SUITE DEMISING - LEVEL 1
SUITE DEMISING - LEVEL 1 is a renovation/alteration project at 1300 E 5th St, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Jan 2027. The project has an estimated value of $135K across about 4,585 sq ft.
๐Project Metrics
TDLR #TABS2026026763Project Registered
Project has been registered with TDLR and is in pre-construction phase
SUITE DEMISING - LEVEL 1 is a Renovation/Alteration project located at 1300 E 5th St, Austin, TX 78701 in Austin, Texas. The project has an estimated value of $135K covering 4,585 sq ft. 1300 EAST 5TH ST AUSTIN OWNER LLC is the property owner. The project was registered with TDLR on August 3, 2026.
โFrequently Asked Questions
What is SUITE DEMISING - LEVEL 1?
SUITE DEMISING - LEVEL 1 is a renovation/alteration project at 1300 E 5th St in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: First generation construction of new demising walls and a pedestrian bridge for a new suite entry. Three suites are not occupiable and will be finished out by future tenants.
Is SUITE DEMISING - LEVEL 1 open in Austin?
SUITE DEMISING - LEVEL 1 is still under construction in Austin, TX, with an estimated completion of Jan 2027 according to its TDLR registration.
Where is SUITE DEMISING - LEVEL 1 located?
SUITE DEMISING - LEVEL 1 is located at 1300 E 5th St, Austin, TX, 78701, in Travis County.
Who is the owner or developer of SUITE DEMISING - LEVEL 1?
1300 EAST 5TH ST AUSTIN OWNER LLC is the property owner/developer of record for SUITE DEMISING - LEVEL 1, per its TDLR project registration.
How much does SUITE DEMISING - LEVEL 1 cost and how big is it?
SUITE DEMISING - LEVEL 1 has an estimated construction value of $135K and approximately 4,585 square feet (about $29/sqft), based on its TDLR filing.
๐Scope of Work
First generation construction of new demising walls and a pedestrian bridge for a new suite entry. Three suites are not occupiable and will be finished out by future tenants.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Aug 3, 2026
Review Complete
Inspection Complete
Closed
๐Related Projects
๐คSame Owner
$805K total๐Nearby Projects
Within 1 km๐Related City Permits
Building permits found at or near this location
Temporary Power 21-106027BP
remodel to existing communication tower. REMOVE 15 ants 24 RRUs 24 Dilexers 3 COVPs 3 Legacy hybrid cables 6 non penetrating sleds. INSTALL 3 non penetrating sleds 9 ants 6 RRUs 3 breakout pendnts 3 HCS 2.0 hybrid cables (1/8) Ground Scope: REMOVE 1 FCOA 1 SSC cab existing plinths 3 COVPs 1 ESMB 5 FSMFs 2 FBBAs 5 FBBCs. RELOCATE 1 FSMF. INSTALL 4 ASIBs 2 ASIKs 4 ABILs 3 ABICs 7 ABIAs 3 AMIAs 3 HCS 2.0 junct boxes 1 HPL3 cabinet 1 SB3 cabinet
Gas Test Whse
Temp Meter loop for construction trailer
๐Related Site Plans
City of Austin site plan approvals at this location