New Road Bridge Rehabilitation in Waco, TX

New Road between Franklin Ave & Tulane Street and Highland Drive, Waco, TX, 76712

Opening ~Sep 2027Review Complete

New Road Bridge Rehabilitation is a renovation/alteration project at New Road between Franklin Ave & Tulane Street and Highland Drive, Waco, in McLennan County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Sep 2027. The project has an estimated value of $4.6M across about 10,000 sq ft.

Estimated project value
$4.6M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
10,000 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$456/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1 year
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

Explore the linked construction record and source history

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Aug 6, 2026406 days across supplied datesSep 16, 2027

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    8 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    33 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    365 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About New Road Bridge Rehabilitation

New Road Bridge Rehabilitation is a $4,563,675 renovation and alteration project in Waco, Texas. Located at New Road between Franklin Avenue and Tulane Street and Highland Drive, the work involves constructing a new bridge with sidewalks and curb ramps. The City of Waco is the owner of record, and STV Incorporated is the design firm. Construction starts in September 2026 and is scheduled to finish in September 2027.

Project Scale and Cost

The project covers 10,000 square feet at an estimated cost of $4,563,675, resulting in a cost of $456 per square foot. This figure is above the county median of $96 per square foot for renovation and alteration filings in McLennan County. The total cost is also in the top quarter of recent projects in the area. The scheduled build window of 365 days is longer than the county median of 122 days, reflecting the scope of replacing a bridge and associated pedestrian infrastructure.

Eddie Hare is the registered accessibility specialist for this filing. The project was registered with the Texas Department of Licensing and Regulation (TDLR) in August 2026, when plan review was completed. The TDLR status is Review Complete. This registration ensures the project meets state accessibility standards, particularly for the new sidewalks and curb ramps that will serve pedestrians crossing the New Road corridor.

Context and Funding

This project involves public funds and public land. It is part of a broader portfolio of municipal improvements, with the City of Waco having six other TDLR-registered projects totaling over $28 million. STV Incorporated has also been involved in four other registered projects in the region. Census estimates for ZIP code 76712 show a population of about 28,719 and a median household income of $96,267, indicating a community with significant existing housing stock that will benefit from improved road connectivity.

Third-party listings on ConstructConnect describe the project as site work and new construction for a mixed-use development in Waco. The bid date for this project was listed as September 03, 2026, aligning with the planned construction start. New Road Bridge Rehabilitation is a critical piece of infrastructure for the Waco area, connecting key residential and commercial zones. By replacing the existing structure with a new bridge and accessible pedestrian facilities, the City of Waco is modernizing a vital transportation link. The project’s completion is expected to enhance safety and mobility for all users, adhering to the accessibility standards mandated by the state registration process.

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 76712 (Waco)

One email per change. Unsubscribe in one click. Privacy.

New Road Bridge Rehabilitation is a Renovation/Alteration project located at New Road between Franklin Ave & Tulane Street and Highland Drive, Waco, TX 76712 in Waco, Texas. The project has an estimated value of $4.6M covering 10,000 sq ft. City of Waco is the property owner and STV Incorporated is the design firm of record. The project was registered with TDLR on August 6, 2026.

Frequently Asked Questions

When is the New Road Bridge Rehabilitation scheduled to finish?

The project is scheduled to finish in September 2027. Construction is set to begin in September 2026, following the completion of plan review in August 2026. This one-year build window allows for the detailed work involved in replacing the bridge and installing new sidewalks and curb ramps.

Who is the design firm for the New Road Bridge Rehabilitation?

STV Incorporated is the design firm of record for this project. They are responsible for the engineering and design aspects of the new bridge, sidewalks, and curb ramps. The City of Waco is the owner and developer of this infrastructure improvement.

What is the estimated cost of the New Road Bridge Rehabilitation?

The estimated cost for this project is $4,563,675. This amount covers the renovation and alteration of the bridge, as well as the construction of new sidewalks and curb ramps. The cost per square foot is calculated at $456 for the 10,000 square feet of work.

Is the New Road Bridge Rehabilitation located in a flood zone?

It is designated as zone X on the FEMA National Flood Hazard Layer, which indicates a lower risk of flooding compared to designated flood zones. This status is based on the site coordinates provided in the project filing.

What specific work is included in the scope of the New Road Bridge Rehabilitation?

The scope of work includes the construction of a new bridge, along with new sidewalks and curb ramps. This renovation and alteration project aims to improve accessibility and infrastructure at the intersection of New Road, Franklin Avenue, Tulane Street, and Highland Drive in Waco.

What is New Road Bridge Rehabilitation?

New Road Bridge Rehabilitation is a renovation/alteration project at New Road between Franklin Ave & Tulane Street and Highland Drive in Waco, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: New Bridge with sidewalks and curb ramps

Is New Road Bridge Rehabilitation open in Waco?

New Road Bridge Rehabilitation is still under construction in Waco, TX, with an estimated completion of Sep 2027 according to its TDLR registration.

Where is New Road Bridge Rehabilitation located?

New Road Bridge Rehabilitation is located at New Road between Franklin Ave & Tulane Street and Highland Drive, Waco, TX, 76712, in McLennan County.

Who is the owner or developer of New Road Bridge Rehabilitation?

City of Waco is the property owner/developer of record for New Road Bridge Rehabilitation, per its TDLR project registration.

Who is the architect or design firm for New Road Bridge Rehabilitation?

STV Incorporated is the design firm of record for New Road Bridge Rehabilitation, according to its TDLR filing.

How much does New Road Bridge Rehabilitation cost and how big is it?

New Road Bridge Rehabilitation has an estimated construction value of $4.6M and approximately 10,000 square feet (about $456/sqft), based on its TDLR filing.

Scope of Work

New Bridge with sidewalks and curb ramps

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

New Road between Franklin Ave & Tulane Street and Highland Drive, Waco, TX, 76712

Loading location map…
31.51707, -97.16451