Funding type
This project is privately funded, on private land for private use.
CNG Fueling Station SAIA Houston New Time Fill Station
9051 Railwood Dr, Houston, TX, 77078
CNG Fueling Station SAIA Houston New Time Fill Station is a renovation/alteration project at 9051 Railwood Dr, Houston, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Jun 2027. The project has an estimated value of $2.8M across about 2,600 sq ft.
- Estimated project value
- $2.8M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 2,600 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $1.08K/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 6 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
66 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
78 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
180 days after the preceding date shown.
Source: TDLR filing
View source record
📰About CNG Fueling Station SAIA Houston New Time Fill Station
SAIA Motor Freight Line Inc is renovating its Houston terminal at 9051 Railwood Dr to install a compressed natural gas (CNG) fueling station. The project, filed with the Texas Department of Licensing and Regulation (TDLR) as the CNG Fueling Station SAIA Houston New Time Fill Station, involves a $2,800,000 expenditure for 2,600 sq ft of site improvements. TDLR completed plan review in October 2026 and construction is scheduled to finish in June 2027, with work starting January 2027.
The scope of work focuses on adding 50 time fill spots to the existing pavement, requiring only striping for the new bays. The installation includes quick fill posts and hoses, a compressor compound, and storage vessels. Additional infrastructure consists of a backup generator, dryer, and new electric and gas connections. The site will also receive a new light pole, safety systems, fencing, and other minor site work to support the fueling operations.
Clean Energy serves as the design firm of record for this renovation. The project is privately funded on private land for private use, reflecting SAIA's internal infrastructure upgrade rather than a public utility expansion. The estimated cost of $2,800,000 places this project above the Harris County median for renovation and alteration filings, which stands at $250,000. The calculated cost per square foot is $1,077, significantly higher than the county median of $80 per square foot for similar work types.
The scheduled build window is 180 days, which is longer than the Harris County median of 92 days for renovation and alteration projects. This extended timeline allows for the complex installation of heavy mechanical systems like the compressor compound and storage vessels. The location is in ZIP code 77078, a area with a population of about 14,705 according to U.S. Census American Community Survey 2023 five-year estimates. The median household income in this ZIP code is $38,838, and the median owner-occupied home value is $151,500.
SAIA LTL Freight has operated in the region since 1924, with its Houston terminal listed at this address in company records. The addition of CNG fueling capabilities supports the logistics needs of the freight line. The project status is Review Complete, indicating that all necessary permits and plans have been approved by the state regulatory body. Construction is set to begin in January 2027, marking the start of the physical installation phase for the new fueling infrastructure.
Review Complete
Design review complete, construction may proceed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 77078 (Houston)
One email per change. Unsubscribe in one click. Privacy.
CNG Fueling Station SAIA Houston New Time Fill Station is a Renovation/Alteration project located at 9051 Railwood Dr, Houston, TX 77078 in Houston, Texas. The project has an estimated value of $2.8M covering 2,600 sq ft. SAIA Motor Freight Line Inc is the property owner and Clean Energy is the design firm of record. The project was registered with TDLR on August 10, 2026.
Frequently Asked Questions
What is the primary purpose of the renovation at 9051 Railwood Dr?
The renovation installs a CNG fueling station with 50 time fill spots, quick fill posts, a compressor compound, and storage vessels to support SAIA's freight operations.
When is the construction scheduled to finish?
Construction is scheduled to finish in June 2027, following a start date of January 2027. TDLR completed plan review in October 2026.
Who is the owner and design firm for this project?
SAIA Motor Freight Line Inc is the owner of record. Clean Energy is the design firm of record for the CNG fueling station renovation.
Is the business open for public fueling?
The project is for private use on private land. The facts describe construction status, not public operating hours or availability.
How does the cost compare to other Harris County projects?
The $2,800,000 cost is above the Harris County median of $250,000 for renovation and alteration filings. The cost per square foot is $1,077, above the county median of $80.
What is CNG Fueling Station SAIA Houston New Time Fill Station?
CNG Fueling Station SAIA Houston New Time Fill Station is a renovation/alteration project at 9051 Railwood Dr in Houston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Install 50-time fill spots (existing pavement, striping only), quick fill posts/hoses, compressor compound, storage vessels backup generator, dryer, electric and gas connections, new light pole, safety systems, fencing and other minor si…
Is CNG Fueling Station SAIA Houston New Time Fill Station open in Houston?
CNG Fueling Station SAIA Houston New Time Fill Station is still under construction in Houston, TX, with an estimated completion of Jun 2027 according to its TDLR registration.
Where is CNG Fueling Station SAIA Houston New Time Fill Station located?
CNG Fueling Station SAIA Houston New Time Fill Station is located at 9051 Railwood Dr, Houston, TX, 77078, in Harris County.
Who is the owner or developer of CNG Fueling Station SAIA Houston New Time Fill Station?
SAIA Motor Freight Line Inc is the property owner/developer of record for CNG Fueling Station SAIA Houston New Time Fill Station, per its TDLR project registration.
Who is the architect or design firm for CNG Fueling Station SAIA Houston New Time Fill Station?
Clean Energy is the design firm of record for CNG Fueling Station SAIA Houston New Time Fill Station, according to its TDLR filing.
How much does CNG Fueling Station SAIA Houston New Time Fill Station cost and how big is it?
CNG Fueling Station SAIA Houston New Time Fill Station has an estimated construction value of $2.8M and approximately 2,600 square feet (about $1.08K/sqft), based on its TDLR filing.
Scope of Work
Install 50-time fill spots (existing pavement, striping only), quick fill posts/hoses, compressor compound, storage vessels backup generator, dryer, electric and gas connections, new light pole, safety systems, fencing and other minor site work.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
9051 Railwood Dr, Houston, TX, 77078
Explore the supplied address
A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.
Watch all construction in 77078 (Houston)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Houston?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.