Take 5 Oil Change is a new construction project at 515 W Washington St, Cleveland, in Liberty County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Mar 2027. The project has an estimated value of $800K across about 1,648 sq ft.

Estimated project value
$800K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
1,648 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$485/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
4 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Aug 7, 2026224 days across supplied datesMar 19, 2027

3 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    96 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    128 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About Take 5 Oil Change

Take 5 Oil Change - Cleveland is a new construction project located at 515 W Washington St in Cleveland, Texas. The filing identifies the scope of work as a new oil change facility with a total estimated cost of $800,000. The building is designed to be 1,648 sq ft, resulting in a computed cost of $485 per square foot. This specific project is registered with TDLR under the project name Take 5 Oil Change - Cleveland.

The owner and developer of record is TKRE Willowbrook, while the design firm of record is Altar Group. Kari Thomas is the registered accessibility specialist for this project. The work is privately funded and will be built on private land for private use. The project was registered with TDLR in August 2026, and the construction start date per the filing is November 2026.

Construction Timeline and Status

According to the TDLR record, plan review is pending and completion is targeted for March 2027. The scheduled build window for this project is 128 days. This duration is shorter than the county median of 240 days for similar new construction filings in Liberty County.

Altar Group has six other TDLR-registered projects for Take 5 Oil Change locations across Texas, including in Houston, Ennis, Willis, Harker Heights, and Port Arthur. These other projects have varying costs, ranging from $50,000 to $850,000, and are all listed as project registered. The Cleveland project fits within this broader portfolio of new facility developments.

Local Context and Comparison

The estimated cost of $800,000 is close to the county median of $850,000 for new construction filings in Liberty County. However, the $485 cost per square foot is above the county median of $119. The project size of 1,648 sq ft is smaller than the median size of 8,210 sq ft for these filings. These figures are computed from 294 TDLR-registered new construction filings in the county, with 60 registered in the last 24 months.

Census estimates for ZIP code 77327 indicate a population of about 37,574 and a median household income of $57,538. The area has 12,967 housing units, with a median owner-occupied home value of $144,100. Housing in this ZIP code is predominantly owner-occupied. The Liberty County unemployment rate was 6.4 percent in July 2026, which is higher than a year earlier.

Project Registered

Project has been registered with TDLR and is in pre-construction phase

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 77327 (Cleveland)

One email per change. Unsubscribe in one click. Privacy.

Take 5 Oil Change is a New Construction project located at 515 W Washington St, Cleveland, TX 77327 in Cleveland, Texas. The project has an estimated value of $800K covering 1,648 sq ft. TKRE Willowbrook is the property owner and Altar Group is the design firm of record. The project was registered with TDLR on August 7, 2026.

Frequently Asked Questions

Is Take 5 Oil Change Cleveland open for business?

The TDLR record indicates the project is registered and completion is targeted for March 2027. It does not confirm that the business is open or operating. Plan review is still pending.

What is the address of the new Take 5 Oil Change in Cleveland?

The project is located at 515 W Washington St, Cleveland, TX 77327. This is the address listed in the TDLR registration for the new oil change facility.

Who is the developer for this project?

The owner and developer of record is TKRE Willowbrook. The design firm of record is Altar Group, and Kari Thomas is the registered accessibility specialist.

How much does the project cost?

The estimated cost is $800,000. The building is 1,648 sq ft, which computes to $485 per square foot. This cost is close to the Liberty County median for new construction.

When is the project expected to be finished?

Completion is targeted for March 2027. Construction start is scheduled for November 2026, and the project was registered with TDLR in August 2026. Plan review is pending.

What is Take 5 Oil Change?

Take 5 Oil Change is a new construction project at 515 W Washington St in Cleveland, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: New Oil Change Facility

Is Take 5 Oil Change open in Cleveland?

Take 5 Oil Change is still under construction in Cleveland, TX, with an estimated completion of Mar 2027 according to its TDLR registration.

Where is Take 5 Oil Change located?

Take 5 Oil Change is located at 515 W Washington St, Cleveland, TX, 77327, in Liberty County.

Who is the owner or developer of Take 5 Oil Change?

TKRE Willowbrook is the property owner/developer of record for Take 5 Oil Change, per its TDLR project registration.

Who is the architect or design firm for Take 5 Oil Change?

Altar Group is the design firm of record for Take 5 Oil Change, according to its TDLR filing.

How much does Take 5 Oil Change cost and how big is it?

Take 5 Oil Change has an estimated construction value of $800K and approximately 1,648 square feet (about $485/sqft), based on its TDLR filing.

Scope of Work

New Oil Change Facility

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

515 W Washington St, Cleveland, TX, 77327

30.33782, -95.09282

Watch all construction in 77327 (Cleveland)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Cleveland?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.