Funding type
This project is privately funded, on private land for private use.
Chapelwood UMC, Parking Repaving & Update
300 Willow Drive, Lake Jackson, TX, 77566
Chapelwood UMC, Parking Repaving & Update is a renovation/alteration project at 300 Willow Drive, Lake Jackson, in Brazoria County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Aug 2026 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $650K across about 79,397 sq ft.
- Estimated project value
- $650K
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 79,397 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $8/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 4 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Scheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
Source: TDLR filing
View source recordProject registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
91 days after the preceding date shown.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
11 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
3 days after the preceding date shown.
Source: TDLR filing
View source record
📰About Chapelwood UMC, Parking Repaving & Update
The project known as Chapelwood UMC, Parking Repaving & Update involves the repaving and reconfiguring of the parking lot at 300 Willow Drive in Lake Jackson. The scope covers approximately 79,397 square feet of asphalt. This work is designed to make better use of the available space and update the parking layout in coordination with a new canopy project for the church.
Chapelwood United Methodist Church is the owner of record, with Baker & Lawson, Inc. serving as the design firm. The estimated cost for this renovation/alteration is $650,000. This figure places the project in the top quarter of estimated costs for similar renovation filings in Brazoria County, where the median is $250,000. However, the cost per square foot is $8, which is well below the county median of $90 for this project type.
Timeline and Status
The project was registered with TDLR in August 2026. Plan review was completed in August 2026, and construction was scheduled to begin in May 2026 with a completion date of August 2026. Although the scheduled completion date has passed, TDLR has not yet recorded a final inspection. Therefore, the current state of the site is not confirmed in the public record. The project remains in a status where the physical completion is not verified by the state.
The surrounding area, ZIP code 77566, has a population of about 30,057 and a median household income of $91,406 according to U.S. Census ACS 2023 five-year estimates. The housing stock in this area is mostly owner-occupied, with a median home value of $256,900. This context helps situate the project within a stable, residential community in the Lake Jackson area.
Chapelwood United Methodist Church has one other TDLR-registered project totaling $128,000, which has completed inspection. The design firm, Baker & Lawson, Inc., has another project totaling $634,000 in Surfside Beach, which is also review complete. This indicates that both the owner and the design firm have a history of completing projects in the region. The specific scope of this parking lot update reflects a focused effort to improve infrastructure for the church’s congregation and visitors.
Review Complete
Design review complete, construction may proceed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 77566 (Lake Jackson)
One email per change. Unsubscribe in one click. Privacy.
Chapelwood UMC, Parking Repaving & Update is a Renovation/Alteration project located at 300 Willow Drive, Lake Jackson, TX 77566 in Lake Jackson, Texas. The project has an estimated value of $650K covering 79,397 sq ft. Chapelwood United Methodist Church is the property owner and Baker & Lawson, Inc. is the design firm of record. The project was registered with TDLR on August 3, 2026.
Frequently Asked Questions
Is the parking lot renovation finished?
TDLR has not yet recorded a final inspection, so the completion status is not confirmed in the public record. The scheduled completion date was August 2026.
How big is the parking lot project?
The project covers approximately 79,397 square feet of repaving and reconfiguring. This is significantly larger than the median renovation size in Brazoria County.
Who is designing the project?
Baker & Lawson, Inc. is the design firm of record. They are also involved in another project in Surfside Beach.
What is the estimated cost?
The estimated cost is $650,000. This is above the county median for renovation projects but has a low cost per square foot.
What is Chapelwood UMC, Parking Repaving & Update?
Chapelwood UMC, Parking Repaving & Update is a renovation/alteration project at 300 Willow Drive in Lake Jackson, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: The repaving & reconfiguring of the parking lot area to make better use of space and to update all the parking. Approx. 79,397 sf. This also is in coordination with a new canopy project for the church.
Is Chapelwood UMC, Parking Repaving & Update open in Lake Jackson?
Chapelwood UMC, Parking Repaving & Update was scheduled to finish construction in Aug 2026 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.
Where is Chapelwood UMC, Parking Repaving & Update located?
Chapelwood UMC, Parking Repaving & Update is located at 300 Willow Drive, Lake Jackson, TX, 77566, in Brazoria County.
Who is the owner or developer of Chapelwood UMC, Parking Repaving & Update?
Chapelwood United Methodist Church is the property owner/developer of record for Chapelwood UMC, Parking Repaving & Update, per its TDLR project registration.
Who is the architect or design firm for Chapelwood UMC, Parking Repaving & Update?
Baker & Lawson, Inc. is the design firm of record for Chapelwood UMC, Parking Repaving & Update, according to its TDLR filing.
How much does Chapelwood UMC, Parking Repaving & Update cost and how big is it?
Chapelwood UMC, Parking Repaving & Update has an estimated construction value of $650K and approximately 79,397 square feet (about $8/sqft), based on its TDLR filing.
Scope of Work
The repaving & reconfiguring of the parking lot area to make better use of space and to update all the parking. Approx. 79,397 sf. This also is in coordination with a new canopy project for the church.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
300 Willow Drive, Lake Jackson, TX, 77566
Related Projects
Same Owner
$778K totalSame Design Firm
$1.3M totalNearby Projects
Within 1 kmWatch all construction in 77566 (Lake Jackson)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Lake Jackson?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.