FM 1485 Park Phase 1
18905 FM 1485, New Caney, TX, 77357
FM 1485 Park Phase 1 is a new construction project at 18905 FM 1485, New Caney, in Montgomery County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Feb 2027. The project has an estimated value of $1.0M across about 23,805 sq ft.
- Estimated project value
- $1.0M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 23,805 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $42/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 6 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
3 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
28 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
178 days after the preceding date shown.
Source: TDLR filing
View source record
📰About FM 1485 Park Phase 1
FM 1485 Park Phase 1 is a new construction project in New Caney, Texas, with an estimated cost of $1,000,000. The site at 18905 FM 1485 spans 23,805 square feet, placing its cost per square foot at $42. The project was registered with TDLR in August 2026, and construction is targeted for February 2027.
Scope and Location
The scope of work includes a fenced dog park, a shade shelter, a restroom, and a parking lot with a driveway. The owner of record is East Mongomery County Improvement District, which is utilizing public funds for this infrastructure project. The design firm of record is Burditt land / place.
This project is a one-off new construction filing in the area. The estimated cost is above the county median of $800,000 for similar new construction filings in Montgomery County. However, the cost per square foot of $42 is below the county median of $100. The scheduled build window is 178 days, which is close to the county median of 213 days.
Third-party sources have noted the project's status. A post by Construction Bid Source listed the owner reference and bid date. ConstructConnect described the project as site work, paving, and new construction of a mixed-use development. Starbridge noted that the East Montgomery County Improvement District is soliciting bids for the dog park project. These external references align with the TDLR registration details.
The project is registered with TDLR, and the status is Project Registered. Plan review is pending. The registered accessibility specialist is William T Winning. The construction start date per the filing is September 2026. The completion date on the filing is February 2027. The project is targeted for February 2027.
Project Registered
Project has been registered with TDLR and is in pre-construction phase
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 77357 (New Caney)
One email per change. Unsubscribe in one click. Privacy.
FM 1485 Park Phase 1 is a New Construction project located at 18905 FM 1485, New Caney, TX 77357 in New Caney, Texas. The project has an estimated value of $1.0M covering 23,805 sq ft. East Mongomery County Improvement District is the property owner and Burditt land / place is the design firm of record. The project was registered with TDLR on August 4, 2026.
Frequently Asked Questions
What is the estimated cost of FM 1485 Park Phase 1?
The estimated cost of the project is $1,000,000. This figure is stated in the TDLR registration filing for the new construction project in New Caney.
When is the project targeted for completion?
The project is targeted for February 2027. This date is listed as the completion date on the TDLR filing for the construction project.
Who is the owner of the FM 1485 Park project?
The owner of record is East Mongomery County Improvement District. This entity is listed in the TDLR registration for the new construction project in Montgomery County.
What is the scope of work for this project?
The scope includes a fenced dog park, shade shelter, restroom, parking lot, and driveway. These elements are listed in the TDLR filing for the new construction project.
Is the project in a flood zone?
This information is derived from the FEMA National Flood Hazard Layer for the site coordinates.
What is FM 1485 Park Phase 1?
FM 1485 Park Phase 1 is a new construction project at 18905 FM 1485 in New Caney, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Fenced Dog Park, Shade Shelter, Restroom, Parking lot and Driveway
Is FM 1485 Park Phase 1 open in New Caney?
FM 1485 Park Phase 1 is still under construction in New Caney, TX, with an estimated completion of Feb 2027 according to its TDLR registration.
Where is FM 1485 Park Phase 1 located?
FM 1485 Park Phase 1 is located at 18905 FM 1485, New Caney, TX, 77357, in Montgomery County.
Who is the owner or developer of FM 1485 Park Phase 1?
East Mongomery County Improvement District is the property owner/developer of record for FM 1485 Park Phase 1, per its TDLR project registration.
Who is the architect or design firm for FM 1485 Park Phase 1?
Burditt land / place is the design firm of record for FM 1485 Park Phase 1, according to its TDLR filing.
How much does FM 1485 Park Phase 1 cost and how big is it?
FM 1485 Park Phase 1 has an estimated construction value of $1.0M and approximately 23,805 square feet (about $42/sqft), based on its TDLR filing.
Scope of Work
Fenced Dog Park, Shade Shelter, Restroom, Parking lot and Driveway
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
18905 FM 1485, New Caney, TX, 77357
Watch all construction in 77357 (New Caney)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in New Caney?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.