR filing.

Scope of Work

Construct bridge, curb and gutter, shared use path, sidewalks, curb ramps and pavement markings.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

At SL 322, Abilene, TX, 79602

Loading location map…
32.41038, -99.71022