University Health Hospital - Retama - Level 2 Finish-out in Selma, TX

16300 Retama Parkway, Selma, TX, 78154

Opening ~Jul 2027Review Complete

University Health Hospital - Retama - Level 2 Finish-out is a renovation/alteration project at 16300 Retama Parkway, Selma, in Bexar County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Jul 2027. The project has an estimated value of $13.0M across about 15,750 sq ft.

Estimated project value
$13.0M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
15,750 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$825/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
10 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

Explore the linked construction record and source history

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Aug 4, 2026331 days across supplied datesJul 1, 2027

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    28 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    2 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    301 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About University Health Hospital - Retama - Level 2 Finish-out

University Health Community Hospital - Retama is undergoing a major interior renovation at 16300 Retama Parkway in Selma, Texas. The project, filed as University Health Hospital - Retama - Level 2 Finish-out, involves the finish-out of approximately 15,750 square feet of shell space within the existing hospital facility. This renovation is designed to create new medical surgical patient rooms along with associated staff and support areas, integrating new mechanical, electrical, plumbing, and fire protection systems.

The estimated cost for this renovation is $13,000,000, which equates to $825 per square foot. This figure is significantly above the Bexar County median of $85 per square foot for similar renovation and alteration filings. The project is registered with the Texas Department of Licensing and Regulation (TDLR) and is funded through public sources, as it involves public funds and public land.

Project Timeline and Status

TDLR completed the plan review process in September 2026. Construction is scheduled to start in September 2026 and is scheduled to finish in July 2027. The total build window is 303 days, which is longer than the county median of 103 days for comparable projects. The current TDLR status is listed as Review Complete, indicating that the regulatory approval phase has been successfully concluded.

Bexar County Hospital District is the owner of record for this development. The district has six other TDLR-registered projects totaling $66,600,000, including the Robert B Green Clinical Pavilion and University Health Palo Alto Hospital. Marmon Mok Architecture is the design firm of record, having worked on six other projects totaling $124,660,000, such as the Terminal C Parking Garage in San Antonio. The registered accessibility specialist for this specific filing is Jessica Trevino Hamm.

The site is located in ZIP code 78154, where the U.S. Census estimates a population of about 40,898 and a median household income of $97,465. The area is characterized by mostly owner-occupied housing with a median home value of $296,400. Bexar County’s unemployment rate was 4.7 percent in July 2026, higher than a year earlier, reflecting the local labor market conditions during this construction period.

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 78154 (Selma)

One email per change. Unsubscribe in one click. Privacy.

University Health Hospital - Retama - Level 2 Finish-out is a Renovation/Alteration project located at 16300 Retama Parkway, Selma, TX 78154 in Selma, Texas. The project has an estimated value of $13.0M covering 15,750 sq ft. Bexar County Hospital District is the property owner and Marmon Mok Architecture is the design firm of record. The project was registered with TDLR on August 4, 2026.

Frequently Asked Questions

When is the construction scheduled to finish?

The project is scheduled to finish in July 2027, with work starting in September 2026.

Who is the owner of this hospital renovation?

Bexar County Hospital District is the owner of record for the University Health Community Hospital - Retama project.

What is the estimated cost of the project?

The estimated cost is $13,000,000, which is approximately $825 per square foot for the 15,750 square feet of renovation.

Is the facility open to the public?

The TDLR record indicates the project is under construction and scheduled to finish in July 2027; it does not state that the renovated space is open.

Who is the design firm for this project?

Marmon Mok Architecture is the design firm of record for this renovation project.

What is University Health Hospital - Retama - Level 2 Finish-out?

University Health Hospital - Retama - Level 2 Finish-out is a renovation/alteration project at 16300 Retama Parkway in Selma, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Finish out of shell space in existing hospital. Approx. 15,750 sf. To include new medical surgical patient rooms and associated staff and support areas. Includes new MEPF systems.

Is University Health Hospital - Retama - Level 2 Finish-out open in Selma?

University Health Hospital - Retama - Level 2 Finish-out is still under construction in Selma, TX, with an estimated completion of Jul 2027 according to its TDLR registration.

Where is University Health Hospital - Retama - Level 2 Finish-out located?

University Health Hospital - Retama - Level 2 Finish-out is located at 16300 Retama Parkway, Selma, TX, 78154, in Bexar County.

Who is the owner or developer of University Health Hospital - Retama - Level 2 Finish-out?

Bexar County Hospital District is the property owner/developer of record for University Health Hospital - Retama - Level 2 Finish-out, per its TDLR project registration.

Who is the architect or design firm for University Health Hospital - Retama - Level 2 Finish-out?

Marmon Mok Architecture is the design firm of record for University Health Hospital - Retama - Level 2 Finish-out, according to its TDLR filing.

How much does University Health Hospital - Retama - Level 2 Finish-out cost and how big is it?

University Health Hospital - Retama - Level 2 Finish-out has an estimated construction value of $13.0M and approximately 15,750 square feet (about $825/sqft), based on its TDLR filing.

Scope of Work

Finish out of shell space in existing hospital. Approx. 15,750 sf. To include new medical surgical patient rooms and associated staff and support areas. Includes new MEPF systems.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

16300 Retama Parkway, Selma, TX, 78154

Loading location map…
29.58628, -98.32371

Watch all construction in 78154 (Selma)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.