Project intelligenceTDLR TABS2026027940Renovation/Alteration
Funding type

This project is privately funded, on private land for private use.

Westminster United Methodist Church - Partial Demolition

5801 San Felipe St., Houston, TX 77057, Houston, TX, 77057

Opening ~Dec 2026Review Complete

Westminster United Methodist Church - Partial Demolition is a renovation/alteration project at 5801 San Felipe St., Houston, TX 77057, Houston, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Dec 2026. The project has an estimated value of $871K across about 1,821 sq ft.

Estimated project value
$871K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
1,821 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$478/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
2 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

Explore the linked construction record and source history

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Aug 14, 2026139 days across supplied datesDec 31, 2026

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    46 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    34 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    59 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About Westminster United Methodist Church - Partial Demolition

Westminster United Methodist Church is renovating its administrative building at 5801 San Felipe St. in Houston. The project, filed as a partial demolition and reconstruction, involves specific structural changes to the existing facility. The estimated cost for this work is $870,771, covering 1,821 square feet of alteration and rebuilding.

The scope of work includes the partial demolition of the existing church administrative building, which is connected to the sanctuary and day school. The plan requires building a new back wall at the existing gable end and providing new columns as required. Additionally, the project involves constructing a new back exterior wall for the existing storage room. This targeted renovation focuses on structural integrity and spatial redefinition rather than a full replacement of the structure.

Project Details and Timeline

TDLR completed plan review in September 2026 and construction is scheduled to finish in December 2026, with work starting November 2026. The project is privately funded on private land for private use. It is registered with the Texas Department of Licensing and Regulation, ensuring compliance with state accessibility standards. The registered accessibility specialist for this filing is Jeromy G Murphy.

Jackson & Ryan Architects serves as the design firm of record. The estimated cost per square foot is $478. This figure is above the county median of $80 for renovation and alteration projects in Harris County. The scheduled build window of 59 days is shorter than the county median of 92 days for similar filings.

The site is in ZIP code 77057, where the U.S. Census estimates a population of about 45,394. The median household income in this area is $66,200, and the median owner-occupied home value is $318,700. Housing in this ZIP code is mostly renter-occupied. The Harris County unemployment rate was 5.2 percent in July 2026, higher than a year earlier. These local economic factors provide context for the private development activity in the neighborhood.

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 77057 (Houston)

One email per change. Unsubscribe in one click. Privacy.

Westminster United Methodist Church - Partial Demolition is a Renovation/Alteration project located at 5801 San Felipe St., Houston, TX 77057, Houston, TX 77057 in Houston, Texas. The project has an estimated value of $871K covering 1,821 sq ft. Westminster United Methodist Church is the property owner and Jackson & Ryan Architects is the design firm of record. The project was registered with TDLR on August 14, 2026.

Frequently Asked Questions

What is the scope of the Westminster UMC renovation?

The project involves partial demolition of the administrative building, building a new back wall at the gable end, adding new columns, and constructing a new exterior wall for the storage room.

Who is the architect for this project?

Jackson & Ryan Architects is the design firm of record for the Westminster United Methodist Church renovation in Houston.

When will construction be finished?

Construction is scheduled to finish in December 2026, with work starting in November 2026 following plan review completion in September 2026.

Is the church building open for services?

The TDLR record only tracks construction status. It does not confirm whether the sanctuary or other parts of the church are open for public use.

How much does the renovation cost per square foot?

The estimated cost is $478 per square foot, which is above the Harris County median of $80 for similar renovation and alteration filings.

What is Westminster United Methodist Church - Partial Demolition?

Westminster United Methodist Church - Partial Demolition is a renovation/alteration project at 5801 San Felipe St., Houston, TX 77057 in Houston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Partial demolition of existing church administrative building connected to existing sanctuary and day school and build back wall of existing gable end and provide new columns as req'd and build back exterior wall of existing storage room.

Is Westminster United Methodist Church - Partial Demolition open in Houston?

Westminster United Methodist Church - Partial Demolition is still under construction in Houston, TX, with an estimated completion of Dec 2026 according to its TDLR registration.

Where is Westminster United Methodist Church - Partial Demolition located?

Westminster United Methodist Church - Partial Demolition is located at 5801 San Felipe St., Houston, TX 77057, Houston, TX, 77057, in Harris County.

Who is the owner or developer of Westminster United Methodist Church - Partial Demolition?

Westminster United Methodist Church is the property owner/developer of record for Westminster United Methodist Church - Partial Demolition, per its TDLR project registration.

Who is the architect or design firm for Westminster United Methodist Church - Partial Demolition?

Jackson & Ryan Architects is the design firm of record for Westminster United Methodist Church - Partial Demolition, according to its TDLR filing.

How much does Westminster United Methodist Church - Partial Demolition cost and how big is it?

Westminster United Methodist Church - Partial Demolition has an estimated construction value of $871K and approximately 1,821 square feet (about $478/sqft), based on its TDLR filing.

Scope of Work

Partial demolition of existing church administrative building connected to existing sanctuary and day school and build back wall of existing gable end and provide new columns as req'd and build back exterior wall of existing storage room.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

5801 San Felipe St., Houston, TX 77057, Houston, TX, 77057

Location by street address

Watch all construction in 77057 (Houston)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.